Examples of Pipeline Release in a sentence
The line leak detection method must be certified by a third party and meet US EPA testing procedures in Standard Test Procedures for Evaluating Release Detection Methods: Pipeline Release Detection (EPA 510-B-19-005) May 2019 or as revised by EPA.
Between 2009 and 2011, Chevron Environmental Management Company (CEMC) completed remedial excavations at three areas including the Cutter Stock area, 1999 Pipeline Release area, and Control House area.
At the site, petroleum hydrocarbon odors were detected in the soil samples from B-1, B-2 and B-3—the samples collected between the Pipeline Release Point and the Pond Discovery Location.
B-2 was advanced approximately 20 feet northeast of the Pipeline Release Point, between the release point and the pond and almost directly west of the Pond Discovery Location.
Volume 7, Section 6.0 Potential Effects of Pipeline Release (A56025, A3S4V6, p.16) PreambleReference ‘i’ mentioned that a detailed ERA and HHRA for the hypothetical Westridge Marine Terminal spill scenario described in Section 8.0 would be completed and submitted to the NEB in early 2014.
B-3 was advanced approximately 40 feet from the Pipeline Release Point, and northwest of the Pond Discovery Location.
Nominations of candidates for election to the Court may be made by any State Party to this Statute, and shall be made either: tiers des membres de l’Assemblée des États Parties.
Enbridge Line 6B MP 608 Pipeline Release, Marshall, Michigan - Evaluation of Potential Impact of Released Oil on Groundwater used for Drinking Water (Hydrogeological Evaluation Report).
Specific Modifications Required: Enbridge Line 6B MP 608 Pipeline Release, Marshall, Michigan, Quality Assurance Project Plan Addendum to the approved Quality Assurance Project Plan Enbridge Line 6B MP 608, Marshall, Michigan: August 2, 2010 (Revised August 15, 2010 per U.S. EPA August 15, 2010 Letter) 1.
Matt Kaufmann, Hazardous Materials Programs Director, reported: • Update on Five (5) Incidents of Interest:o Kinder Morgan Pipeline Release in Walnut Creek (November 2020) – Hazmat participated in a community air monitoring meeting with OSPR and USEPA to continue to improve joint responses.