Plain Concrete definition
Examples of Plain Concrete in a sentence
Except as specified herein, construct Jointed Plain Concrete (JPC) intersection pavement in accordance with the Department's Standard and Supplemental Specifications, Special Provisions and Special Notes, and Standard and Sepia Drawings, current editions, and as directed by the Engineer.
Except as specified herein, construct Jointed Plain Concrete (JPC) Pavement in accordance with the Department's Standard and Supplemental Specifications, Special Provisions and Special Notes, and Standard and Sepia Drawings, current editions, and as directed by the Engineer.
M 25 - All RCC structural elements above and below ground level, precast concrete, MMS foundation, cable trench, oil pit, Grade Slab, Paving, culverts & road.M-20 (Equivalent nominal Mix of 1:1.5:3)* - Fencing workM-15 (Equivalent Nominal Mix of 1:2:4)*- Base slab of drains.M-10 (Equivalent Nominal Mix of 1:3:6)*- Plain Concrete Cement.
Key WordsJointed Plain Concrete Pavements, Premature Distress, ASR, Petrographic Analysis, Open Graded Subbase, Material Related Distress, MEPDG, Curing, FWD, Fatigue Cracking, Rehabilitation, MIT Dowel Scanning,Drainage, Finite Element Modeling, Shoulders18.
Jointed Plain Concrete Pavement (JPCP) test sections were constructed on the shoulder of SR-14 near Palmdale using Fast-Setting Hydraulic Cement Concrete (FSHCC) for subsequent testing with the HVS.
Two alternatives for pavement were included: (1) Jointed Plain Concrete Pavement (JPCP) Structural Section for new four-lane highway (40-year Pavement Design Life), (2) Hot Mix Asphalt (HMA) Structural Section for new four-lane highway (20-year Pavement Design Life).
The LCCA form (see Attachment F) shows hot mix asphalt (HMA) to be less expensive for initial construction, but maintenance cost is greater than that of Jointed Plain Concrete Pavement (JPCP).
Design options Note the following terminology: HMA Hotmix AsphaltAC Hotmix Asphalt (previously Asphaltic Concrete) JPCP Jointed Plain Concrete PavementCRCP Continuously Reinforced Concrete PavementX over Y Implies a new X material placed over an old (existing) Y material 3.1.2 Site/Project Identification Figure 4.
The recommended pavement option based on the lowest LCCA, overall project scope and schedule, best industry practices, and pavement consistency within the project limits is Jointed Plain Concrete Pavement (40-year design life).
Except as specified herein, construct Jointed Plain Concrete (JPC) Pavement Patching in accordance with the Department's 2012 Standard and Supplemental Specifications, Special Provisions and Special Notes, and Standard and Sepia Drawings, current editions.