Plant functional group definition

Plant functional group means plants that are grouped according to their functional attributes and traits (ie growth form, primary regeneration mode and nutrient acquisition strategy). Refer to Appendix 2 Table F for the plant functional group codes that are used to determine the plant functional group for each plant species.

Examples of Plant functional group in a sentence

  • Plant functional group diversity as a mechanism for invasion resistance.

  • Plant functional group identity and diversity determine biotic resistance to invasion by an exotic grass.

  • Plant functional group effects on peat carbon cycling in a boreal rich fen.

  • In stress tests of Euro Area banks, those with higher exposure to sovereign default risk saw increases in insolvency risk a decrease in new loans and a rise in non-performing loans (Altavilla, Pagano, Simonelli, 2016).

  • Indeed, if at some point in the derivation the output should be exe- cuted only so that P can be executed, the variant of this sec- tion will be blocked, even if later in the search of the deriva- tion, a node justifies the output.

  • Mao R, Zhang XH, Song CC, Wang XW, Finnegan PM (2018) Plant functional group controls litter decomposition rate and its temperature sensitivity: An incubation experiment on litters from a boreal peatland in northeast China.

  • Plant functional group tries to make higher PPA rate and lower tariff structure for the consumer, which is not in favour of the mini-grid.

  • Mr. Roe founded Roe Capital Management in October 2007 and served as the sole principal of the firm from December 2007 to May 2012.

  • Digitálne marketingové techniky, ako je optimalizácia pre vyhľadávače (SEO), marketing pre vyhľadávače (SEM), marketing obsahu, marketingový vplyv, automatizácia obsahu, kampaňový marketing, dátový marketing a e-commerce marketing, optimalizácia, e-mailový priamy marketing, grafická reklama, e-knihy, optickédisky a hry sú čoraz častejšie využívané v našej progresívnej technológii.

  • Figure 1 ALABAMA POWER COMPANY DEPRECIATION STUDY PROCESS ANALYSISAlabama Power Company Steam Production PlantThe Steam Production Plant functional group (“Steam Production Plant”) comprises six Alabama Power generating facilities for depreciation purposes.

Related to Plant functional group

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Operational Services the operational services described as such in the Services Description;

  • Multiphase professional services contract means a contract for the providing of professional

  • Vertical service means an ancillary service that is offered in connection with one or more telecommunications services, which offers advanced calling features that allow customers to identify callers and to manage multiple calls and call connections, including conference bridging services.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • BPO Services means Provider’s business process outsourcing services described in the applicable Solution Exhibit, whereby Provider assumes responsibility for Customers’ business processes.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Electric generation service means the provision of retail

  • Child welfare services means social services including

  • public service infrastructure means publicly controlled infrastructure of the following kinds:

  • Auxiliary Water Supply means any water supply on or available to the premises other than the water purveyor's approved public water supply such as, but not limited to, a private well, pond or river.

  • Municipal separate storm sewer system (MS4 means a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains):

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • energy service means the physical benefit, utility or good derived from a combination of energy with energy-efficient technology or with action, which may include the operations, maintenance and control necessary to deliver the service, which is delivered on the basis of a contract and in normal circumstances has proven to result in verifiable and measurable or estimable energy efficiency improvement or primary energy savings;

  • energy service provider means a natural or legal person who delivers energy services or other energy efficiency improvement measures in a final customer’s facility or premises;

  • Clone means a non-flowering plant cut from a mother plant that is capable of developing into a new plant and has shown no signs of flowering.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Small municipal separate storm sewer system or "small MS4" means all separate storm sewers that are (i) owned or operated by the United States, a state, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under state law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under § 208 of the CWA that discharges to surface waters and (ii) not defined as "large" or "medium" municipal separate storm sewer systems or designated under 4VAC50-60-380 A 1. This term includes systems similar to separate storm sewer systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highway and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as individual buildings.

  • Radiation therapy simulation system means a radiographic or fluoroscopic x-ray system intended for localizing the volume to be exposed during radiation therapy and confirming the position and size of the therapeutic irradiation field.

  • Stray radiation means the sum of leakage and scattered radiation.

  • Basic generation service provider or "provider" means a

  • Transportation network company rider or “rider” means an

  • Asset Management Plan means a plan created by the department and approved by the state transportation commission or a plan created by a local road agency and approved by the local road agency's governing body that includes provisions for asset inventory, performance goals, risk of failure analysis, anticipated revenues and expenses, performance outcomes, and coordination with other infrastructure owners.

  • external engineering service means an engineering service situated outside the boundaries of a land area and that is necessary to serve the use and development of the land area;

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either: