Examples of Production Sites in a sentence
PackageTable 5 Option 1: Both Platform and Applet packages are loaded at IC Manufacturer Site (Option 2) Image loading at IDEMIA and External sitesFLASH image containing both ID-One Cosmo X Platform along with CombICAO Applet v3 is securely delivered directly from the software developer (IDEMIA R&D Audited Site) for loading to CC Audited IDEMIA Production Sites (Refer Audited Production Sites Table) or Non-Audited IDEMIA Sites or External Sites.
IDEMIA CC Audited Production Sites/PlantsIDEMIA CC Audited Production Sites are listed below: Table 4 : Audited Production Sites (Option 1) Image Loading audited IC Manufacturer siteFLASH image containing both the “ID-One Cosmo X” Java Card Platform OS along with the CombICAO Applet v3 is securely delivered directly from the software developer (IDEMIA R&D Audited Site) to the IC Manufacturer (Infineon CC Audited Site) to be loaded into FLASH memory.
TOE Delivery point:• If loading of ID-One Cosmo X Platform + CombICAO Applet v3 is performed in Audited IDEMIA Production Sites, then TOE delivery is considered at the end of Phase 4.
TOE Delivery points:• If loading of the CombICAO Applet v3 on top of already loaded ID-One Cosmo X Platform (as described below) is done in a CC Audited IDEMIA Production Sites then, TOE delivery is considered at the end of Phase 4.
The TnD v5.1 Applet with its Common package along with the TOE’s guidance documentation is securely delivered directly from the Software Developer (IDEMIA R&D Audited Site) to Audited IDEMIA Production Sites (Haarlem, Noida, Vitré, Shenzhen, Ostrava) or Non- Audited IDEMIA Sites or External Sites.Loading of the TnD v5.1 Applet and its Common package on top of the already present COSMO X GP Java Card OS in any of these sites is accomplished by using a GP CLFDB decryption Key.
The applet code will be integrated into FLASH by the IC manufacturer on top of the platform already loaded by IC manufacturer (NXP), or(Option 2) the TnD v5.1 application with Common package and Adapter package and the guidance documentation are securely delivered directly from the software developer (IDEMIA R&D Audited Site) to the travel document manufacturer (IDEMIA Audited Production Sites or IDEMIA Non-Audited Sites) for production.
TOE Delivery points:• If loading of the TnD v5.1 Applet with its Common package on top of already loaded Java Card Platform package (as described below) is done in a CC Audited IDEMIA Production Sites then, TOE delivery is considered at the end of Phase 4.
PackageTable 4 Option 1: Both Platform and Applet packages are loaded at IC Manufacturer Site (Option 2) Image loading at IDEMIA and External sitesFLASH image containing both ID-One Cosmo X Platform along with CombICAO Applet v3 is securely delivered directly from the software developer (IDEMIA R&D Audited Site) for loading to CC Audited IDEMIA Production Sites (Refer Audited Production Sites Table) or Non- Audited IDEMIA Sites or External Sites.
TOE Delivery point:• If loading of ID-One Cosmo X Platform + CombICAO Applet v3 is performed in Audited IDEMIA Production Sites, then TOE delivery is considered at the end of Phase 4.• If loading of ID-One Cosmo X Platform + CombICAO Applet v3 is performed in Non-Audited IDEMIA Production Sites or External Sites, then TOE delivery is considered after Phase 4.
Japan's requirement was in line with the Requirements for the Establishment of Pest Free Places of Production and Pest Free Production Sites of the IPPC (ISPM 10).