progressive mine closure plan means a plan, for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in the manner specified and in the standard format as per the guidelines issued by the Indian Bureau of Mines or State Government;
progressive mine closure plan means a progressive plan for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in the manner specified in the standard format and guidelines issued by Indian Bureau of Mines or the Director, Atomic Minerals Directorate for Exploration and Research in respect of minerals specified in Part B of the First Schedule to the Act where the grade of such atomic minerals is equal to or above the threshold value limits declared under Schedule-A of the Atomic Minerals Concession Rules, 2016, from time to time;
progressive mine closure plan means a Progressive Plan for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in a manner specified in the standard format and guidelines issued by the Indian Bureau of Mines or Department ;

Examples of progressive mine closure plan in a sentence

  • Mining Plan and Progressive mine closure plan are being submitted for the first time.

  • Production since 03.02.2010 has not exceeded the approved figure of 5.0 Lakh Tonnes per annum, hence there has been no violation in the mining activity.Mining scheme including Progressive mine closure plan has been prepared on the basis of low grade gypsum which is now salable reserves & is approved by the Superintending Mining Engineer (SME), Bikaner Circle, Bikaner vide their letter no.

  • ConclusionExtracting phrasal verbs from a corpus, especially when one does not have a list of possible candidates at hand, is a difficult task.

  • Consequently, accessibility was put forward with a lack of focus on pre- deployment testing.

  • Production since 01.10.2008 has not exceeded the approved figure of 3.50 Lakh Tonnes per annum, hence there has been no violation in the mining activity.Latest Mining scheme including Progressive mine closure plan has been prepared on the basis of low grade gypsum which is now salable reserves & is approved by the Superintending Mining Engineer (SME), Bikaner Circle, Bikaner vide their letter no.

  • Date of mine closure approval: -Progressive mine closure plan has been approved by Indian Bureau of Mines for an area of 1018.3085 ha vide letter no.

  • Progressive mine closure plan was approved by the Controller of Mines (CZ), Indian Bureau of Mines vide letter no.

  • Progressive mine closure plan shall be prepared for a period of every five years from the beginning of the mining operations.

  • The information furnished in the Progressive mine closure plan is true and correct to the best of my knowledge and records.

  • See, for example, Balkin, ‘Old-School/New-School Speech Regulation,’ (‘[A] signifi- cant feature of the early twenty-first century is that the infrastructure of free expression increasingly is merging with the infrastructure of speech regulation and the infrastructure of public and private surveillance.’).

Related to progressive mine closure plan

  • Pump spray means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger or other actuator.

  • Co-pilot means a pilot operating other than as pilot-in-command, on an aircraft for which more than one pilot is required, but excluding a pilot who is on board the aircraft for the sole purpose of receiving flight instruction for a licence or rating.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Summer Season in any year, means the Season commencing on 01 April in that year;

  • Fossil fuel-fired means, with regard to a unit:

  • Pretreatment wash primer means the first coat applied to bare metal if solvent-based primers will be applied. This coating:

  • Pest Management Plan and “PMP” means the Recipient’s plan dated March 9, 2010, which: (i) addresses the concerns relating to the Project risks associated with potential increases in the use of pesticides for agricultural production, intensification and diversification and controlling disease vector populations arising from irrigation schemes; (ii) sets forth mitigation and monitoring measures to be taken during Project implementation and operation to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels; (iii) recommends institutional measures to strengthen national capacities to implement the mitigation and monitoring measures; and

  • Ozone season means the period of time beginning May 1 of a year and ending on September 30 of the same year, inclusive.