Project Special Provisions definition
Examples of Project Special Provisions in a sentence
Provide polycarbonate signal heads and visors that comply with the provisions pertaining to Signal Heads within these Project Special Provisions with the following exceptions: Fabricate signal head housings, end caps, and visors from virgin polycarbonate material.
Wherever in the 2012 Standard Specifications, Project Special Provisions, Standard Special Provisions, Permits or Plans that reference is made to “NCDENR” or “North Carolina Department of Environment and Natural Resources”, replace with “NCDEQ” or “North Carolina Department of Environmental Quality” respectively, as the case may be.
Furnish all sensors to monitor vehicle demands for vehicle actuation per the Project Special Provisions and Section 1098 of the Standard Specifications.
The City is responsible to provide Construction Engineering for the Project in accordance with the rules and guidelines developed for the current KDOT approved construction engineering program and in accordance with the current edition of the KDOT Standard Specifications for State Road and Bridge Construction with Special Provisions and any necessary Project Special Provisions.
Payment at the unit price will be based on actual measured quantities in the Work, or planned quantities as stipulated in the Project Special Provisions, except where the unit is a lump sum, in which case payment will be based upon the lump sum price as stated.
The Design-Build Team also must forego any additional compensation that would have otherwise been afforded under the “Value Analysis” and “Measurement and Payment” Project Special Provisions.
As detailed in the Work Zone Traffic Control Project Special Provisions contained elsewhere Portable Changeable Message Signs required as part of the referenced Roadway Standard Drawings and Short Term Closure and Detour of Interstate/Freeway Ramps detail drawing are incidental to the Lane Closure and Ramp/Loop Closure pay items.
All work and materials shall be in accordance with the provisions of the General Guidelines of this contract, the Project Special Provisions, the North Carolina Department of Transportation Standard Specifications for Roads and Structures 2012, the North Carolina Department of Transportation 2012 Roadway Standards Drawings, and the current edition of the Manual of Uniform Traffic Control Devices (MUTCD), with the exception that bid bonds are not required.
All construction and materials shall be in accordance with the NCDOT 2018 Standard Specifications for Roads and Structures and current NCDOT Project Special Provisions unless noted otherwise elsewhere in this RFP.
Construction and Materials shall be in accordance with 2018 NCDOT Standard Specifications for Roads and Structures, NCDOT Structures Management Unit Project Special Provisions, and NCDOT Structures Management Unit Standard Drawings.