Refurbishment and Testing Deed definition

Refurbishment and Testing Deed means the deed between QEC and Comalco dated 10 May 1993 for the refurbishment of the GPS and includes any replacement deed contemplated by it;

Examples of Refurbishment and Testing Deed in a sentence

  • The standards, parameters, conditions and requirements applicable under Section 1 of this Part shall be modified in respect of each boiler from SECOND SCHEDULE (continued) the day after the date on which the Acceptance Test Certificate is given in respect of that boiler in accordance with the terms of the Refurbishment and Testing Deed or 31 December 1997 (whichever is the earlier) (the “Refurbishment Date”) in the following respects (and only those respects).

Related to Refurbishment and Testing Deed

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • refurbishment means repairing of used electrical and electronic equipment as listed in Schedule I for extending its working life for its originally intended use and selling the same in the market or returning to owner;

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Cannabis testing facility means an entity registered by

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Construction Work means any work in connection with⎯

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • construction site means a workplace where construction work is being performed;

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Decommissioning means the measures taken at the end of a facility's operating life to assure the continued protection of the public from any residual radioactivity or other potential hazards present at a facility.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.