Examples of Reserve pit in a sentence
The economic assumptions used in the LG shell are almost identical to the economic assumptions used for the Mineral Reserve pit optimization with the notable exception of metal prices, which are higher for the Mineral Resource estimate, and pit slopes which are constant at 40 degrees.
Approximately forty percent (40%) of the gold metal content defined as underground Mineral Reserves is derived from material located between the Mineral Reserve pit shell and the Mineral Resource pit shell; the remaining sixty percent (60%) of the metal content defined as underground Mineral Reserves is derived from material located below the Mineral Resource pit shell.
Approximately forty-four percent (44%) of the gold metal content defined as underground Mineral Reserves is derived from material located between the Mineral Reserve pit shell and the Mineral Resource pit shell; the remaining fifty-six percent (56%) of Mineral Reserves is derived from material located below the Mineral Resource pit shell.
CEQA: Determination of Consistency with the Envision San José 2040 General Plan Final Program Environmental Impact Report (Resolution No. 76041) and Supplemental Environmental Impact Report to the Envision San José General Plan Final Program Environmental Impact Report (Resolution No. 77617), and Addendathereto.
In other cases, special laboratory techniques would be required to produce the organism (for example, tissue culture).
The parameters used for Mineral Reserve pit optimization were included in Table 17-5 and 17-6.
The location of the processing facilities, Çöpler mine, Ardich Reserve pit, TSF, and the haul road from Ardich to Çöpler is shown in the site plan in Figure 15.1.Figure 15.1 Çöpler Project PlanAnagold, 2022The current leach pad consists of four phases designed to accommodate approximately 58 Mt of oxide ore heap with a nominal maximum heap height of 100 m above the pad liner.
Mineral Resources exclusive of Mineral Reserves that are amenable to open pit mining methods at Salobo represent sulphide mineralization that is adjacent to the current Mineral Reserve pit plus Inferred Mineral Resources within the Mineral Reserve pit.
These parameters, with the exception of the gold price, are the same parameters as those used to define the Mineral Reserve pit.
For all tables, scandium grades are rounded to suitable level of precision commensurate with the assay reporting precision of 10 ppm Sc for XRF.The Ore Reserve pit design is shown in Figure 1 and Figure 2 along with the JORC Mineral Resource category limits.