Examples of Riser Manager in a sentence
Vendor shall not enter electrical, telephone/data or riser closets without written approval from Landlord and if applicable Landlord’s Riser Manager.
The cost of this service will be supplied to the Tenant by the Riser Manager upon request.
OLMS Enforcement Statistics – Union DemocracyFY 2010 The following are highlights of some of the most significant OLMS election and trusteeship cases during FY 2010.
Subsequent to the initial installation, no coring or additional conduit or any other wiring infrastructure is to be installed in the Tenant space without the written approval of QuadReal Property Group or the Riser Manager.
Direction will be given by Riser Manager as to which sleeves or slots may be used.• Permission must be obtained from the Landlord’s Riser Manager for additional riser holes or sleeves.
Permission will be required from the Riser Manager for locating patch Core drilled holes and will also require prior slab x-rays, and approval of the Landlord’s Structural Engineer.• All cables that are obsolete or abandoned are to be completely removed back to the source.• All pull strings/cords must be replaced if distribution conduits/pathways are used by the contractors.
A Certificate of Compliance must be submitted to the Riser Manager when work is complete.• Provide “as-built” drawings detailing work completed and locations and turn over to the Riser Manager on the completion of the work.• The TSP is responsible for In Building Wire supplied to the tenant.ii) GENERAL GUIDELINES FOR TERMINATION IN MAIN EQUIPMENT ROOM • Cables must be terminated at assigned blocks designated by the Riser Manager.
All components must be properly labeled.• Permission must be obtained from the Riser Manager to use existing sleeves or slots.
All existing fire stopping that has been cut or removed must be repaired in an approved manner.• Only cables specifically noted by the Riser Manager may be run in free air (i.e. not in conduit) in riser rooms.• Cables may not be supported from other existing cables, conduits, straps, plumbing, sprinkler pipes or other building systems components.
Contractor shall not enter electrical, telephone/data or riser closets without written approval from Landlord and if applicable Landlord’s Riser Manager.