Examples of Riverside Facility in a sentence
Such agreements between FreshRealm and Calavo for the Riverside Facility and/or Jacksonville Facility are individually or collectively referred to herein as the Cold Storage Agreement(s), as applicable.
While FreshRealm is using either the Riverside Facility or the Jacksonville Facility, Receiving Party may receive Confidential Information relating to the Disclosing Party.
Delivery and loading of coal at Riverside Facility can be performed at two (2) separate times; however, the coal that is delivered shall be confined within the perimeter of the designated area and all coal that is delivered shall be loaded and leveled into the agency's stockpile within one (1) calendar week of delivery.
What is the most probable diagnosis for this child?Test:Result:Reference range:CRP36 mg/L<5 mg/LHb8.3 g/dL10.5-13.1 g/dLThrombocytes126 x 109/L228-435 x 109/LLeukocytes15.9 x 109/L3.7-14.7 x 10^9/L A Infectious mononucleosisB Hemolytic uremic syndromeC X Acute leukaemiaThe patient has been ill over a longer period and has both anaemia and thrombocytopaenia, mild leukocytosis, hepatosplenomegaly and infection.
The Contractor may leave their loader on site at Riverside Facility; however, Department of Corrections procedures pertaining to vehicles must be adhered to.
Calavo currently leases to FreshRealm refrigerated real property warehouse space on a month to month basis located at 1730 Eastridge Avenue, Riverside, CA 92507 (the "Riverside Facility") and at 4627 J P Hall Boulevard, Suite 204, Green 'Cove Springs, FL 32043 (the "Jacksonville Facility").
The Contractor is responsible for unloading, piling, and compacting of the coal at Riverside Facility.
Six individual piles of soil (also referred to as “trammel piles”) were assessed in April 2013 under the December 2012 Trammel Pile Material PCB Sampling Plan Riverside Facility Poor Charlie & Company, Inc.
In addition to the 20 Million, the Ministry of Education applied and along with the Ministry of Youth & Sports jointly negotiated for a Euro 12 (Twelve) Million Grant for the Youth Rising Project.
The United States Environmental Protection Agency (EPA) has prepared this Technical Support Document (TSD) to solicit public comment on its proposed remedy for the Poor Charlie Riverside Facility located in Glasgow, West Virginia (hereinafter referred to as the Facility or Site).