Soft excavation definition

Soft excavation means a method and technique designed to prevent contact damage to underground facilities, including, but not limited to, hand-digging, cautious digging with nonmechanical tools, vacuum excavation methods, or use of pneumatic hand tools.
Soft excavation means a method and technique designed to prevent contact damage to underground facilities, including, but not limited to,
Soft excavation means a method and technique designed to prevent contact damage to underground facilities,

Examples of Soft excavation in a sentence

  • Soft excavation shall include all boulders with a volume of less than 0.125 m3 and a maximum dimension of 500 mm, which can still be removed by hand methods.

  • Soft excavation Class 1 shall be excavation, including the excavation of boulders not exceeding 0.04m3, in material that can be excavated and removed from the excavation by an average able bodied labourer or group of such labourers, at a rate of production of not less than 2.0m3 per 9.25 hour working day, using only picks, ‘gwalas’, shovels and similar tools.

  • Soft excavation shall be that excavation in material, which in the opinion of the Engineer, can be efficiently excavated and loaded by means of hand-held tools excluding pneumatic or hydraulic breaking tools.

  • Soft excavation conditions are also expected for earthworks.Areas which display some sensitivity to the development include the area of alluvium in the northeastern parts of the corridor and areas of steep ground and major changes in elevation.

  • Soft excavation conditions in the alluvium are also expected for trenching and earthworks.Areas which display sensitivity to the development include some areas of alluvium and areas of steep ground and major changes in elevation.

  • Classification The excavation of earthworks material shall be classified as follows for the purpose of measurement and payment: Soft excavation - shall be excavation in any material which does not comply with the definition for `Hard Excavation' given below.

  • Soft excavation and intermediate excavations, as defined in clause 3.1.2.B of SABS 1200 D, have not been identified by way of separate measurement.

  • Soft excavation Class 2 shall be excavation, including the excavation of boulders not exceeding 0.04 m3, (excluding soft excavation Class 1) in material that can be excavated and removed from the excavation by an average able bodied labourer or group of such labourers, at a rate of not less than 2.0 m3 and not more than 2.0 m3 per 9.25 hour working day per labourer, using only picks, "gwalas", shovels and similar hand tools.

  • Soft excavation shall be all excavated material other than hard excavation.

  • Soft excavation shall be material not falling into the category of hard rock excavation.” PSD 5 CONSTRUCTION PSD 5.2 Methods and Procedures PSD 5.2.1 Site PreparationPSD 5.2.1.2 Conservation of Topsoil Add the following to Clause 5.2.1.2: Topsoil shall not be stockpiled higher than 2,0m.

Related to Soft excavation

  • Excavation means the mechanical removal of earth material.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Excavate or "excavation" means ditching, dredging, or mechanized removal of earth, soil or rock.

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • Excavation zone means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floor of the pit and trenches into which the UST system is placed at the time of installation.

  • The Works/Project means the works to be executed or done under this contract.

  • Excavator means any person performing excavation or blasting.

  • explosive actuated fastening device means a tool that is activated by an explosive charge and that is used for driving bolts, nails and similar objects for the purpose of providing fixing;

  • Engine degreaser means a cleaning product designed to remove grease, grime, oil and other contaminants from the external surfaces of engines and other mechanical parts.

  • Tight-fitting facepiece means a respiratory inlet covering that forms a complete seal with the face.

  • Fluoroscopic imaging assembly means a subsystem in which X-ray photons produce a visual image. It includes the image receptor(s) such as the image intensifier and spot-film device, electrical interlocks, if any, and structural material providing linkage between the image receptor and diagnostic source assembly.

  • Decontamination means a procedure whereby health measures are taken to eliminate an infectious or toxic agent or matter on a human or animal body surface, in or on a product prepared for consumption or on other inanimate objects, including conveyances, that may constitute a public health risk;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • drainage work means any watercourse and includes any land which is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage or flood defence;

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Grading means the movement or redistribution of the soil, sand, rock, gravel, sediment, or other material on a site in a manner that alters the natural contour of the land.

  • Slug loading means any pollutant, including oxygen demanding pollutants, released in a discharge at a flow rate and/or pollutant concentration as to cause interference in the POTW.

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Area of shallow flooding means a designated AO or AH Zone on a community's Flood Insurance Rate Map (FIRM) with one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate; and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.

  • Roof means a non-porous cover for a structure such as (by way of example and not limitation) Lexan barriers or shingles but not a shade trellis, ivy or other open or porous material that may also be used as a cover.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Underground area means an underground room, such as a basement, cellar, shaft or vault, providing enough space for physical inspection of the exterior of the tank situated on or above the surface of the floor.

  • Fabrication means making up data or results and recording or reporting them.

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as: