State Plan of Flood Control definition

State Plan of Flood Control means the state and federal flood control works, lands, programs, plans, policies, conditions, and mode of maintenance and operations of the Sacramento River Flood Control Project described in Section 8350, and of flood control projects in the Sacramento River and San Joaquin River watersheds authorized pursuant to Article 2 (commencing with Section 12648) of Chapter 2 of Part 6 of Division 6 for which the board or the department has provided the assurances of nonfederal cooperation to the United States, and those facilities identified in Section 8361.
State Plan of Flood Control means the state and federal flood control works, lands, programs, plans, conditions, and mode of maintenance and operations of the Sacramento River Flood Control Project described in Section 8350 of the Water Code, and of flood control projects in the Sacramento River and San Joaquin River watersheds
State Plan of Flood Control means the state and federal flood control works, lands, programs, plans, conditions, and mode of maintenance and operations described in Cal. Pub. Res. Code § 5096.805(j).

Examples of State Plan of Flood Control in a sentence

  • As part of its 200-Year Goldfields Levee Project (Project), the Three Rivers Levee Improvement Authority (TRLIA) is constructing a new levee, approximately 2.6 miles long, to replace the deteriorating conditions of the high ground at the termination of the State Plan of Flood Control (SPFC) near the Yuba Goldfields.

  • As part of its 200-Year Goldfields Levee Project (Project), the Three Rivers Levee Improvement Authority (TRLIA) is constructing a new levee, approximately 2.6 miles long, to replace the deteriorating conditions of the high ground at the termination of the State Plan of Flood Control (SPFC) facility at the Yuba Goldfields.

  • As part of its 200-Year Goldfields Levee Project (Project), the Three Rivers Levee Improvement Authority (TRLIA) constructed a new levee, approximately 2.6 miles long, to replace the deteriorating conditions of the high ground at the termination of the State Plan of Flood Control (SPFC) near the Yuba Goldfields.

  • As part of its 200-Year Goldfields Levee Project (Project), the Three Rivers Levee Improvement Authority (TRLIA) is constructing a new levee, approximately 3.6 miles long, to replace the deteriorating conditions of the high ground at the termination of the State Plan of Flood Control (SPFC) facility at the Yuba Goldfields.

  • XXXXX was verbally notified by DWR that DWR legal is in the process of drafting an internal memo and subsequent letter to TRLIA that documents that XXXXX has demonstrated how the proposed project can meet Prop 1E funding requirements, and a clear path to the State Plan of Flood Control has been identified.

  • The USACE has a major responsibility for overseeing reservoir releases and supporting the State’s effort in maintaining the levees and structures associated with the State Plan of Flood Control.

  • State Plan of Flood Control: The Goldfields 200-Year Levee Project (Project) must be added to the State Plan of Flood Control (SPFC) due to the requirement of the Proposition 1E General Obligation Bond (Pub.


More Definitions of State Plan of Flood Control

State Plan of Flood Control. The state and federal flood control works, lands, programs, plans, conditions, and mode of maintenance and operations described in Cal. Pub. Res. Code § 5096.805(j).
State Plan of Flood Control means the state

Related to State Plan of Flood Control

  • Regulated motor vehicle surface means any of the following, alone or in combination:

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Motor vehicle surface means any pervious or impervious surface that is intended to be used by “motor vehicles” and/or aircraft, and is directly exposed to precipitation including, but not limited to, driveways, parking areas, parking garages, roads, racetracks, and runways.

  • Public Areas shall include, but not be limited to, public or common rooms, waiting rooms, lobbies and public meeting rooms, or other similar areas which are open to the general public.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Adopt a comprehensive land use plan means to enact a new

  • Underground source of drinking water means an aquifer or its portion:

  • Cathodic protection means a technique designed to prevent the corrosion of a metal surface by making that surface the cathode of an electrochemical cell. For example, protection can be accomplished with an impressed current system or a galvanic anode system.

  • Public area means any portion of a state or municipal building that is open to and accessible by the public or which is otherwise designated as a public area by the governing body or the chief administrative officer, if no governing body exists, of such building.

  • In-situ conservation means the conservation of ecosystems and natural habitats and the maintenance and recovery of viable populations of species in their natural surroundings and, in the case of domesticated or cultivated species, in the surroundings where they have developed their distinctive properties.

  • Urban area means Maricopa and Pima counties, excluding Tribal Lands.

  • public service infrastructure means publicly controlled infrastructure of the following kinds:

  • QUALIFIED MUNICIPAL CORPORATION means a municipal corporation that, by resolution or ordinance adopted on or before December 31, 2011, adopted Ohio adjusted gross income, as defined by section 5747.01 of the Ohio Revised Code, as the income subject to tax for the purposes of imposing a municipal income tax.

  • Cathodic protection tester means a person who can demonstrate an understanding of the principles and measurements of all common types of cathodic protection systems as applied to buried or submerged metal piping and tank systems. At a minimum, such persons must have education and experience in soil resistivity, stray current, structure-to-soil potential, and component electrical isolation measurements of buried metal piping and tank systems.

  • Urban growth areas means those areas designated

  • Area of special flood hazard means the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year.

  • Health hazard means any condition, device or practice in a water system or its operation resulting from a real or potential danger to the health and well-being of consumers. The word "severe" as used to qualify "health hazard" means a hazard to the health of the user that could be expected to result in death or significant reduction in the quality of life.