Stormwater project means a project of construction, alteration, repair, replacement, or improvement other than ordinary maintenance, executed at the cost of the state or of any municipality, or which is by law a lien or charge on any property, carried out on a municipal separate storm sewer system, and any connections to the system, that is regulated under a state-issued national pollutant discharge elimination system general municipal stormwater permit for the purpose of improving control of stormwater runoff quantity and quality from developed land, safely conveying stormwater runoff, or reducing erosion or other water quality impacts caused by municipal separate storm sewer system discharges.
Stormwater project means a project of construction, alteration, repair, replacement, or improvement other than ordinary maintenance, executed at the cost of the state or of any municipality, or which is by law a lien or charge on any property, carried out on a municipal separate storm sewer system, and any connections to the
Stormwater project means a project of construction, alteration, repair, replacement, or improvement other than

Examples of Stormwater project in a sentence

  • In the Storm-water project, for the three contracts above, response was very low, with the services contract receiving only one tender (which was accepted) and the works contracts receiving two tenders each.

  • For the Storm-water project, Buffalo City Municipality’s preferential procurement policy was used (as outlined in Box 2).

  • The City of Woodlake has received 2018 CDBG funding to construct Phase II of the Woodlake Stormwater project, which will build a stormwater line from the pump to the future stormwater basin on Ropes Ave.

  • The City desires the Contractor to provide all goods, services, materials and equipment as identified herein related to the Emergency Utility Repairs for Water, Wastewater and Stormwater project generally described as: (the “Project”).

  • Stormwater project close-out consists of as-built review and a project close-out inspection.

  • If the City does not purchase the property, it may be sold to a third party and developed, which would hinder the City’s ability to construct this important Stormwater project.

  • Consider Engineering Services Agreement for the Carol Beach Estates Unit 2 Stormwater project.

  • For $114,727.23 (Pay Request No. 6) to Blankenberger Brothers for the Jeanette-Cass Addition Stormwater project, September 24 – October 21, 2011, recommended by David Schminke (Wessler)/ Michael Labitzke.

  • Consider authorization for Friends of the Winooski River to submit a grant application for the DPW Yard Stormwater project.

  • The first item was resolution 17-2013, which officially eliminates the Wood Township Stormwater project from the CDBG budget.

Related to Stormwater project

  • Stormwater system means constructed and natural features which function together as a system to collect, convey, channel, hold, inhibit, retain, detain, infiltrate, divert, treat, or filter stormwater. “Stormwater system” includes both public and privately owned features.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Stormwater means water resulting from precipitation (including rain and snow) that runs off the land’s surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.

  • Wastewater System means a system of wastewater collection, treatment,

  • Water System means the plants, structures and other

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project site, where applicable, means the place indicated in bidding documents.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Wastewater facilities means the structures, equipment, and processes required to collect, carry away, and treat domestic and industrial wastes and dispose of the effluent.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Drainage system means one or more artificial ditches, tile drains or similar devices which collect surface runoff or groundwater and convey it to a point of discharge.

  • Wastewater means the spent water of a community. From the standpoint of source, it may be a combination of the liquid and water-carried wastes from residences, commercial buildings, industrial plants, and institutions, together with any groundwater, surface water, and storm water that may be present.

  • Public works project means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

  • Sewer System means pipelines or conduits, pumping stations, force mains, vehicles, vessels, conveyances, injection wells, and all other constructions, devices, and appliances appurtenant thereto used for conducting sewage or industrial waste or other wastes to a point of ultimate disposal or disposal to any water of the state. To the extent that they are not subject to section 402 of the federal Water Pollution Control Act, ditches, pipes, and drains that serve only to collect, channel, direct, and convey nonpoint runoff from precipitation are not considered as sewer systems for the purposes of this part of this division.