Examples of Stream day in a sentence
Stream day capacity is typically about 6% higher than calendar day capacity.
Eu,r Stream day capacity added during this simulated period for processing unit type (u) in refinery region (r).
Stream day capacities.Figure 1.1 shows how since the mid 90-ies, unused refining capacity in California is less than 5%, indicating that all remaining refineries in California have essentially been running at the maximum practically feasible operating rate given the average age and the mechanical complexity of the installations.
Crude distillation capacity [A]Thousand b/stream day [B] 2021 2020 2019Europe1,0231,0591,057Asia307573767Africa909090Americas7291,0281,171Total2,1492,7503,085[A] Average operating capacity for the year, excluding mothballed capacity.[B] Stream day capacity is the maximum capacity with no allowance for downtime.
Stream day capacity is the maximum number of barrels of input that a distillation facility can process within a 24-hour period when running at full capacity under optimal crude and product slate conditions with no allowance for downtime.
Stream day capacity” is a measure of the refinery’s designed processing capacity.
E @ BTLINV = ∑[E(r)BTLINV + L(r)BTLBLD + A ⋅ K (r)BTLCAP]r A Coefficient= 1/capacity utilization to define nameplate capacity.E@BTLINV Cumulative builds of U.S. BTL capacity (subject to an upper bound based on the Mansfield-Blackman penetration algorithm, see Appendix F).E(r)BTLINV Stream day capacity added during this simulated period in region (r).K(r)BTLCAP Base processing capacity at region (r).
Stream day rate represents the physical capacity of the facility at a particular ambient condition and does not account for planned or unplanned downtime (assume 100-percent uptime).
Stream day rate represents the physical capacity of the facility at a particular ambient condition and does not account for planned or unplanned downtime (assume 100-percent uptime).peak capacity of 4.0 BSCF/D16 and a MAOP of 720 psig.
Limit planned builds of cellulose ethanol plant to an established level: Σd Eu,d + Σd Ku,d ≤ rhs for u=CLZ only where: Eu,r Stream day capacity added during this simulated period for processing unit type (u=CLZ only) in Census Division (d).