Time Since Overhaul definition

Time Since Overhaul means the FH elapsed since the last overhaul;

Examples of Time Since Overhaul in a sentence

  • In the event a like-value engine is not available and an alternate engine is offered for exchange, the engine exchange charge will be the Maximum Event Cost plus or minus the value difference when compared with your Engine, based on Time Since New or Time Since Overhaul, and Low Cycle (“LCF”) parts.

  • AIRFRAME STATUS Time as of Maintenance Program Total Hours Total Cycles Time Since Overhaul Time Since Last C Ck "D" Check - Time to Next Overhaul "C" Check - ENGINE STATUS Model # Serial # REMAINING Limiter ------- -------- --------- ------- 1.

  • In no event shall any exchange propeller be accepted with fewer upgrades or Service Bulletin compliances or with less Time Since Overhaul (TSO) than the replaced propeller.

  • AIRFRAME STATUS Time as of Maintenance Program Total Hours Total Cycles Time Since Overhaul Time Since Last C Ck "D" Check - Time to Next Overhaul "C" Check - ENGINE STATUS Model # Serial # REMAINING Limiter ------- -------- --------- ------- #1.

Related to Time Since Overhaul

  • Overhaul means the restoration of an aircraft or aeronautical product using methods, techniques, and practices acceptable to the Authority, including disassembly, cleaning, and inspection as permitted, repair as necessary, and reassembly; and tested in accordance with approved standards and technical data, or in accordance with current standards and technical data acceptable to the Authority, which have been developed and documented by the State of Design, holder of the type certificate, supplemental type certificate, or a material, part, process, or appliance approval under Parts Manufacturing Authorisation (PMA) or Technical Standard Order (TSO);

  • Immature marijuana plant means a marijuana plant that is not flowering.

  • Day-ahead Scheduling Reserves Resources means synchronized and non-synchronized generation resources and Demand Resources electrically located within the PJM Region that are capable of providing Day-ahead Scheduling Reserves.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Day-ahead Scheduling Reserves Requirement means the sum of Base Day-ahead Scheduling Reserves Requirement and Additional Day-ahead Scheduling Reserves Requirement.