Corrective Measure means a measure as defined in Article 3, point 16, of Regulation (EU) 2019/1020;
Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.
Waste prevention means source reduction and reuse, but not recycling.
Preventive measures means any reasonable measures taken by any person after an incident has occurred to prevent or minimize pollution damage.
Treatability study means a study in which a hazardous waste is subjected to a treatment process to determine: (1) Whether the waste is amenable to the treatment process, (2) what pretreatment (if any) is required, (3) the optimal process conditions needed to achieve the desired treatment, (4) the efficiency of a treatment process for a specific waste or wastes, or (5) the characteristics and volumes of residuals from a particular treatment process. Also included in this definition for the purpose of the § 261.4 (e) and (f) exemptions are liner compatibility, corrosion, and other material compatibility studies and toxicological and health effects studies. A “treatability study” is not a means to commercially treat or dispose of hazardous waste.
Backflow Prevention Assembly means any mechanical assembly installed at a water service line or at a plumbing fixture to prevent a backflow contamination event, provided that the mechanical assembly is appropriate for the identified contaminant at the cross connection and is an in-line field-testable assembly.
Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).
Preventive Maintenance means that maintenance, performed on a scheduled basis by the Contractor, which is designed to keep the Equipment in proper operating condition.
Combatant Commander means the commander of a unified or specified combatant command established in accordance with 10 U.S.C. 161.
Backflow prevention device means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system.
Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.
Alcohol Screening Device (ASD) means a breath or saliva device, other than an Evidential Breath Testing Device (EBT), that is approved by the National Highway Traffic Safety Administration and placed on its Conforming Products List for such devices.
Subproject means a specific project to be carried out by an existing BE utilizing the proceeds of a Sub-loan or Investment, as hereinafter defined, fulfilling the conditions set forth in Part A of Schedule 4 to this Agreement;
Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;
Categorical pretreatment standard or "categorical standard" means any regulation containing pollutant discharge limits promulgated by the environmental protection agency in accordance with sections 307(b) and (c) of the Act (33 U.S.C. section 1317) that apply to a specific category of users and that appear in 40 CFR chapter I, subchapter N, parts 405 through 471.
Public work means public work as defined in section 2 of P.L.1963, c.150 (C. 34:11-56.26) and which is subject to the provisions of P.L.1963, c.150 (C. 34:11-56.25 et seq.). Public work shall not include the provision of goods or products.
Natural Resources Assistance Council means the natural resources assistance council created pursuant to Ohio Revised Code Section 164.21 as well as its members and officers.
Radiation therapy simulation system means a radiographic or fluoroscopic x-ray system intended for localizing the volume to be exposed during radiation therapy and confirming the position and size of the therapeutic irradiation field.
Quality Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.3 of Exhibit B to the ITP.
Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.
Corrective Maintenance means the maintenance which is required when an item has failed or worn out, to bring it back to working order, which may also include those services necessary to partially restore, renew or strengthen an existing Department facility or system, following damage caused by use or normal wear and tear.
Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Progressive discipline means a process of applying and documenting disciplinary actions progressing from less to more serious depending on the employee’s history and the nature of the offense.
Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.
Start means the day falling the Relevant Number of Index Days prior to the first day of the relevant Interest Period.
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.