Total Steam definition

Total Steam means the total of all steam that is supplied to a Flare and includes, but is not limited to, lower steam, center steam, and upper steam.
Total Steam or “S” shall mean the total of all steam that intentionally is introduced into a steam-assisted flare to assist in combustion.

Examples of Total Steam in a sentence

  • Reaching of 95% healthiness level of the Total Steam traps (including BPCL verification & acceptance) in the Refinery will mark the end of this Stage 2.

  • Exception to Part of the Work Practice Standards in Subparagraphs 43.a and 43.b. MPC manually may override the operation of the Automatic Control System required in Subparagraph 43.a (for control of Supplemental Gas flow rate) and 43.b (for control of Total Steam Volumetric Flow Rate) if the exception in Paragraph 50 applies, and/or during Startup, Shutdown, or Malfunction of a process unit that feeds the Covered Flare, and/or to achieve the following:a.

  • Final 50% shall be paid once 95% healthiness level of the Total Steam traps is reached and on BPCL verification & acceptance by BPCL-Engineer- In- Charge.In case of Non-Indian bidders, the payment shall be through wire transfer.Payment for A (3)- Payment will be made on quarterly basis within 30 days of submission of the certified invoice.

  • Final 50% shall be paid once 95% healthiness level of the Total Steam traps is reached and on BPCL verification & acceptance by BPCL-Engineer- In- Charge.However, vendor to note that retention money as applicable in all cases will be retained by BPCL unless PBG is provided.

  • The 15-minute Block Average cumulative flows for Vent Gas and, if applicable, Total Steam, Perimeter Assist Air, and Premix Assist Air specified to be monitored under Paragraph 117, along with the date and time interval for the 15-minute Block Average Period.

  • Such training shall include describing and identifying the existing monitoring and instrumentation systems, how to manually adjust the Total Steam Mass Flow Rate so as to optimize Combustion Efficiency and minimize oversteaming, and how to target the S/VG ratio at the lowest possible value to just avoid Smoke Emissions.

  • For Covered Flares that receive Assist Steam, the Minimum Total Steam Rate and the maximum Total Steam rate.

  • At any time after the Date of Lodging, for any Covered Flare, MPC may submit a request to EPA for an adjustment of the Total Steam Mass Flow Rate and Total Steam Volumetric Flow Rate at that Covered Flare based on the Steam Contribution Factor at that Covered Flare.

  • Figure 4 — Total Steam Consumption in China from 2013 to 2019 Gigajoule650 600 550 500 450 400 350 3002013 2014 2015 2016 2017 2018 2019 Source: 中國城市供熱行業市場前瞻與投資戰略規劃分析報告 During the outbreak of COVID-19 in China, the needs for heating power supply has increased.

  • The permittee may submit a request to EPA for an adjustment of the Total Steam Mass Flow Rate and Total Steam Volumetric Flow Rate at P003, based on the Steam Contribution Factor at P003.

Related to Total Steam

  • Total Evaluated CRIS MW means the Additional CRIS MW requested plus either (i) if the Installed Capacity Supplier previously received an exemption under Sections 23.4.5.7.2(b), 23.4.5.7.6(b), 23.4.5.7.7 or 23.4.5.7.8, all prior Additional CRIS MW since the facility was last exempted under Sections 23.4.5.7.2(b), 23.4.5.7.6(b), or 23.4.5.7.8, or (ii) for all other Installed Capacity Suppliers, all MW of Capacity for which an Examined Facility obtained CRIS pursuant to the provisions in ISO OATT Sections 25, 30, or 32 (OATT Attachments S, X, or Z). For purposes of Section 23.4.5 of this Attachment H, “UCAP Offer Reference Level” shall mean a dollar value equal to the projected clearing price for each ICAP Spot Market Auction determined by the ISO on the basis of the applicable ICAP Demand Curve and the total quantity of Unforced Capacity from all Installed Capacity Suppliers in a Mitigated Capacity Zone for the period covered by the applicable ICAP Spot Market Auction. For purposes of Section 23.4.5 of this Attachment H, “Unit Net CONE” shall mean localized levelized embedded costs of a specified Installed Capacity Supplier, including interconnection costs, and for an Installed Capacity Supplier located outside a Mitigated Capacity Zone including embedded costs of transmission service, in either case net of likely projected annual Energy and Ancillary Services revenues, and revenues associated with other energy products (such as energy services and renewable energy credits, as determined by the ISO, translated into a seasonally adjusted monthly UCAP value using an appropriate class outage rate. The Unit Net CONE of an Installed Capacity Supplier that has functions beyond the generation or transmission of power shall include only the embedded costs allocated to the production and transmission of power, and shall not net the revenues from functions other than the generation or transmission of power.

  • Cubic foot of gas means the amount of gas required to fill a cubic foot of space when the gas is at an absolute pressure of fourteen and seventy-three hundredths (14.73) pounds per square inch at a temperature of sixty (60) degrees Fahrenheit.

  • Process weight means the total weight of all materials introduced into any source operation. Solid fuels charged will be considered as part of the process weight, but liquid and gaseous fuels and combustion air will not.

  • Gross Standard Volume as herein used means volume corrected to a temperature of sixty degrees (60°) Fahrenheit, in accordance with the latest API/ASTM measurement standards, and at equilibrium vapor pressure.

  • kWh means kilowatt-hour.

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Sound pressure level means twenty times the logarithm to the base 10 of the ratio of the effective pressure (µPa) of a sound to the reference pressure of 20 µPa;

  • Total maximum daily load or "TMDL" means the sum of the individual wasteload allocations for point sources, load allocations (LAs) for nonpoint sources, natural background loading and a margin of safety. TMDLs can be expressed in terms of either mass per time, toxicity, or other appropriate measure. The TMDL process provides for point versus nonpoint source trade-offs.

  • GDP price deflator means the average of the four implicit price

  • Licensed Level means a) when referenced in the context of a Named User, the quantity of Metric for which each individual Named User category and type is licensed -and- b) when referenced in the context of a Package, the quantity of Metric for which each individual Package is licensed; and

  • Maximum Daily Quantity means the daily volume of Gas or Liquids, expressed in 103m3, identified in a Shipper's Interruptible Transportation Service Agreement that Transporter agrees to receive from Shipper under Toll Schedule Interruptible Full Path Service, Toll Schedule Interruptible Receipt Service or Toll Schedule Interruptible Delivery Service, as applicable.

  • Working level month (WLM) means an exposure to 1 working level for 170 hours (2,000 working hours per year divided by 12 months per year is approximately equal to 170 hours per month).

  • average consumption means the average consumption of a customer of a municipal service during a specific period, and is calculated by dividing the total measured consumption of that municipal service by that customer over the preceding three months by three;

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Small quantity generator means a generator who generates less than 1000 kg of hazardous waste in a calendar month.

  • Exceedance means a condition that is detected by monitoring that provides data in terms of an emission limitation or standard and that indicates that emissions (or opacity) are greater than the applicable emission limitation or standard (or less than the applicable standard in the case of a percent reduction requirement) consistent with any averaging period specified for averaging the results of the monitoring.

  • Digital Signal Level 0 (DS-0 means the lowest-level signal in the time division multiplex digital hierarchy, and represents a voice-grade channel operating at either the 56 Kbps or 64 Kbps transmission bit rates. There are twenty-four (24) DS-0 channels in a DS-1.