Examples of UL 1741 CRD in a sentence
When applicable, Customer-Generator confirms that the Renewable Electrical Generation Facility including Energy Storage over 10 kW that has received UL 1741 CRD for Power Control Systems (PCS) certification will comply with either No Grid Charge or No Storage Export as defined in Schedule NEM2.
The Joint NGOs recommend eliminating the separate reference to the UL 1741 CRD, as indicated in the attached redline rule at section 466.75(c)(6)(A).
By signing below, customer confirms that Energy Storage over 10 kW has received UL 1741 CRD for Power Control Systems (PCS) certification that will comply with either No Grid Charge or No Storage Export as defined in Schedule NEM2.
A motion was made, seconded and voted to approve the program expansion of Grafton Schools – Richmond.
For example, the definition of “Power control system” (“PCS”) is based on the definition in UL 1741 CRD for PCS.
In subsection 466.75 (c)(6)(E), “open loop” is not industry standard nomenclature, and is very unclear, according to ComEd. In addition, the following statement does not cover the specific requirement of UL 1741 CRD, and is an unnecessary and confusing addition to this section: “COMMISSION NOTE: NRTL testing to the UL power control system certification requirements decision shall be accepted until similar test procedures for power control systems are included in a standard.” ComEd Init.
The use of cloud computing in SMEs. Procedia - Procedia Computer Science 83: 1207– 12.4. Attaran, M.
The following are a few of the more common control modes as defined in the UL 1741 CRD standard.
While not yet part of the UL 1741 standard, the CRD document must be utilized in order to qualify for UL product certification programs.Beyond serving as the test protocol for demonstrating a system’s capability to support import and export limits under a variety of conditions,110 the UL 1741 CRD for PCS also recognizes the possibility of inadvertent export or import, which is power flow beyond the specified limit that occurs for short periods of time.
A task group of Underwriters Laboratory (UL) has created a Certification Requirements Decision (CRD) to verify this functionality, the UL 1741 CRD for Power Control Systems.