Unbundled Loop shall have the meaning set forth in Section 9.2.1.
Standard Cost means any cost computed with the use of preestablished measures.
Stranded cost means the amount by which the net cost of an
Vapor collection system means a vapor transport system which used direct displacement by the gasoline being transferred to force vapors from the vessel being loaded into either a vessel being unloaded or a vapor control system or vapor holding tank.
Storm water or wastewater collection system means piping, pumps, conduits, and any other equipment necessary to collect and transport the flow of surface water run-off resulting from precipitation, or domestic, commercial, or industrial wastewater to and from retention areas or any areas where treatment is designated to occur. The collection of storm water and wastewater does not include treatment except where incidental to conveyance.
Fully Loaded Cost means the direct cost of good or service plus all applicable indirect charges and overheads.
Recycled content means the percentage of a product composed of recovered material, or post- consumer recovered material, or both.
Wastewater collection system means the sewer and pumping system used for the collection and conveyance of domestic, commercial and industrial wastewater; and
Increased Cost has the meaning specified in Section 3.01.
Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.
book cost means the total amount paid to purchase a security, including any transaction charges related to the purchase, adjusted for reinvested distributions, returns of capital and corporate reorganizations;
The Contract Price/ Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.
Basket Component means each of the SPDR S&P 500 ETF Trust, iShares Russell 2000 Index Fund, iShares MSCI EAFE Index Fund, and iShares MSCI Emerging Markets Index Fund.
Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;
Electrical Losses means all applicable losses, including the following: (a) any transmission or transformation losses between the CAISO revenue meter(s) and the Delivery Point; and (b) the Distribution Loss Factor, if applicable.
embedded generator means a generator who is not a market participant and whose generation facility is connected to a distribution system of a distributor, but does not include a generator who consumes more electricity than it generates;
Equipment Cost means, for each Unit, the purchase price therefor -------------- paid by the Owner Trustee to the Lessee pursuant to Section 2 of the Participation Agreement and as set forth in Schedule 1 to the Participation Agreement with respect to such Unit. Notwithstanding anything to the contrary contained in the Operative Agreements, the Equipment Cost for any Replacement Unit shall be deemed to be the Equipment Cost or deemed Equipment Cost of the Unit replaced by such Replacement Unit.
Contract Cost means the Contract Sum plus Price Variation. This cost shall be included in the letter of acceptance.
No-load Cost means the hourly cost required to create the starting point of a monotonically increasing incremental offer curve for a generating unit.
Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.
Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.
Fixed Costs means costs which do not vary with consumption or volume produced;
Book-Based System means a system for the central handling of securities or equivalent book-based entries under which all securities of a class or series deposited within the system are treated as fungible and may be transferred or pledged by bookkeeping entry without physical delivery;
Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.
Indirect cost means any cost not directly identified with a single final cost objective, but identified with two or more final cost objectives or with at least one intermediate cost objective.
Trip Cost means the dollar amount of Trip payments or deposits paid by the Insured prior the Insured’s Trip Departure Date and shown on any required application which is subject to cancellation penalties or restrictions. Trip cost will also include the cost of any subsequent pre-paid payments or deposits paid by the Insured for the same Trip, after application for coverage under this plan provided the Insured amends the Application to add such subsequent payments or deposits and pays any required additional plan cost prior to the Insured’s Departure Date.