Water supply assessment definition

Water supply assessment means the assessment required by Section 10910 of the California Water Code.
Water supply assessment means the assessment required by Section 10910 of the California Water Code. "Water supply verification" means the verification required by Section 66473.7 of the California Government

Examples of Water supply assessment in a sentence

  • A scenario similar to one in which the Upper Basin is only entitled to around4.89 maf of Colorado River water would also severely limit the Upper Basin states’ ability to meet the requirements of Article III(d) of the 1922 Compact 174 Water supply assessment, supra note 112, at ch.

  • Water supply assessment requirements include the identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, and prior years’ water deliveries received by the public water system.

  • The Water supply assessment is being finalized and will be included in the plan.

  • An overview of statewide and regional issues currently impacting water supply.2. Water supply assessment and planning steps needed to address the various water supply concerns.3. Specific programmatic changes needed to facilitate improvedmanagement of the resource.4. Funding needs and financing options.

  • Water supply assessment provided by Golden State Water Company.WASTEWATERThis Plan considers that increased development may require upgrades to the current wastewater and facilities.

  • Situation Assessment: Annual operating analysis is currently undertaken to assess water quality management options for the Vaal Barrage and Rand Water supply, assessment of pumping costs, and level of restrictions if in a drought.

  • Water supply assessment –for certain large projects (although there may be some movement in this area of the law and more projects may become subject to this analysis; (Pub.

  • Water supply assessment provided by Golden State Water Company.WastewaterThis Plan considers that increased development may require upgrades to the current wastewater and facilities.

Related to Water supply assessment

  • Water Supply Any problem with water supply? Yes No Unknown Comments: Home water treatment system: Yes No Unknown Comments: Fire sprinkler system: Yes No Unknown Does Not Apply Comments: Are the systems in operating condition? Yes No Unknown Comments:

  • Water supply system means a water distribution system, piping, connection fittings, valves and appurtenances within a building, structure, or premises. Water supply systems are also referred to commonly as premise plumbing systems.

  • water supplier means the company supplying water in the water supply zone, whether a water undertaker or licensed water supplier;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • licensed water supplier means a company which is the holder for the time being of a water supply licence under Section 17A(1) of the 1991 Act(f);

  • development charge means a charge imposed pursuant to this By-law;

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Site Assessment means an environmental assessment report for the Mortgaged Property prepared at Borrower’s expense by a qualified environmental consultant engaged by Borrower, or by Lender on behalf of Borrower, and approved by Lender, and in a manner reasonably satisfactory to Lender, based upon an investigation relating to and making appropriate inquiries to evaluate the risks associated with Mold and any existence of Hazardous Materials on or about the Mortgaged Property, and the past or present discharge, disposal, release or escape of any such substances, all consistent with the most current version of the ASTM 1527 standard (or any successor standard published by ASTM) and good customary and commercial practice.

  • Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.

  • Needs assessment In this section, LEAs are asked to describe the impact of the pandemic on their students, examine disproportionate impacts on specific student groups, and highlight the LEA’s promising practices in supporting students’ needs since March 2020.

  • Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Phase I Environmental Site Assessment means a Phase I environmental property assessment of the Assets that satisfies the basic assessment requirements set forth under the current ASTM International Standard Practice for Environmental Site Assessments (Designation E1527-13) or any other visual site assessment or review of records, reports or documents.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.

  • Family assessment means a comprehensive assessment of child

  • engineering services means infrastructure for –

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Development Charges or “DC” shall mean the amount charged by the Company from the Applicant(s) towards carrying out the developmental works inside or around the Project, including but not limited to the payment of the following:

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;

  • Assessment area means an area, or, if more than one area is designated, the

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.

  • conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;

  • Manufacturing operation means a process in which materials are changed, converted, or transformed into a different state or form from which they previously existed and includes refining materials, assembling parts, and preparing raw materials and parts by mixing, measuring, blending, or otherwise committing such materials or parts to the manufacturing process. "Manufacturing operation" does not include packaging.

  • self-assessment ’ means a determination of the amount of tax payable under a tax Act by a taxpayer and—