Contract
CONTRACTOR'S NAME | X. Xxxxxxx Construction Inc. | Xxxxxx Xxxxxxx Ptg & Constr. LLC | Tekcon Construction, Inc. | Brunswick Builders LLC | Cypreco Industries Inc. | Abhzeen Design | ||||||||
0000 Xxx 00 Xxxxx | 00 Xxxxxxxxx Xxx | 000 Xxxxxxxx Xx | XX Xxx 0000 | XX Xxx 000 | 0000 Xxxxxxxxxxx Xx | |||||||||
Xxxxxxxx Xxxxxx, XX 00000 | Xxxx Xxxx Xxxxxx, XX 00000 | Xxxxxxxx, XX 00000 | Xxxx Xxxxxxxxx, XX 00000 | Xxxxxxx, XX 00000 | Xxxx Xxxxx, XX 00000 | |||||||||
(000) 000-0000 | (000) 000-0000 | (000) 000-0000 | (000) 000-0000 | (000) 000-0000 | (000) 000-0000 | |||||||||
ITEM | DESCRIPTION | CONTRACT QUANTITY & UNIT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT |
1 | GENERAL WORK Inclusive of all mobilization, demolition, remediation of materials/work areas(as required), and final clean up | LUMP SUM | $6,700.00 | $6,700.00 | LUMP SUM | $16,000.00 | $6,000.00 | $6,000.00 | $6,351.00 | $6,351.00 | LUMP SUM | $25,000.00 | $7,640.00 | $7,640.00 |
2 | WINDOW REPLACEMENT Furnishing and installing new vinyl replacement windows inclusive of removal of all existing windows, trim, and unsuitable framing; repairing framing and rough openings as necessary to provide windows of same/similar size openings; sealing rough openings to windows; repairing and restoring framework/casework around perimeter on interior & exterior walls; for a complete installation. Note: Each of the two double window installations in Engine Bay No. 1 are counted as single units; total 2 units in Engine Bay No. 1 | 19 | $450.00 | $8,550.00 | $2,000.00 | $38,000.00 | $900.00 | $17,100.00 | $1,271.00 | $24,149.00 | $1,250.00 | $23,750.00 | $890.00 | $16,910.00 |
3 | INTERIOR DOOR INSTALLATION Furnishing & Installing Fire-Rated single-door steel interior doors & frames inclusive of installing ADA-compliant saddles; furnishing & installing single-bore lever-handles, lock sets and automatic door closures; and all incidental work for a complete installation. | 13 | $1,519.00 | $19,747.00 | $3,000.00 | $39,000.00 | $1,700.00 | $22,100.00 | $4,763.00 | $61,919.00 | $2,000.00 | $26,000.00 | $1,900.00 | $24,700.00 |
4 | THROUGH-WALL A/C UNIT INSTALLATION Furnishing & Installing new packaged through-wall air conditioning units inclusive of sizing units for rooms of the various sizes; determining optimal placement for installation on existing exterior walls; constructing openings in exterior walls to accept the units; installing interior & exterior trim to provide weather tight seal on exterior of wall; installing supplemental electric supply lines/circuits as necessary to points of installation compliant with building code requirements; installation of electrical supply lines in through-wall or surface-mounted conduit as necessary for a complete installation of operational units. | 4 | $1,700.00 | $6,800.00 | $5,000.00 | $20,000.00 | $1,100.00 | $4,400.00 | $5,716.00 | $22,864.00 | $9,000.00 | $36,000.00 | $4,450.00 | $17,800.00 |
5 | INTERIOR WALL REPAIRS Furnishing & Installing new gypsum board wall where noted in the Schedule of Work inclusive of removal of existing plaster/sheetrock, lathe & trim; installation of framing/bracing as necessary to support new installation; installing corner beading & edging as necessary to meet existing walls & ceilings; taping and finishing all joints & transitions to existing walls/ceilings; for a complete installation. | LUMP SUM | $2,500.00 | $2,500.00 | LUMP SUM | $15,000.00 | $20,000.00 | $20,000.00 | $6,986.00 | $6,986.00 | LUMP SUM | $18,500.00 | $6,400.00 | $6,400.00 |
6 | FINAL FINISH WORK AND PAINTING | |||||||||||||
0x | Xxxxxxx Xxxxxxxx, Xxxxxxxx & Xxxxxxxxx Furnish and Install casement & molding for: * Closet Opening in Captain's Office * Closet Opening in Day Room * Doorway between Kitchen & Day Room Install all baseboards supplied by Owner | LUMP SUM | $2,700.00 | $2,700.00 | LUMP SUM | $4,000.00 | $7,500.00 | $7,500.00 | $6,986.00 | $6,986.00 | LUMP SUM | $4,500.00 | $5,400.00 | $5,400.00 |
CONTRACTOR'S NAME | X. Xxxxxxx Construction Inc. | Xxxxxx Xxxxxxx Ptg & Constr. LLC | Tekcon Construction, Inc. | Brunswick Builders LLC | Cypreco Industries Inc. | Abhzeen Design | ||||||||
0000 Xxx 00 Xxxxx | 00 Xxxxxxxxx Xxx | 000 Xxxxxxxx Xx | XX Xxx 0000 | XX Xxx 000 | 0000 Xxxxxxxxxxx Xx | |||||||||
Xxxxxxxx Xxxxxx, XX 00000 | Xxxx Xxxx Xxxxxx, XX 00000 | Xxxxxxxx, XX 00000 | Xxxx Xxxxxxxxx, XX 00000 | Xxxxxxx, XX 00000 | Xxxx Xxxxx, XX 00000 | |||||||||
(000) 000-0000 | (000) 000-0000 | (000) 000-0000 | (000) 000-0000 | (000) 000-0000 | (000) 000-0000 | |||||||||
ITEM | DESCRIPTION | CONTRACT QUANTITY & UNIT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT | UNIT PRICE | AMOUNT |
6b | Spot Repair & Restoration - All First Floor Rooms Within all rooms an the first floor of the building, Construct surface repair & priming of all interior wall surfaces affected by the various items of work in the contract; repair all areas of existing wall surfaces as required to receive paint. | LUMP SUM | $2,500.00 | $2,500.00 | LUMP SUM | $10,000.00 | $9,500.00 | $9,500.00 | $5,081.00 | $5,081.00 | LUMP SUM | $7,500.00 | $6,400.00 | $6,400.00 |
6c | Finish Paintings in All First Floor Rooms Prime & paint all ceiling & wall surfaces including door trim as necessary; inclusive of painting surface mounted pipes & conduits for a complete installation in all first floor rooms. | LUMP SUM | $7,200.00 | $7,200.00 | LUMP SUM | $12,000.00 | $16,000.00 | $16,000.00 | $8,256.00 | $8,256.00 | LUMP SUM | $25,000.00 | $49,900.00 | $49,900.00 |
7 | KITCHEN CABINET/COUNTER INSTALLATION | |||||||||||||
7a | Estimated & Base Cabinets & 5 Wall Cabinets Furnish & Install stock utility-grade base & wall cabinets within kitchen inclusive of determining final layout and unit count from guide provided in the Schedule of Work; Furnishing & Installing drawer & cabinet pulls on all base & wall cabinets, and toe-kick on base cabinets; inclusive of all shims & anchore necessary for a complete installation. | LUMP SUM | $5,000.00 | $5,000.00 | LUMP SUM | $13,000.00 | $15,000.00 | $15,000.00 | $5,716.00 | $5,716.00 | LUMP SUM | $15,000.00 | $15,400.00 | $15,400.00 |
7b | Estimated 2-9'+ and 1-4'+ straight sections of Countertop Furnish & Install laminate countertop over base cabinet installation, inclusive of trimming & finishing all exposed edges for a complete installation. | LUMP SUM | $1,500.00 | $1,500.00 | LUMP SUM | $2,000.00 | $2,500.00 | $2,500.00 | $4,446.00 | $4,446.00 | LUMP SUM | $1,500.00 | $2,300.00 | $2,300.00 |
7c | Install existing radiator within foyer / kitchen entrance on existing supply line, inclusive of testing for leaks for a complete & operational installation. | LUMP SUM | $700.00 | $700.00 | LUMP SUM | $2,000.00 | $3,500.00 | $3,500.00 | $3,811.00 | $3,811.00 | LUMP SUM | $2,500.00 | $1,000.00 | $1,000.00 |
7d | Furnish & Install range hood with external exhaust duct to outside wall, including all duct work, electrical connections and wall restoration for a complete installation. | LUMP SUM | $850.00 | $850.00 | LUMP SUM | $8,000.00 | $10,000.00 | $10,000.00 | $4,128.00 | $4,128.00 | LUMP SUM | $3,000.00 | $2,800.00 | $2,800.00 |
7e | Install existing stove, sink & refrigerator in kitchen inclusive of all connections to utility supply and waste lines as required by Code for a complete & operational installation. | LUMP SUM | $1,500.00 | $1,500.00 | LUMP SUM | $6,000.00 | $2,500.00 | $2,500.00 | $4,128.00 | $4,128.00 | LUMP SUM | $9,000.00 | $2,800.00 | $2,800.00 |
TOTAL | $66,247.00 | $185,000.00 | $136,100.00 | $164,821.00 | $197,250.00 | $159,450.00 | ||||||||
EXCEPTIONS TAKEN (YES/NO) | NO | NO | NO | NO | NO | YES |