Additional Physical Design Specifications. Licensee's facilities placed in BellSouth's conduit system must meet all of the following physical design specifications:
Additional Physical Design Specifications. Conduit. Facilities placed in SBC MISSOURI’s conduit system following the effective date of this Appendix shall meet all of the following physical design specifications:
Additional Physical Design Specifications. 4.4.1 CLEC’s Facilities placed in AT&T-22STATE’s Conduit System must meet all of the following physical design specifications:
Additional Physical Design Specifications. Licensee’s Facilities placed in AT&T’s Conduit System must meet all of the following physical design specifications:
Additional Physical Design Specifications. Attaching Party’s facilities placed in AT&T’s Conduit System must meet all of the following physical design specifications:
6.5.1 Cables bound or wrapped with cloth or having any kind of fibrous coverings or impregnated with an adhesive material shall not be placed in AT&T’s Conduit or Ducts.
6.5.2 The integrity of AT&T’s Conduit System and overall safety of AT&T’s personnel and other personnel working in AT&T’s Conduit System requires that dielectric cable be placed when Attaching Party’s cable utilizes an alternative Duct or route that is shared in the same trench by any current-carrying facility of a power utility.
6.5.3 New construction splices in Attaching Party’s fiber optic and twisted pair cables may be located in AT&T’s Manholes or Handholes only when, in AT&T’s sole judgment: (a) there is sufficient space available; and (b) placing splice cases outside of AT&T’s Manholes or Handholes is unreasonable in light of the cost and feasibility. In those cases, AT&T may, in its sole discretion, permit Attaching Party to place new construction splices in AT&T’s Conduit System at a location to be determined by AT&T. In no event are any splice points allowed in AT&T’s Conduit or Ducts.
6.5.4 Attaching Party will be permitted to connect its Conduit or Duct only at an AT&T Manhole. No attachment will be made by entering or breaking into Conduit between Manholes. All necessary work to install Attaching Party facilities will be performed by Attaching Party, or its contractor, at Attaching Party’s expense. In no event shall Attaching Party, or its contractor, “core bore” or make any other modification to AT&T Manhole(s) without the prior written approval of AT&T.
6.5.5 If Attaching Party constructs or utilizes a Duct connected to AT&T’s Manhole, the Duct and all connections between that Duct and AT&T’s Manhole shall be sealed, to the extent practicable, to prevent the entry of gases or liquids into AT&T’s Conduit System. If Attaching Party’s Duct enters a building, it shall also be sealed where it enters the building and at all other locations necessary to prevent the entry of gases and liquids from the building into AT&T’s Conduit System.
Additional Physical Design Specifications. Attaching Party’s facilities placed in AT&T’s Conduit System must meet all of the following physical design specifications:
Additional Physical Design Specifications. 4.4.1 WSP’s Facilities placed in AT&T-21STATE’s Conduit System must meet all of the following physical design specifications:
Additional Physical Design Specifications. Conduit 40 6.7 Efficient Use of Conduit 40
Additional Physical Design Specifications. Conduit Facilities placed in NEVADA’s conduit system following the effective date of this Agreement shall meet all of the following physical design specifications:
Additional Physical Design Specifications. Conduit. Facilities placed in AT&T’s conduit system following the effective date of this Appendix shall meet all of the following physical design specifications: