Additional Scheduling Protocols When NCPA Sample Clauses

Additional Scheduling Protocols When NCPA is the Scheduling Coordinator 5.1. Seller is to notify NCPA of all planned or forced generation outages to ensure compliance with CAISO Outage Coordination and Enforcement Protocols. 5.1.1. Outage information provided by Seller is to include, at a minimum, start and stop time of Outage, capacity out of service (kW), equipment out of service, and reason for the Outage. 5.1.2. Planned Outages not included in the Annual Operations Forecast, the Quarterly Operations Forecast, or the Weekly Update, shall be provided by Seller to Buyer at least four (4) business days prior to the start of the requested outage.
AutoNDA by SimpleDocs

Related to Additional Scheduling Protocols When NCPA

  • Development Schedule The Project shall substantially comply with the specific timetables and triggers for action set forth in Article 5 of this Agreement. The parties acknowledge that, as provided in G.S. 160A-400.25(b), the failure to meet a commencement or completion date shall not, in and of itself, constitute a material breach of this Agreement pursuant to G.S. 160A-400.27 but must be judged based upon the totality of the circumstances.

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Alternative Work Schedules Employees may request alternative work schedules such as a nine (9) day - 80 hour two week schedule or a four (4) day - 40 hour week schedule. Management will respond to an employee's request within 15 calendar days. Any changes from existing work schedules will be based on the needs of the service as determined by Management. Employees covered by the Fair Labor Standards Act will not be placed on alternate work schedules that mandate the payment of overtime under the Act.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Research Use Reporting To assure adherence to NIH GDS Policy, the PI agrees to provide annual Progress Updates as part of the annual Project Renewal or Project Close-out processes, prior to the expiration of the one (1) year data access period. The PI who is seeking Renewal or Close-out of a project agree to complete the appropriate online forms and provide specific information such as how the data have been used, including publications or presentations that resulted from the use of the requested dataset(s), a summary of any plans for future research use (if the PI is seeking renewal), any violations of the terms of access described within this Agreement and the implemented remediation, and information on any downstream intellectual property generated from the data. The PI also may include general comments regarding suggestions for improving the data access process in general. Information provided in the progress updates helps NIH evaluate program activities and may be considered by the NIH GDS governance committees as part of NIH’s effort to provide ongoing stewardship of data sharing activities subject to the NIH GDS Policy.

  • Service Levels All service level requirements will be set forth in Exhibit A (“XXXX.xxx Referral Service Level Requirements”). Recipient Xxxxxx agrees to adhere, and encourage Recipient Agent’s adherence, with the version of the XXXX.xxx Referral Service Level Requirements in effect at the time XXXX.xxx identifies the Referral to Recipient Broker/Agent.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only)

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.