Adjustments to Actual Energy Capability Sample Clauses

Adjustments to Actual Energy Capability. The AEC of a Party for a Period shall be determined within five business days after the end of such Period. The determination of AEC shall be based on the energy actually received under firm contracts and arrangements with systems outside the Coordinated System and actual energy generated from a Party's Firm Resources and then adjusted for any rights and obligations pursuant to this subsection 9(b), observing priorities for use of facilities set forth in
AutoNDA by SimpleDocs

Related to Adjustments to Actual Energy Capability

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity or aircraft type.

  • Payment of Utilities Pay for electricity and all other utilities consumed in or relating to the Subject Unit and proportionately for the Common Portions.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Uncontrollable Forces Tariff Provisions Section 14.1 of the CAISO Tariff shall be incorporated by reference into this Agreement except that all references in Section 14.1 of the CAISO Tariff to Market Participants shall be read as a reference to the Participating Generator and references to the CAISO Tariff shall be read as references to this Agreement.

  • New utilities (i) The Contractor shall allow, subject to the permission from the Authority and such conditions as the Authority may specify, access to, and use of the Site for laying telephone lines, water pipes, electricity lines/ cables or other public utilities. Where such access or use causes any financial loss to the Contractor, it may require the user of the Site to pay compensation or damages as per Applicable Laws. For the avoidance of doubt, it is agreed that use of the Site under this Clause 9.3 shall not in any manner relieve the Contractor of its obligation to construct and maintain the Project Highway in accordance with this Agreement and any damage caused by such use shall be restored forthwith at the cost of the Authority. (ii) The Authority may, by notice, require the Contractor to connect any adjoining road to the Project Highway, and the connecting portion thereof falling within the Site shall be constructed by the Contractor at the Authority’s cost in accordance with Article 10. (iii) The Authority may by notice require the Contractor to connect, through a paved road, any adjoining service station, hotel, motel or any other public facility or amenity to the Project Highway, whereupon the connecting portion thereof that falls within the Site shall be constructed by the Contractor on payment of the cost. The cost to be paid by the Authority to the Contractor shall be determined by the Authority’s Engineer. For the avoidance of doubt, in the event such road is to be constructed for the benefit of any entity, the Authority may require such entity to make an advance deposit with the Contractor or the Authority, as the case may be, of an amount equal to the estimated cost as determined by the Authority’s Engineer and such advance shall be adjusted against the cost of construction as determined by the Authority’s Engineer hereunder. (iv) In the event construction of any Works is affected by a new utility or works undertaken in accordance with this Clause 9.3, the Contractor shall be entitled to a reasonable Time Extension as determined by the Authority’s Engineer.

  • Number Resources, Rate Center Areas and Routing Points 8.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes. 8.2 It shall be the responsibility of each Party to program and update its own switches and network systems pursuant to information provided in the LERG in order to recognize and route traffic to the other Party’s assigned NXX codes. Except as expressly set forth in this Agreement, neither Party shall impose any fees or charges whatsoever on the other Party for such activities. 8.3 Unless otherwise required by Commission order, the Rate Center Areas will be the same for each Party. During the term of this Agreement, Onvoy shall adopt the Rate Center Area and Rate Center Points that the Commission has approved for Frontier within the LATA and Tandem serving area. Onvoy shall assign whole NPA-NXX codes to each Rate Center Area unless otherwise ordered by the FCC, the Commission or another governmental entity of appropriate jurisdiction, or the LEC industry adopts alternative methods of utilizing NXXs. 8.4 Onvoy will also designate a Routing Point for each assigned NXX code. Onvoy shall designate one location for each Rate Center Area in which the Onvoy has established NXX code(s) as the Routing Point for the NPA-NXXs associated with that Rate Center Area, and such Routing Point shall be within the same LATA as the Rate Center Area but not necessarily within the Rate Center Area itself. Unless specified otherwise, calls to subsequent NXXs of Onvoy will be routed in the same manner as calls to Xxxxx’s initial NXXs. 8.5 Notwithstanding anything to the contrary contained herein, nothing in this Agreement is intended, and nothing in this Agreement shall be construed, to in any way constrain Onvoy’s choices regarding the size of the local calling area(s) that Onvoy may establish for its Customers, which local calling areas may be larger than, smaller than, or identical to Frontier’s local calling areas.

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

  • FREQUENCY AND COVERAGE 3.1 All MI Reports must be completed by the Supplier using the MI Reporting Template and returned to the Authority on or prior to the Reporting Date every Month during the Framework Period and thereafter, until all transactions relating to Call Off Agreements have permanently ceased. 3.2 The MI Report should be used (among other things) to report Orders received and transactions occurring during the Month to which the MI Report relates, regardless of when the work was actually completed. For example, if an invoice is raised for October but the work was actually completed in September, the Supplier must report the invoice in October's MI Report and not September's. Each Order received by the Supplier must be reported only once when the Order is received. 3.3 The Supplier must return the MI Report for each Month even where there are no transactions to report in the relevant Month (a "Nil Return"). 3.4 The Supplier must inform the Authority of any errors or corrections to the Management Information: 3.4.1 in the next MI Report due immediately following discovery of the error by the Supplier; or 3.4.2 as a result of the Authority querying any data contained in an MI Report.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!