Agreed Permit Work Programs and Budgets Sample Clauses

Agreed Permit Work Programs and Budgets. (a) The Work Program and Budget detailing the Operations to be performed in respect of the Permit for the fourth and fifth Permit Years is attached as Schedule 2. (b) On or before the first day of June of each year beginning 2017 and continuing each year thereafter, Operator shall deliver to Nation a proposed Work Program and Budget detailing the Operations to be performed in respect of the Permit for the following Permit Year. Within 21 days after such delivery, the Operating Committee shall meet to consider and endeavour to agree the Work Program and Budget; failing agreement, the proposed Work Program and Budget reasonably estimated to cost the least will conclusively be deemed adopted, so long as such proposed Work Program and Budget will satisfy all of the Minimum Work Obligations of that Permit Year. (c) Any approved Work Program and Budget may be revised by the Operating Committee from time to time. To the extent such revisions are approved by the Operating Committee, the Work Program and Budget will be amended accordingly.
AutoNDA by SimpleDocs
Agreed Permit Work Programs and Budgets. (a) The Work Program and Budget detailing the Operations to be performed in respect of the Permit for the remainder of the third Permit Year is attached as Schedule 3. (b) On or before the first day of June of each year beginning 2016 and continuing each year thereafter, Operator shall deliver to Nation a proposed Work Program and Budget detailing the Operations to be performed in respect of the Permit for the following Permit Year. Within 30 days of such delivery, the Operating Committee shall meet to consider and endeavour to agree a Work Program and Budget. (c) The Work Program and Budget for the fourth and subsequent Permit Years will be adopted by the unanimous vote of both Paltar and Nation; provided, however, that if the Parties fail unanimously to agree, the proposed Work Program and Budget reasonably estimated to cost the least will conclusively be deemed adopted, so long as such proposed Work Program and Budget (i) consists solely of work to be performed on or for the benefit of the Nation Blocks and (ii) will satisfy all of the Minimum Work Obligations of that Permit Year. For the avoidance of doubt, geological and geophysical operations conducted both on the Nation Blocks and on adjoining lands shall be considered work performed on or for the benefit of the Nation Blocks where the operator believes such work prudent to gain a fxxxxx understanding of the geology of the Nation Blocks. (d) Work Programs and Budgets for subsequent years will be determined under the JVOA. Paltar will initially propose to the Management Committee of that joint venture a Work Program and Budget consisting of work to be performed on or for the benefit of the Nation Blocks in an amount sufficient to satisfy the Minimum Work Obligations of that Permit Year. This initial Paltar proposal will be unanimously agreed by Paltar and Nation or, failing unanimous agreement, will be the lowest cost proposal. If this initial Paltar proposal for a particular year is not adopted by the Beetaloo Joint Venture Management Committee, then Paltar will have sole authority to negotiate, propose, vote, and otherwise act in respect of subsequent proposals in Paltar’s sole discretion. Paltar will not be required to consult or seek the approval of Nation in connection with its actions relating to these subsequent proposals, although it will endeavour to keep Nation informed concerning these proposals and to consider any views that may be expressed by Nation. (e) Any approved Work Program and Bu...

Related to Agreed Permit Work Programs and Budgets

  • Annual Work Plans and Budgets The Recipient shall furnish to the Association as soon as available, but in any case not later than September 1 of each year, the annual work plan and budget for the Project for each subsequent year of Project implementation, of such scope and detail as the Association shall have reasonably requested, except for the annual work plan and budget for the Project for the first year of Project implementation, which shall be furnished no later than one (1) month after the Effective Date.

  • Business Plan and Budget As soon as available, but in any event within sixty (60) days after the end of each fiscal year of the Borrower, an annual business plan and budget of the Borrower and its Subsidiaries on a Consolidated basis, including forecasts prepared by management of the Borrower, in form reasonably satisfactory to the Lender, of Consolidated balance sheets and statements of income or operations and cash flows of the Borrower and its Subsidiaries on a fiscal year basis and, in the case of such forecasted statements of income, on a fiscal quarterly basis for the immediately following fiscal year. As to any information contained in materials furnished pursuant to Section 6.02(f), the Borrower shall not be separately required to furnish such information under Section 6.01(a) or (b) above, but the foregoing shall not be in derogation of the obligation of the Borrower to furnish the information and materials described in Sections 6.01(a) and (b) above at the times specified therein.

  • Project Work Plan The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from PEI and the Grantee.

  • Development Plans Shipper has provided Gatherer with a report attached hereto as Exhibit D (the “Current Development Plan”) describing in detail, as of January 1, 2017, the planned development, drilling, and production activities to take place with respect to Dedicated Production for the applicable Development Period. The information contained in the TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). Current Development Plan is broken out on a Subsystem-by-Subsystem basis and, with respect to the first three Years covered by the Current Development Plan, on a Quarter-by-Quarter basis, and with respect to the remaining Years covered by the Current Development Plan, on a Year-by-Year basis. The Current Development Plan attached hereto has been approved by the Parties. (a) From time to time during each Year of the Term, the Parties shall meet to discuss the planned development, drilling, and production activities that Shipper expects to take place with respect to Dedicated Production for the then-applicable Development Period. Shipper and Gatherer shall each make their respective representatives available to participate in such meetings and discussions. No later than August 1 of each such Year, Shipper shall provide (or cause to be provided) to Gatherer a proposed update of the then-currently agreed Development Plan, prepared on the same basis as the Current Development Plan and describing in detail the planned development, drilling, and production activities to take place with respect to Dedicated Production for the then-applicable Development Period (any such update, an “Updated Development Plan” and, together with the Current Development Plan, each, a “Development Plan”). Notwithstanding anything herein to the contrary, in no event shall Gatherer be required to agree to any Updated Development Plan and corresponding updated Gathering System Plan that contains a Committed Build-Out that (i) has a corresponding Target Completion Date that occurs after the end of the Initial Term, and (ii) Gatherer, in its sole discretion, does not wish to approve. (b) Each proposed Development Plan shall include information as to the following, in each case, broken out on a Subsystem-by-Subsystem basis and, with respect to the first three Years covered by such Development Plan, on a Quarter-by-Quarter basis, and, with respect to the remaining Years covered by such Development Plan, on a Year-by-Year basis: (i) all Xxxxx that, as of the date such Development Plan was delivered, are currently in existence and (A) the production therefrom is being delivered into the Gathering System, or (B) are awaiting connection to the Gathering System; (ii) the Xxxxx that are expected to be drilled during the time period covered by such Development Plan (each such Well reflected in such Development Plan, a “Planned Well”), and the estimated timing of the drilling of such Planned Xxxxx; (iii) forward-looking production estimates for the applicable time period covered by such Development Plan for all Shipper Gas (A) that Shipper reasonably and in good faith believes will become owned or Controlled by Shipper during the time period covered by such Development Plan, and/or (B) that will be produced from (I) in the aggregate, all Xxxxx then-existing and (II) in the aggregate, any Planned Xxxxx included in such Development Plan (such collective estimates described in subsections (A) and (B), both with respect to a particular Quarter and an entire Year, the “Dedicated Production Estimates”); TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). (iv) forward-looking estimates for the applicable time period covered by such Development Plan of the aggregate volumes of those Shipper Injected Liquids that Shipper intends to Tender to the Injection Points hereunder to receive the System Services (such estimates, both with respect to a particular Quarter and an entire Year, the “System Liquids Estimates” and, together with the Dedicated Production Estimates, the “System Production Estimates”); (v) (A) each new receipt point (including the location thereof) proposed by Shipper with respect to the System Production Estimate reflected in such Development Plan (each such receipt point, including those located at the site of a Planned Well, a “Planned Receipt Point”), (B) each Receipt Point at which Shipper expects to Tender Shipper Gas and/or Shipper Injected Liquids reflected in such Development Plan into the Gathering System, and (C) the estimated portion of the System Production Estimate contained in such Development Plan that Shipper expects to Tender at each such Receipt Point and Planned Receipt Point; (vi) the earliest date on which each Planned Well included in the Development Plan is estimated to be completed and producing, which date shall not be earlier than three Months after the January 1st that is immediately subsequent to the date that the Development Plan that initially reflected such Planned Well was delivered to Gatherer hereunder; (vii) the anticipated characteristics of the production from the Xxxxx and Planned Xxxxx reflected in such Development Plan (including liquids content and gas and liquids composition) and the projected production volumes and production pressures applicable thereto; provided that Shipper may utilize the existing and historical production information from similarly situated Xxxxx; (viii) (A) each new delivery point (including the location thereof) proposed by Shipper with respect to the System Production Estimate reflected in such Development Plan (each such delivery point, a “Planned Delivery Point”), (B) each Delivery Point at which Shipper expects Shipper Gas produced from the Xxxxx and Planned Xxxxx reflected in such Development Plan to be redelivered to Shipper, (C) each Delivery Point at which Shipper expects any Drip Liquids allocated to Shipper in accordance with this Agreement and/or Shipper Injected Liquids to be redelivered to Shipper, and (D) the estimated portion of the System Production Estimate contained in such Development Plan that Shipper expects to be redelivered to Shipper at each such Delivery Point and Planned Delivery Point; (ix) any (A) proposed revision to the then-existing Dedicated Area and/or any then-existing Dedicated Contract and/or (B) any new contract that Shipper proposes to be a Dedicated Contract; and (x) other information reasonably requested by Gatherer that is relevant to the design, construction, and operation of the Gathering System, including (A) any Subsystem Extension proposed by Shipper, (B) the relevant Receipt Point, Planned Receipt Point, Delivery Point and Planned Delivery Point facilities applicable to such TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH TWO ASTERISKS (**). Development Plan, and (C) any treating, processing, or liquids handling facilities proposed by Shipper that may be required for any Shipper Gas and/or Shipper Injected Liquids to meet applicable Downstream Facility specifications at the Delivery Points.

  • Project Plans The Contractor: must carry out the Contractor's Activities in accordance with, and otherwise implement, the Project Plans; and for the purposes of subparagraph (i), must: prepare Project Plans based, where applicable, on the draft Project Plans lodged by the Contractor in its tender for the Contractor's Activities, and otherwise in accordance with the requirements of the Contract and submit them to the Contract Administrator so as to ensure that there is no delay or disruption to the Contractor's Activities and in any event no later than the number of days specified in the Contract Particulars after the Award Date for each Project Plan; not commence any of the Contractor's Activities to which any Project Plan applies, unless the Contract Administrator has had the number of days specified in the Contract Particulars for each Project Plan to review the Project Plan and has not rejected the Project Plan; if any Project Plan is rejected, submit an amended Project Plan to the Contract Administrator; in any event, finalise each Project Plan so as to ensure that there is no delay or disruption to the Contractor's Activities and in any event in accordance with the requirements of the Contract to the satisfaction of the Contract Administrator; after each Project Plan has been finalised: regularly review, update and amend each Project Plan in accordance with the process set out in each Project Plan (and otherwise at least on each anniversary of the Award Date); update or amend a Project Plan on request of the Contract Administrator; and continue to correct any defects in or omissions from a Project Plan (whether identified by the Contract Administrator or the Contractor), and submit an updated or amended Project Plan to the Contract Administrator, after which: the Contractor must continue to comply with the requirements of the then current Project Plan until the process in subparagraph (ii) has been completed in respect of the updated or amended Project Plan; and subsubparagraphs B - E will apply (to the extent applicable); and document and maintain detailed records of all: reviews, updates, amendments and submissions of each Project Plan; audits or other monitoring of each Project Plan; and training and awareness programs and communications provided to Contractor and subcontractor personnel in respect of each Project Plan (including each updated or amended Project Plan). The Contractor will not be relieved from compliance with any of its obligations under the Contract or otherwise at law or in equity as a result of: the implementation of, and compliance with, the requirements of any Project Plan; any direction by the Contract Administrator concerning a Project Plan or the Contractor's compliance or non-compliance with a Project Plan; any audit or other monitoring by the Contract Administrator or anyone else acting on behalf of the Commonwealth of the Contractor's compliance with a Project Plan; or any failure by the Contract Administrator, or anyone else acting on behalf of the Commonwealth, to detect any defect in or omission from a Project Plan including where any such failure arises from any negligence on the part of the Contract Administrator or other person.

  • Work Plans Tenant shall prepare and submit to Landlord for approval schematics covering the Tenant Improvements prepared in conformity with the applicable provisions of this Work Letter (the “Draft Schematic Plans”). The Draft Schematic Plans shall contain sufficient information and detail to accurately describe the proposed design to Landlord and such other information as Landlord may reasonably request. Landlord shall notify Tenant in writing within ten (10) business days after receipt of the Draft Schematic Plans whether Landlord approves or objects to the Draft Schematic Plans and of the manner, if any, in which the Draft Schematic Plans are unacceptable. Landlord’s failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If Landlord reasonably objects to the Draft Schematic Plans, then Tenant shall revise the Draft Schematic Plans and cause Landlord’s objections to be remedied in the revised Draft Schematic Plans. Tenant shall then resubmit the revised Draft Schematic Plans to Landlord for approval, such approval not to be unreasonably withheld, conditioned or delayed. Landlord’s approval of or objection to revised Draft Schematic Plans and Tenant’s correction of the same shall be in accordance with this Section until Landlord has approved the Draft Schematic Plans in writing or been deemed to have approved them. The iteration of the Draft Schematic Plans that is approved or deemed approved by Landlord without objection shall be referred to herein as the “Approved Schematic Plans.”

  • Development Budget Attached hereto as Exhibit "B" and incorporated herein by this reference is the Development Budget in an amount equal to $_____________. Owner acknowledges and represents that the attached Development Budget includes the total costs and expenses to acquire, develop, renovate and construct the Real Property and the Apartment Housing.

  • Business Plans As promptly as possible, but in no event later than July 15, 2010 (and, as applicable, with current information as of June 30, 2010) the Manager shall deliver to the Initial Member written plans (each, a “Business Plan”) detailing the strategy to be used by it in managing and disposing of the assets of the Company in respect of all of the Loans for achieving the Company’s purposes with respect thereto, in conformance with the Servicing Standard, based, to the extent appropriate, on information gathered by the Company with respect to the Loans, which shall include (i) individual Business Plans for each of the ten (10) largest Loans based on their Unpaid Principal Balance as of the Cut-Off Date (as set forth on the Loan Schedule), and (ii) a consolidated Business Plan covering all Loans (a “Consolidated Business Plan”). With respect to the first such Business Plans and Consolidated Business Plan, the Manager shall meet with the Initial Member as reasonably requested by the Initial Member from time to time during the thirty (30) Business Days following the Initial Member’s receipt of the same, to review and discuss such Business Plans and Consolidated Business Plan, including changes thereto suggested by the Initial Member. Within thirty (30) Business Days following expiration of such review period, the Manager will deliver to the Initial member a final version of such Business Plans and Consolidated Business Plan reflecting such changes as the Manager considers to be appropriate in light of its discussions with the Initial Member during such review period. The Manager shall thereafter review and revise each Business Plan and Consolidated Business Plan as the circumstances may require, and in any event provide periodic updates to such Business Plans (and for each such update, the same shall cover the ten (10) largest Loans based on their Unpaid Principal Balance as of the time of such update) and Consolidated Business Plan to the Initial Member, in January (current as of December 31 of the immediately preceding year) and July (current as of June 30 of such year) of each year, commencing in January 2011, with each such periodic update to de delivered as part of the Monthly Reports due at such time pursuant to Section 7.4(b), Upon reasonable notice by the Initial Member, the Company shall make its personnel who are familiar with such Business Plans and Consolidated Business Plans available during normal business hours for the purposes of discussing such Business Plans and Consolidated Business Plans with representatives of the Initial Member and responding to questions therefrom. (a) Each Business Plan and Consolidated Business Plan will set forth a strategy for the disposition of the Loans addressed thereby which strategy may consist of one or more of the following: (i) the pay-off of Loans at a discount; (ii) modifications of the related note and/or mortgage, including reductions in the mortgage loan interest rate, reductions in the principal balance and rescheduling principal payments; (iii) foreclosure upon the related Underlying Collateral (or acquisition thereof by deed in lieu of foreclosure) and subsequent sale thereof; (iv) assumptions of Loans by new borrowers; (v) repairs to and, if applicable, completion of construction of the related Underlying Collateral, with a view towards selling such Underlying Collateral or the Loan secured thereby; (vi) sale of a Loan, either singly or in pools, before or after restructuring; and (vii) any other method of work-out, rehabilitation and disposition consistent with the Servicing Standard and other general duties of the Company specified in this Agreement. (b) Each Business Plan and Consolidated Business Plan will set forth a strategy for the disposition of each related Acquired Property which strategy may consist of one or more of the following: (i) the sale or leasing of the Acquired Property in whole or in parts, or in pools; (ii) making repairs to and, if applicable, completion of construction the Acquired Property or making changes to the Acquired Property so that it may be used for uses other than its current use, with a view toward selling the Acquired Property; (iii) rehabilitation or improvement and, if applicable, completion of construction of the Acquired Property, with a view toward selling the Acquired Property; (iv) continued leasing or sales activity with respect to the Acquired Property available for leasing or sale (in whole or in part) at the time it is transferred to a Ownership Entity; and (v) maintenance, landscaping and general upkeep of the Acquired Property. (c) Each Business Plan or Consolidated Business Plan shall contain the Company's estimate of the present value of the net amount that is recoverable with respect to each related Loan and projected Working Capital Expenses with respect thereto, and, in reasonable detail, the manner of calculation of such estimates. The Consolidated Business Plan shall include projected financials including statements of income, assets, and cash flows for the Company. Such cash flow projections shall, for the Consolidated Business Plan and each update thereto, include an Excel model of projected cash flows by month, as of June 30 and December 31 of each year (or, in the case of the initial Consolidated Business Plan, as of the date of preparation and delivery thereof) and covering a period not less than the upcoming 6 months, including projected monthly cash inflows on the Loans and REO, projected Excess Working Capital Advances and/or Discretionary Funding Advances, projected outflows of Servicing Expenses, projected Funding Draws, projected Working Capital Reserve levels, projected net monthly cash available for deposit into the Defeasance Account, and the amount and allocation of any projected distributions to Initial Member and Private Owner.

  • Work Progress The Developer and Connecting Transmission Owner will keep each other, and NYISO, advised periodically as to the progress of their respective design, procurement and construction efforts. Any Party may, at any time, request a progress report from the Developer or Connecting Transmission Owner. If, at any time, the Developer determines that the completion of the Connecting Transmission Owner’s Attachment Facilities will not be required until after the specified In-Service Date, the Developer will provide written notice to the Connecting Transmission Owner and NYISO of such later date upon which the completion of the Connecting Transmission Owner’s Attachment Facilities will be required.

  • Projects There shall be a thirty (30) km free zone around the projects excluding the Metro Vancouver Area. For local residents, kilometers shall be paid from the boundary of the free zone around the project. Workers employed by any contractor within an identified free zone who resides outside of that same free zone will be paid according to the Kilometer Chart from the project to their residence less thirty