Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.
Reimbursements and Purchase Orders Expense reimbursement is not guaranteed and, when possible, Board members should seek pre- approval of expenses by providing an estimation of expenses on the Board's standardized estimated expense approval form, except in situations when the expense is diminutive. When pre-approval is not sought, Board members must seek reimbursement on the Board's standardized expense reimbursement form. Expense reimbursements and purchase orders shall be presented to the Board in its regular bill process.
Forecasts and Purchase Orders (a) Following Regulatory Approval of one of the Initial Products during the term of this Agreement, Reliant shall provide to ASL no later than the first day of the first month of each calendar quarter a non-binding good faith estimate (“Quarterly Forecast”) by quarter of Reliant’s requirements for the Active Ingredient for the calendar quarter and the succeeding three (3) calendar quarters. Reliant will be obligated to purchase 75% of the quantities of API forecasted for the first two (2) succeeding calendar quarters of each Quarterly Forecast. Within (30) days of Regulatory Approval, Reliant shall provide an initial forecast (“Initial Forecast”) for the four calendar quarters following Regulatory Approval. (b) Reliant shall place binding purchase orders for Active Ingredient by written or electronic purchase order (or by any other means agreed to by the parties) to ASL, which shall be placed at least ninety (90) days prior to desired date of delivery. (c) ASL shall be obligated to supply Active Ingredient as ordered by Reliant. To the extent purchase orders in any calendar month exceed One Hundred Fifty percent (150%) of the Quarterly Forecast for the relevant quarter, ASL shall use its best efforts to supply 125% of the quantity ordered. (d) ASL shall maintain minimum inventory levels equal to the binding portion of the then current Quarterly Forecast. The Active Ingredient shall be shipped C.I.F. Duty Unpaid to a Designated Facility or other location agreed by the parties. Active Ingredient shall be shipped upon completion of production in temperature-controlled vehicles in accordance with the specifications including light protecting containers and the Quality Agreement in order to maintain the quality of the Active Ingredient. Carriers selected by ASL must be commercially reputable, able to track shipments and fully insured with adequate coverage to replace the value of the goods shipped. Title and risk of loss pass on delivery to the Designated Facility. (e) All shipments of Active Ingredient shall be accompanied by a packing slip and a certificate of analysis which describes the Active Ingredient, states the purchase order number, confirms that the Active Ingredient conforms in all ways with the Specifications, the Process Description and was manufactured in accordance with GMP and all other requirements of the Act. To the extent of any conflict or inconsistency between this Agreement and any purchase order, purchase order release, confirmation, acceptance or any similar document, the terms of this Agreement shall govern. (f) Reliant shall notify ASL of any short-shipment claims within thirty (30) days of receipt of a shipment of Active Ingredient. (g) ASL shall not be obligated to accept any returns of Active Ingredient other than as a result of such Active Ingredient failing to meet the Specifications in accordance with Section 2.9(a), was not manufactured in accordance with GMP, or does not otherwise comply with the manufacturing, storage and/or transportation requirements of the Act.
DISTRIBUTION OF CONTRACTOR PRICE LIST AND CONTRACT APPENDICES Contractor shall provide Authorized Users with electronic copies of the Contract, including price lists and Appendices, upon request. Contract Updates will be handled as provided in Appendix C – Contract Modification Procedures.
Construction Documents Phase Bidding or Negotiation Phase:
Performance Under Purchase Contracts The Company covenants and agrees for the benefit of the Holders from time to time of the Units that it will duly and punctually perform its obligations under the Purchase Contracts in accordance with the terms of the Purchase Contracts and this Agreement.
Change Orders and Contract Amendments 33.1 The Procuring Entity may at any time order the Supplier through notice in accordance GCC Clause 8, to make changes within the general scope of the Contract in any one or more of the following: a) drawings, designs, or specifications, where Goods to be furnished under the Contract are to be specifically manufactured for the Procuring Entity; b) the method of shipment or packing; c) the place of delivery; and d) the Related Services to be provided by the Supplier. 33.2 If any such change causes an increase or decrease in the cost of, or the time required for, the Supplier's performance of any provisions under the Contract, an equitable adjustment shall be made in the Contract Price or in the Delivery/Completion Schedule, or both, and the Contract shall accordingly be amended. Any claims by the Supplier for adjustment under this Clause must be asserted within twenty-eight (28) days from the date of the Supplier's receipt of the Procuring Entity's change order. 33.3 Prices to be charged by the Supplier for any Related Services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the Supplier for similar services.
MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.
Contract Task Order A- E shall be assigned work via a task order by COUNTY which shall subsequently be referred to as the “Contract Task Order” (hereinafter “CTO”). A CTO for each project shall be developed by A-E in conjunction with COUNTY Project Management staff. The County Project Manager shall manage all A-E’s work including monitoring the CTO work schedule, quality of deliverables, review of invoiced amounts, adherence to set budget, and internal review of submittal packages. A-E shall follow all requirements as outlined in the CTO; this general Scope of Work, the project specific Scope Statement, and the Architect-Engineer Guide (Rev July 2018). The CTO shall include a detailed Scope Statement, describing tasks to be performed with a specific list of deliverables for each task, schedule of work and cost to complete the work. The schedule of work shall allow enough time for meetings with County Management staff to review the work progress, provide technical and policy direction, resolve problems and ensure adherence to the work completion schedule. The CTO shall include a cover sheet provided by County Project Management staff with the appropriate signature blocks and contract information. Once both Parties agree, and all Parties have signed the CTO, County Management staff shall provide A-E with a Notice to Proceed (NTP) to begin work. A-E shall submit all plans, reports and other documents produced under the CTO to the assigned County Project Manager within the timeframe indicated in the CTO or as directed by County Project Management staff.
Purchase Order Duration Purchase orders issued pursuant to this State Term Contract must be received by the Contractor no later than close of business on the last day of the Contract’s term to be considered timely. The Contractor is obliged to fill those orders in accordance with the Contract’s terms and conditions. Purchase orders received by the Contractor after close of business on the last day of the State Term Contract’s term shall be considered void. Purchase orders for a one-time performance of contractual services shall be valid through the performance by the Contractor, and all terms and conditions of the State Term Contract shall apply to the single delivery/performance, and shall survive the termination of the Contract. Contractors are required to accept purchase orders specifying delivery schedules exceeding the contracted schedule even when such extended delivery will occur after expiration of the State Term Contract. For example, if a state term contract calls for delivery 30 days after receipt of order (ARO), and an order specifies delivery will occur both in excess of 30 days ARO and after expiration of the state term contract, the Contractor will accept the order. However, if the Contractor expressly and in writing notifies the ordering office within ten (10) calendar days of receipt of the purchase order that Contractor will not accept the extended delivery terms beyond the expiration of the state term contract, then the purchase order will either be amended in writing by the ordering entity within ten (10) calendar days of receipt of the contractor’s notice to reflect the state term contract delivery schedule, or it shall be considered withdrawn. The duration of purchase orders for recurring deliveries of commodities or performance of services shall not exceed the expiration of the State Term Contract by more than twelve months. However, if an extended pricing plan offered in the State Term Contract is selected by the Customer, the Contract terms on pricing plans shall govern the maximum duration of purchase orders reflecting such pricing plans. Timely purchase orders shall be valid through their specified term and performance by the Contractor, and all terms and conditions of the State Term Contract shall apply to the recurring delivery/performance as provided herein, and shall survive the termination of the Contract. Ordering offices shall not renew a purchase order issued pursuant to a State Term Contract if the underlying contract expires prior to the effective date of the renewal.