Air-to-Ground Sample Clauses

Air-to-Ground. Ground-to-Air and Point-to-Point Failure – Piarco ACC: 3.5.3.1 In the event that Piarco ACC experiences Ground to Air and Point-to-Point Failure the relevant E/CAR Contingency procedures contained in the section on COM FAILURE: Piarco ACC – Air-to-Ground/Ground to Air and Point to Point shall be implemented. See Attachment
AutoNDA by SimpleDocs

Related to Air-to-Ground

  • Access to NID 2.7.3.1 NewPhone may access the customer’s premises wiring by any of the following means and NewPhone shall not disturb the existing form of electrical protection and shall maintain the physical integrity of the NID: 2.7.3.1.1 BellSouth shall allow NewPhone to connect its Loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premises; 2.7.3.1.2 Where an adequate length of the customer’s premises wiring is present and environmental conditions permit, either Party may remove the customer premises wiring from the other Party’s NID and connect such wiring to that Party’s own NID; 2.7.3.1.3 Either Party may enter the subscriber access chamber or dual chamber NID enclosures for the purpose of extending a cross-connect or spliced jumper wire from the customer premises wiring through a suitable “punch-out” hole of such NID enclosures; or 2.7.3.1.4 NewPhone may request BellSouth to make other rearrangements to the customer premises wiring terminations or terminal enclosure on a time and materials cost basis. 2.7.3.2 In no case shall either Party remove or disconnect the other Party’s loop facilities from either Party’s NIDs, enclosures, or protectors unless the applicable Commission has expressly permitted the same and the disconnecting Party provides prior notice to the other Party. In such cases, it shall be the responsibility of the Party disconnecting loop facilities to leave undisturbed the existing form of electrical protection and to maintain the physical integrity of the NID. It will be NewPhone’s responsibility to ensure there is no safety hazard, and NewPhone will hold BellSouth harmless for any liability associated with the removal of the BellSouth Loop from the BellSouth NID. Furthermore, it shall be the responsibility of the disconnecting Party, once the other Party’s loop has been disconnected from the NID, to reconnect the disconnected loop to a nationally recognized testing laboratory listed station protector, which has been grounded as per Article 800 of the National Electrical Code. If no spare station protector exists in the NID, the disconnected loop must be appropriately cleared, capped and stored. 2.7.3.3 NewPhone shall not remove or disconnect ground wires from BellSouth’s NIDs, enclosures, or protectors. 2.7.3.4 NewPhone shall not remove or disconnect NID modules, protectors, or terminals from BellSouth’s NID enclosures. 2.7.3.5 Due to the wide variety of NID enclosures and outside plant environments, BellSouth will work with NewPhone to develop specific procedures to establish the most effective means of implementing this section if the procedures set forth herein do not apply to the NID in question.

  • Access to Information Systems Access, if any, to DXC’s Information Systems is granted solely to perform the Services under this Order, and is limited to those specific DXC Information Systems, time periods and personnel as are separately agreed to by DXC and Supplier from time to time. DXC may require Supplier’s employees, subcontractors or agents to sign individual agreements prior to access to DXC’s Information Systems. Use of DXC Information Systems during other time periods or by individuals not authorized by DXC is expressly prohibited. Access is subject to DXC business control and information protection policies, standards and guidelines as may be modified from time to time. Use of any other DXC Information Systems is expressly prohibited. This prohibition applies even when an DXC Information System that Supplier is authorized to access, serves as a gateway to other Information Systems outside Supplier’s scope of authorization. Supplier agrees to access Information Systems only from specific locations approved for access by DXC. For access outside of DXC premises, DXC will designate the specific network connections to be used to access Information Systems.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Access to Data Operator shall make Data in the possession of the Operator available to the LEA within five (5) business days of a request by the LEA.

  • ACCESS TO SECURITY LOGS AND REPORTS Upon request, the Contractor shall provide access to security logs and reports to the State or Authorized User in a format as specified in the Authorized User Agreement.

  • Engineer Resources The Engineer shall furnish and maintain quarters for the performance of all services, in addition to providing adequate and sufficient personnel and equipment to perform the services required under the contract. The Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the services required under this contract, or it will be able to obtain such personnel from sources other than the State.

  • Fitness Center Subject to the provisions of this Section, so long as Tenant is not in Default under this Lease, and provided Tenant’s employees execute a standard waiver of liability form used at the Fitness Center (hereinafter defined) and pay the applicable one time or monthly fee, then Tenant’s employees (the “Fitness Center Users”) shall be entitled to use the KINETIC fitness center (the “Fitness Center”) in the building located at 600 Xxxxxxx Xxxxxx Xxxxx, Xxxxxxx Xxxxx, Xxxxxxxxxx. The use of the Fitness Center shall be subject to the rules and regulations (including rules regarding hours of use) established from time to time by the Fitness Center operator. Landlord and Tenant acknowledge that the use of the Fitness Center by the Fitness Center Users shall be at their own risk. Tenant acknowledges that the provisions of this Section shall not be deemed to be a representation by Landlord that the Fitness Center (or any other fitness facility) shall be continuously operated and maintained throughout the Term of this Lease, and no termination of Tenant’s or the Fitness Center Users’ rights to the Fitness Center shall entitle Tenant to an abatement or reduction in Basic Rent, constitute a constructive eviction, or result in an event of default by Landlord under this Lease. Tenant hereby voluntarily releases, discharges, waives and relinquishes any and all actions or causes of action for personal injury or property damage occurring to Tenant or its employees or agents arising as a result of the use of the Fitness Center, or any activities incidental thereto, wherever or however the same may occur, and further agrees that Tenant will not prosecute any claim for personal injury or property damage against Landlord or any of its officers, agents, servants or employees for any said causes of action. It is the intention of Tenant with respect to the Fitness Center to exempt and relieve Landlord from liability for personal injury or property damage caused by negligence. Tenant’s rights hereunder to permit its employees to use the Fitness Center shall belong solely to Tenant and may not be transferred or assigned without Landlord’s prior written consent, which may be withheld by Landlord in Landlord’s sole discretion.

  • Access to Site 3.05.1 Contractor may enter and leave the premises at all reasonable times without charge. Contractor and its employees may use the common areas and roadways of the premises where it is to perform the services together with all facilities, equipment, improvements, and services provided in connection with the premises for common use. This excludes parking for Contractor’s personnel. Contractor shall repair any damage caused by it or its employees as a result of its use of the common areas.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Air Quality To the extent applicable, Consultant must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Consultant shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Consultant shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom Consultant is responsible under its indemnity obligations provided for in this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!