Analytical Report 1 “The Russia S&T system Sample Clauses

Analytical Report 1 “The Russia S&T system. (month 4)
AutoNDA by SimpleDocs

Related to Analytical Report 1 “The Russia S&T system

  • Technical Reports deliver to the Agent, and shall procure that the Manager shall deliver to the Agent, on request copies of the latest complete technical reports in respect of the Vessels.

  • MEDICAL REPORT The Agency/Department Head as a condition of granting sick leave with pay, may require medical evidence of sickness or injury acceptable to the Agency/Department. The acceptable medical evidence must be obtained from a medical practitioner currently treating the employee or the employee’s family member.

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Medical Reports The following applies to all employees: The Employer agrees to pay the fee for medical reports required by the Employer for Sick Leave or Weekly Indemnity provisions to a maximum of fifty dollars ($50.00).

  • Technical Requirements for SCPs/Databases 10.5.3.1 BellSouth shall provide physical access to SCPs through the SS7 network and protocols with TCAP as the application layer protocol.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Technical Regulations 1. The rights and obligations of the Parties in respect of technical regulations, standards and conformity assessment shall be governed by the WTO Agreement on Technical Barriers to Trade.

  • Implementation Report Within 150 days after the Effective Date, Extendicare shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include:

  • Statistical Analysis 31 F-tests and t-tests will be used to analyze OV and Quality Acceptance data. The F-test is a 32 comparison of variances to determine if the OV and Quality Acceptance population variances 33 are equal. The t-test is a comparison of means to determine if the OV and Quality Acceptance 34 population means are equal. In addition to these two types of analyses, independent verification 35 and observation verification will also be used to validate the Quality Acceptance test results.

Time is Money Join Law Insider Premium to draft better contracts faster.