The Design Builder shall indemnify the Owner for the cost and expense the Owner incurs (1) for remediation of a material or substance the Design-Builder brings to the site and negligently handles, or (2) where the Design-Builder fails to perform its obligations under Section 10.3.1, except to the extent that the cost and expense are due to the Owner’s fault or negligence.
No Process or Design Changes Supplier shall not make any process or design changes affecting Products or Services without DXC’s prior written consent.
Filing Designation The City Department Director will designate each individual who will be providing services to the City pursuant to the Agreement as full disclosure, limited disclosure, or excluded from disclosure, based on an analysis of the services the Consultant will provide. Notwithstanding this designation or anything in the Agreement, the Consultant is ultimately responsible for complying with FPPC regulations and filing requirements. If you have any questions regarding filing requirements, please do not hesitate to contact the City Clerk at (000)000-0000, or the FPPC at 0-000-XXX-XXXX, or (000) 000-0000 *2. Pursuant to the duly adopted City of Chula Vista Conflict of Interest Code, this document shall serve as the written determination of the consultant’s requirement to comply with the disclosure requirements set forth in the Code.
Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
Study Design This includes a discussion of the evaluation design employed including research questions and hypotheses; type of study design; impacted populations and stakeholders; data sources; and data collection; analysis techniques, including controls or adjustments for differences in comparison groups, controls for other interventions in the State and any sensitivity analyses, and limitations of the study.
If Designated If the HSP is Designated it will:
Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point.