Austin Energy Transmission Sample Clauses

Austin Energy Transmission. Lines Relocation TxDOT will enter into an agreement with Austin Energy for the relocation of the Austin Energy Transmission Lines, and DB Contractor is not responsible for preparing or entering into any agreements with Austin Energy for the relocation of the Austin Energy Transmission Lines. TxDOT will cause Austin Energy to relocate the Austin Energy Transmission Lines as shown in the RID entitled “OHP- Transmission Tower Relocation Plans.” Except as provided in Section 6.4.5, DB Contractor shall not be entitled to any Price increase or time extension for any additional costs or delays, respectively, attributable to the relocation of the Austin Energy Transmission Lines. In the event the Austin Energy Transmission Lines must be relocated in a manner that is different from that set forth in the RID entitled “OHP- Transmission Tower Relocation Plans” due to the Final Design, DB Contractor shall be solely responsible for all cost impacts and schedule impacts to the Work and for all of Austin Energy’s costs caused by the changes in the relocation of the Austin Energy Transmissions Lines
AutoNDA by SimpleDocs
Austin Energy Transmission. Lines Relocation TxDOT will enter into the Austin Energy Agreement with Austin Energy and DB Contractor is not responsible for preparing or entering into any agreements with Austin Energy for the relocation of the Austin Energy Transmission Lines. A draft of the Austin Energy Agreement is included in the RIDs as “Austin Energy Utility Agreement (Draft)”. In the event changes in the final, executed Austin Energy Agreement from the draft Austin Energy Agreement included in the RIDs include terms and conditions resulting in a material change to DB Contractor’s obligations, DB Contractor shall be entitled to a Change Order to the extent set forth in Section 6.2 and Section 4.6.9.3.2(j) of the General Conditions. TxDOT will cause Austin Energy to relocate the Austin Energy Transmission Lines as shown in Attachment A of the draft Austin Energy Agreement included in the RIDs. Except as provided in Section 6.2 and Section 6.4.5, DB Contractor shall not be entitled to any Price increase or time extension for any additional costs or delays, respectively, attributable to the relocation of the Austin Energy Transmission Lines. Except as provided in Section 6.2 and Section 6.4.5, in the event the Austin Energy Transmission Lines must be relocated in a manner that is different from that set forth in Attachment A of the draft Austin Energy Agreement included in the RIDs, DB Contractor shall be solely responsible for all cost impacts and schedule impacts to the Work and for all of Austin Energy’s costs caused by the changes in the relocation of the Austin Energy Transmissions Lines.

Related to Austin Energy Transmission

  • Transmission The Custodian and the Fund shall comply with SWIFT’s authentication procedures. The Custodian will act on FT Instructions received via SWIFT provided the instruction is authenticated by the SWIFT system. § Written Instructions. Instructions may be transmitted in an original writing that bears the manual signature of an Authorized Person(s).

  • Transmission encryption All data transmissions of County PHI or PI outside the secure internal network must be encrypted using a FIPS 140-2 certified algorithm which is 128bit or higher, such as AES. Encryption can be end to end at the network level, or the data files containing PHI can be encrypted. This requirement pertains to any type of PHI or PI in motion such as website access, file transfer, and E-Mail.

Time is Money Join Law Insider Premium to draft better contracts faster.