Auxiliary Power Supply Sample Clauses

Auxiliary Power Supply. Power supply for a mud logging unit yes/no: Yes Power supply available: 480 Output volts 480 Frequency 60 Current 100 Phase single/three: 3
AutoNDA by SimpleDocs
Auxiliary Power Supply. Subject to Subparagraph 46.5, Landlord hereby grants to Tenant the right to install, replace, maintain and upgrade, at Tenant's sole cost and expense, one or more auxiliary electric generators together with one or more above ground fuel storage tanks for the same (collectively, the "Auxiliary Power Supply") at a location or locations on the Premises (excluding the roof) as reasonably designated by Tenant and approved by Landlord, which approval shall not be unreasonably withheld or delayed. The Auxiliary Power Supply is and shall remain the property of Tenant or Tenant's assignee, and may be removed by Tenant at any time or times.
Auxiliary Power Supply. Auxiliary equipment to be supplied against this specification shall be suitable for for operation on the following supply: 16.1 AC Motors rated 200 kW and above : 6.6 kV, 3 ϕ, 3 wire, AC Supply (Medium resistance earthed) 16.2 AC Motors below 200 kW and other LT loads : 415 V, 3 ϕ, 3 wire, AC Supply (Effectively earthed) 16.3 Plant lighting, utility power : 240 V, 1 ϕ, AC Supply (Effectively sockets, space heating of panels earthed) and space heating of motors > 30 kW 16.4 Control Circuit of local panels : 110 V, 1 ϕ, AC Supply System (Derived (like compressor control, crane from 415/110V step down control etc.) and 415 V transformer) switchgear outgoing feeder modules controls. YCCPP-SUPPLY CONTRACT KARNATAKA POWER CORPORATION LIMITED 1x370 MW-YELAHANKA COMBINED CYCLE POWER PLANT SECTION: A VOLUME-II Page 3 of 11
Auxiliary Power Supply. Power supply for a mud logging unit yes/no: YES Power supply available: Output volts volts: 480 Frequency Hz: 60 Current amps: 100 Phase single/three THREE C.1.8 COMPRESSED AIR SYSTEMS

Related to Auxiliary Power Supply

  • Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • All-Requirements Power Supply The service under which the Competitive Supplier provides all of the electrical energy, capacity, reserves, and ancillary services, transmission services, transmission and distribution losses, congestion management, and other such services or products necessary to provide firm power supply to Participating Consumers at the Point of Delivery.

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Gas Contracts No Credit Party, as of the date hereof or as disclosed to the Administrative Agent in writing, (a) is obligated in any material respect by virtue of any prepayment made under any contract containing a “take-or-pay” or “prepayment” provision or under any similar agreement to deliver Hydrocarbons produced from or allocated to any of the Borrower’s and its Subsidiaries’ Oil and Gas Properties at some future date without receiving full payment therefor at the time of delivery or (b) except as has been disclosed to the Administrative Agent, has produced gas, in any material amount, subject to balancing rights of third parties or subject to balancing duties under Legal Requirements.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!