Backfilling – Structures. The excavation for thrust blocks and other structures shall be refilled with such of the excavated materials and in such order as may from time to time be directed by the District. Whenever the excavated materials are unsuitable, the Contractor shall furnish suitable backfill materials. This material shall be a uniformly graded bankrun gravel having no stones larger than 6 inches. The backfill around structures must be carefully placed in layers not to exceed 8” and tamped and brought up evenly around all sides of the structure. The material shall be thoroughly tamped with mechanical or vibratory compactors and water added, if necessary, to obtain 90 percent laboratory density as determined by the Standard Method of Test for Compaction and Density of Soils AASHO Designation T-99. Backfilling around pipes outside the structures shall be in accordance with the pipe laying specifications.
AutoNDA by SimpleDocs

Related to Backfilling – Structures

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • PRICING STRUCTURES Licenses and Support Services for the Licensed Programs to which this OST applies are granted according to the pricing structures mentioned in the related Transaction Document. Standard pricing structures are defined in the section “DEFINITIONS” of this OST, even though those pricing structures may not be applicable to the DS Offerings to which this OST applies. Other pricing structures may be made available on a case-by-case basis.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.