Barge and Vessel Weighing Sample Clauses

Barge and Vessel Weighing. Shipments delivered by Barge(s) or vessel(s) shall be weighed at Seller’s expense as determined by a certified belt scale (such certification to be not older than six (6) months from the date of loading) or if not available by draft survey taken at the Delivery Point prior to the departure of the Barge(s) or vessel(s) from the Delivery Point at Seller’s expense. The weights thereby determined (absent manifest error) will be the basis on which invoices will be rendered and payments made hereunder. All such draft surveys at the Delivery Point shall be conducted by an independent surveyor (certified commercial marine surveyor for vessels) experienced in the conduct of draft surveys selected by mutual agreement of the Parties, or failing agreement, by Seller.
AutoNDA by SimpleDocs
Barge and Vessel Weighing. Shipments delivered by barge(s) or vessel(s) shall be weighed at Seller’s expense as determined by draft survey taken prior to the departure of the barge(s) or vessel(s) from the Delivery Point and the weights thereby determined (absent manifest error) will be the basis on which invoices will be rendered and payments made hereunder. All such draft surveys shall be conducted by an independent certified commercial marine surveyor experienced in the conduct of draft surveys selected by Seller unless otherwise stated in the relevant Confirmation.

Related to Barge and Vessel Weighing

  • Vessels Each Vessel is

  • Aircraft This peril includes self-propelled missiles and spacecraft.

  • SHIPPING AND SHIPPING COSTS All delivered Equipment and Products must be properly packaged. Damaged Equipment and Products may be rejected. If the damage is not readily apparent at the time of delivery, Supplier must permit the Equipment and Products to be returned within a reasonable time at no cost to Sourcewell or its Participating Entities. Participating Entities reserve the right to inspect the Equipment and Products at a reasonable time after delivery where circumstances or conditions prevent effective inspection of the Equipment and Products at the time of delivery. In the event of the delivery of nonconforming Equipment and Products, the Participating Entity will notify the Supplier as soon as possible and the Supplier will replace nonconforming Equipment and Products with conforming Equipment and Products that are acceptable to the Participating Entity. Supplier must arrange for and pay for the return shipment on Equipment and Products that arrive in a defective or inoperable condition. Sourcewell may declare the Supplier in breach of this Contract if the Supplier intentionally delivers substandard or inferior Equipment or Products.

  • PACKING AND SHIPPING a. Seller shall pack the goods and materials to prevent damage and deterioration. Unless otherwise set forth in this Contract, Seller shall package the goods in accordance with the requirements of Boeing Document D37522-6 “Supplier Packaging”. Buyer may charge Seller for damage to or deterioration of any goods resulting from improper packing or packaging.

  • Packaging and Shipping 3.1 Seller shall properly xxxx, xxxx, ship and route the Products in accordance with the requirements of Timken and the carriers and in accordance with all applicable laws and regulations, or if there are no stated requirements, in accordance with best commercial practices designed to prevent loss or damage due to weather, transportation and other causes.

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.

  • PACKING AND SHIPMENT (a) Unless otherwise specified, all Work is to be packed in accordance with good commercial practice.

  • Cargo THE CARRIER shall not be liable for damages provided it proves that the destruction, loss or damage resulted from one of the following:

  • Weighing 6.1. In order to calculate the quantity of Grain delivered to a Port Terminal Facility:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

Time is Money Join Law Insider Premium to draft better contracts faster.