Basin Gravel Sample Clauses

Basin Gravel. The Basin gravel includes that which is presently commingled with the Waste Material or which may become commingled during excavation. The PVC boring study described above, showed that this commingled zone is up to 10" in depth. it is expected that the commingled layer will be excavated with the Waste Material. The major portion of the sub-Basin gravel is the 26" depth which lies below the 10" commingled layer. This layer is virtually free of visible Waste Material but does contain sufficient quantity of uranium, copper and nitrates that shall be removed. Other gravel which probably will be necessary to be excavated is that which might slump off during excavation along the steep side of the submerged "sand bar" toward the south of The Basin. Still another portion of the gravel that shall be excavated is that which had been placed on top of the Waste Material along a major portion of The Basin's perimeter to create a uniform elevation to install and anchor the Hypalon cover. It is expected that the majority of this overfill can be removed as "clean" gravel. Other similar gravel had been placed on top of the Waste Material as a peninsular on the north end at one point in time.
AutoNDA by SimpleDocs

Related to Basin Gravel

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • WATERBEDS The Tenant: (check one)

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • BUYER'S FACILITIES 1. Buyer will maintain at its own expense facilities from the delivery point to the point of use and the burners and equipment for using gas, and Buyer will at all times keep gas-using equipment on said premises in a condition conforming with such reasonable rules and regulations as may be prescribed therefore by regulatory authority having jurisdiction thereover and with the requirements of any valid law thereto appertaining. In the event that rules are not prescribed by a regulatory authority, Buyer will abide by codes as used in the gas industry. 2. Seller shall not approve sale of gas on an interruptible basis to Buyer until and unless Seller is satisfied that Buyer has, or will, install adequate stand-by facilities to meet its full fuel requirements during periods of sustained interruptions. 3. Seller shall not approve sales of gas to Buyer unless Seller is satisfied that Buyer has not, or will not interconnect downstream fuel piping of natural gas for use in different priority-of• service categories.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!