Beyond the classical calculations Sample Clauses

Beyond the classical calculations. ‌ Molecular dynamics at the classical and first-principles levels have been introduced and both of these approaches are used widely targeting different domains of problems. With DFT accuracy, the behaviour of materials can be understood and predicted reliably from the interaction due to the electrons, while the classical approaches extends the simulation scale enormously and practically narrows the gap between theoretical description and experimental observations. However, both approaches have limitations when it comes to multi-scale simulations. The classical potentials are less suited to use in new chemical environments beyond the fitting properties and the first-principles methods have limited applicability typically due to its O(N 3) scaling factor, arising from the need to keep wavefunctions orthogonal in the iterative numerical procedures. Linear scaling DFT was recently developed and can accelerate the DFT calculations, but also has limited applications [52, 53]. Beyond the classical description, methodologies such as QM/MM [11], ‘learn-on-the-fly’ (LOTF) MD [12, 54], have been developed and successfully employed into the multi-scale simulations, for instance, to model the fracture, defects or dislocations, to be reviewed in the following sections.
AutoNDA by SimpleDocs

Related to Beyond the classical calculations

  • FURNITURE CLASSIFICATIONS Furniture classifications include but not limited to: Cafeteria, Dormitory, Library Shelving and Library Related, Lounge, Systems (Modular), School (Classroom), Freestanding, Seating, Filing Systems and Equipment, and Technology Support.

  • Drawings Submitted During the Contract Term Where required to develop maintain and deliver diagrams or other technical schematics regarding the scope of work, Contractor shall do so on an ongoing basis at no additional charge, and must, as a condition of payment, update drawings and plans during the Contract term to reflect additions, alterations, and deletions. Such drawings and diagrams shall be delivered to the Authorized User’s representative.

  • New or Revised Classifications The Employer shall provide at least twenty-five (25) days' notice and will meet and confer with the Union over any new or revised classification specification, if requested by the Union. The Union may propose alternatives to the Employer proposed changes during the twenty-five day period. The Employer shall negotiate with the Union on other classification issues as required by State personnel law.

  • Additional Wet Weather Procedure 14.15.1 Remaining On Site Where, because of wet weather, the employees are prevented from working:

  • ACCURACY OF CUSTOMER’S PLANS AND MEASUREMENTS a) The Company is entitled to rely on the accuracy of any plans, specifications and other information provided by the Customer. The Customer acknowledges and agrees that in the event that any of this information provided by the Customer is inaccurate the Company accepts no responsibility for any loss, damages or costs howsoever resulting from these inaccurate plans, specifications or other information.

  • New Classifications If a new classification is created within the bargaining unit, the Employer agrees to meet with the Union and negotiate a rate of pay for this new classification. If the parties cannot reach agreement, at the request of either party, the matter shall be submitted to the arbitration procedure in Article 26 of this Agreement.

  • Contract Consistency With Other Laws The contract shall govern if State and local environmental quality laws conflict with or preclude performance of contractual requirements.

  • of the CAISO Tariff The CAISO reserves the right to establish reasonable minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Interconnection Customer shall immediately notify the CAISO and the Participating TO and restore the Power System Stabilizers to operation as soon as possible. The CAISO shall have the right to order the reduction in output or disconnection of the Large Generating Facility if the reliability of the CAISO Controlled Grid would be adversely affected as a result of improperly tuned Power System Stabilizers. The requirements of this Article 5.4 shall apply to Asynchronous Generating Facilities in accordance with Appendix H.

  • DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

  • COSTS DISTRIBUTED THROUGH COUNTYWIDE COST ALLOCATIONS The indirect overhead and support service costs listed in the Summary Schedule (attached) are formally approved as actual costs for fiscal year 2020-21, and as estimated costs for fiscal year 2022-23 on a “fixed with carry-forward” basis. These costs may be included as part of the county departments’ costs indicated effective July 1, 2022, for further allocation to federal grants and contracts performed by the respective county departments.

Time is Money Join Law Insider Premium to draft better contracts faster.