Bid Documents The terms and conditions of the Invitation to Bid attached hereto and made a part hereof as Exhibit "B" shall be incorporated herein as a part of this Agreement.
REVIEW OF CONTRACT DOCUMENTS 4.2.1 The Contractor shall carefully study and compare the Contract Documents and shall immediately report in writing to the Architect and the State any error, inconsistency or omission he may discover. The Contractor shall not be liable to the State or the Architect for any damage resulting from any such errors, inconsistencies or omissions in the Contract Documents. The
Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall demonstrate and provide written assurance to Owner that all conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.
Licensed Documentation If commercially available, Licensee shall have the option to require the Contractor to deliver, at Contractor’s expense: (i) one (1) hard copy and one (1) master electronic copy of the Documentation in a mutually agreeable format; (ii) based on hard copy instructions for access by downloading from the Internet
ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.
Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager: 1. City/State Approved Drawings (1) Original set 2. Bid Set Drawings (1) Set BOND PAPER (marked as “ORIGINAL”) (1) Set electronic file (DWG & PDF) 3. Project Manual (1) Set hard copy & Detail Manual (1) Set electronic file
End User Agreement This publication is distributed under the terms of Article 25fa of the Dutch Copyright Act. This article entitles the maker of a short scientific work funded either wholly or partially by Dutch public funds to make that work publicly available for no consideration following a reasonable period of time after the work was first published, provided that clear reference is made to the source of the first publication of the work. Research outputs of researchers employed by Dutch Universities that comply with the legal requirements of Article 25fa of the Dutch Copyright Act, are distributed online and free of cost or other barriers in institutional repositories. Research outputs are distributed six months after their first online publication in the original published version and with proper attribution to the source of the original publication. You are permitted to download and use the publication for personal purposes. All rights remain with the author(s) and/or copyrights owner(s) of this work. Any use of the publication other than authorised under this licence or copyright law is prohibited. If you believe that digital publication of certain material infringes any of your rights or (privacy) interests, please let the University Library know, stating your reasons. In case of a legitimate complaint, the University Library will, as a precaution, make the material inaccessible and/or remove it from the website. Please contact the University Library through email: xxxxxxxxx@xxx.xx.xx. You will be contacted as soon as possible. University Library Radboud University
Forecasts and Purchase Orders (a) Following Regulatory Approval of one of the Initial Products during the term of this Agreement, Reliant shall provide to ASL no later than the first day of the first month of each calendar quarter a non-binding good faith estimate (“Quarterly Forecast”) by quarter of Reliant’s requirements for the Active Ingredient for the calendar quarter and the succeeding three (3) calendar quarters. Reliant will be obligated to purchase 75% of the quantities of API forecasted for the first two (2) succeeding calendar quarters of each Quarterly Forecast. Within (30) days of Regulatory Approval, Reliant shall provide an initial forecast (“Initial Forecast”) for the four calendar quarters following Regulatory Approval. (b) Reliant shall place binding purchase orders for Active Ingredient by written or electronic purchase order (or by any other means agreed to by the parties) to ASL, which shall be placed at least ninety (90) days prior to desired date of delivery. (c) ASL shall be obligated to supply Active Ingredient as ordered by Reliant. To the extent purchase orders in any calendar month exceed One Hundred Fifty percent (150%) of the Quarterly Forecast for the relevant quarter, ASL shall use its best efforts to supply 125% of the quantity ordered. (d) ASL shall maintain minimum inventory levels equal to the binding portion of the then current Quarterly Forecast. The Active Ingredient shall be shipped C.I.F. Duty Unpaid to a Designated Facility or other location agreed by the parties. Active Ingredient shall be shipped upon completion of production in temperature-controlled vehicles in accordance with the specifications including light protecting containers and the Quality Agreement in order to maintain the quality of the Active Ingredient. Carriers selected by ASL must be commercially reputable, able to track shipments and fully insured with adequate coverage to replace the value of the goods shipped. Title and risk of loss pass on delivery to the Designated Facility. (e) All shipments of Active Ingredient shall be accompanied by a packing slip and a certificate of analysis which describes the Active Ingredient, states the purchase order number, confirms that the Active Ingredient conforms in all ways with the Specifications, the Process Description and was manufactured in accordance with GMP and all other requirements of the Act. To the extent of any conflict or inconsistency between this Agreement and any purchase order, purchase order release, confirmation, acceptance or any similar document, the terms of this Agreement shall govern. (f) Reliant shall notify ASL of any short-shipment claims within thirty (30) days of receipt of a shipment of Active Ingredient. (g) ASL shall not be obligated to accept any returns of Active Ingredient other than as a result of such Active Ingredient failing to meet the Specifications in accordance with Section 2.9(a), was not manufactured in accordance with GMP, or does not otherwise comply with the manufacturing, storage and/or transportation requirements of the Act.
MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.
INTEGRATED DOCUMENTS Any separate sheet of paper labeled "Additional Disclosure - Federal Truth-In-Lending Act," which is delivered together with this Agreement or at a later date becomes an integrated part of this Agreement and Disclosure.