Common use of BILL NO Clause in Contracts

BILL NO. 9 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page No 88 89 R Amount

Appears in 1 contract

Samples: Building Agreement

AutoNDA by SimpleDocs

BILL NO. 9 TILING 2 WATERPROOFING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed Waterproofing Waterproofing of roofs, basements, etc. shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with adhesive to plaster (plaster elsewhere)" descriptions necessary ridges, hips and valleys. Descriptions of tiling on brick sheet or concrete walls, columns, etc membrane waterproofing shall be deemed to include 1:4 cement plaster backing additional labour to turn-ups and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding turn-downs. Quantity 12 2 Rate R Amount WALL TILING Allow SLAB WATERPROOFING The Contractor shall allow in his rates for testing the waterproofing for water tightness by ponding the waterproofed surfaces for a Prime Cost Amount period of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Wallsat least 48 hours before application of a protective layer. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 2 Waterproofing 1 2 3 4 5 Allow 4mm Thick "Derbigum SP" fully bonded waterproofing guaranteed to remain watertight for a Prime Cost Amount period of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound ten years on: FloorsConcrete slab, beams and sides of parapets including dressing into outlets, turn-ups, etc. m2 Narrow widthsFlashing strip 300mm girth at turn-ups including sealing top edge into groove with mastic. m PROTECTIVE PAINT Prepare and apply two coats bituminous aluminium paint on: Waterproofing on concrete slab, beams and side of parapets. m2 SUNDRIES Corner protectorsPrepare existing surfaces and spray apply Aquagard 422, dividing stripsor equal approved, etc.clear penetrating waterproof sealant in strict accordance with the manufacturers instructions on: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall cornersExternal facebrick walls and plaster surfaces. m m2 Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 2 Waterproofing 52 32 68 31 R Section No. 2 Bill No. 9 Tiling 2 Waterproofing COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling 2 Waterproofing Page No 88 89 69 70 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 7 PLASTERING (PROVISIONAL) The Tenderer is referred to the relevant Clauses in the separate document "Model Preambles for Trades Trades" (2017 2008 Edition). SCREEDS 1 30mm average thick sand cement screed laid to existing floors, finished with a steel float and prepared to receive vinyl tiles (elsewhere measured). m2 188 GRANOLITHIC Untinted granolithic on existing prepared concrete 2 35mm Thick on floors and walkways m2 36 INTERNAL PLASTER One coat cement plaster steel trowelled on prepared existing brickwork. 3 On walls in isolated positions. m2 123 4 On narrow widths. m2 42 Carried Forward to Summary of Section No. 3 Section No. 3 Bill No. 9 PLASTERING For preambles see "Model Preambles for Trades" (2008 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORKand Supplementary preambles as specified in the Trades Supplementary preambles are incorporated in this schedule of quantities to satisfy the requirements of this project. Such supplementary preambles shall take precedence over the provisions of the said Model Preambles The contractor's prices for all items throughout this schedule of quantities must take account of and include for all of the obligations, WORK IN PATCHES AND WORK IN SMALL QUANTITIESrequirements and specifications given in the said Model Preambles and in any supplementary preambles This bill is measured provisionally and will be subject to re-measure when the work or a portion thereof is complete. SUPPLEMENTARY PREAMBLES It is expected of the contractor to be able to demonstrate how he derived at the quantities and in cases where it is not possible to measure the work on completion due to cover up; the contractor must provide signed off site records proving such claims Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 3 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page No 88 89 R AmountTILING

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 7 PAINTWORK The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as Quantity 23 24 8 Rate R Amount PAINTWORK TO PREVIOUSLY PAINTED WORK PLASTER Clean down, prepare and apply one coat "fixed with adhesive to Plascon" plaster (plaster elsewhere)primer and two coats "Plascon Double Velvet" descriptions of tiling on brick or concrete paint on: Internal plastered walls, columns, etc shall be deemed to include 1:4 cement plaster backing recessed bands, etc. m2 Clean down, prepare and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) apply one coat "Plascon" primer and flush pointed with tinted jointing compond two coats "Plascon Professional Super Matt" paint on: WallsInternal plastered slab soffits. m2 Narrow widthsMETAL Clean down, prepare and apply one coat "Plascon Zinc Phosphate" primer and two coats "Plascon Velvaglo" paint on: Frames and linings. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 7 Paintwork Item No 1 2 SECTION NO. 2 BILL NO. 1 EXTERNAL WORKS Tenderers are advised to study the "Model Preambles for Trades" before pricing this schedule. SUPPLEMENTARY PREAMBLES FENCING Hot dipped galvanised steel high security anti- climbing and anti-cut fence and gates similar to cochrane clearvu formed of 3mm diameter horizontal & vertical galvanised marine fusion bond coated high tensile steel mesh wires with 76,2mm x 12,7mm aperture and reinforced with 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed x 50mm deep V-section horizontal recessed bands with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectorsincluding 85 x 45 x 3mm thick marine fusion bond coated taper posts, dividing stripslocking recess mechanism, UV stabilised polymer end caps, vandal resistant bolts, clamping plates, sealant, etc.. with posts bolted to brick plinth wall or pier (elsewhere measured) in strict accordance with the manufacturer's instructions: "Xxxx M-Trim PRE090" 92400mm High fence with and including 2400mm high white PVC round edge trim fixed with patent adhesive to external wall cornersposts at 3328mm centres. m Single leaf swing gate size overall 1495 x 2325mm high complete with and including frame, additional bracing, pull handles, lock box, heavy duty lock, lockable sliding bolt with keep, etc. No PAVING Carried to Collection Section No. 2 3 Bill No. 9 Tiling 5 1 External Works Quantity 13 1 Rate R Amount 3 Clean down and lay existing concrete and clay pavers from stockpiles, bedded on and including 20mm thick bed of river sand with 1:6 cement grout swept & watered into joints between roadstones: Paving to roads, parking areas, pavements, etc. in patchwork and small quantities to falls including any consequent cutting (circular cutting elsewhere) and tying into existing paving. m2 Carried to Collection Section No. 3 Bill No. 1 External Works 10 R Section No. 2 3 Bill No. 9 Tiling 1 External Works COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 3 Section No. 2 3 Bill No. 9 Tiling 1 External Works Page No 87 88 89 R Amount Item No 1 2 SECTION NO. 3 BILL NO. 2 STORMWATER DRAINAGE, SOIL DRAINAGE & WATER RETICULATION The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. Quantity 1 1 Rate R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING The Tenderer is referred 3 MASONRY NOTE : Unless otherwise stated herein, all items in this bill shall be deemed to the relevant Clauses in the separate document Model Preambles fall into Work Group No. 116 for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. CPAP formula purposes SUPPLEMENTARY PREAMBLES Unless described as BRICKWORK Sizes in descriptions Where sizes in descriptions are given in brick units, "fixed with adhesive one brick" shall represent the length and "half brick" the width of a brick Face bricks Bricks shall be ordered timeously to plaster (plaster elsewhere)" descriptions obtain uniformity in size and colour Pointing Descriptions of tiling on brick or concrete walls, columns, etc recessed pointing to fair face brickwork and face brickwork shall be deemed to include 1:4 cement plaster backing and descriptions square recessed, hollow recessed, weathered pointing, etc. SUPERSTRUCTURE Brickwork of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding NFP bricks in class II mortar 115mm Half brick walls m2 115mm Half brick walls in beamfilling m2 230mm One brick walls m2 Carried Forward Section No. 3 Guard House Bill No. 3 Masonry Quantity 12 2 7 3 46 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush 4 5 6 7 8 9 10 11 Brought Forward Corobrick "Firelight Travertine FBX" Face bricks pointed with tinted jointing compond flush horizontal and vertical joints Extra over for face brick work m2 Brick-on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount -edge header course copings, xxxxx, etc of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush clay face bricks pointed with tinted waterproof jointing compound recessed joints on all exposed faces Brickwork for brick-on: Floors. m2 Narrow widths. m2 -edge header course 150mm wide sill projected at 45 degrees m Brickwork for brick-on-edge header lintel m BRICKWORK SUNDRIES Corner protectorsAir bricks etc 229 x 76mm Clay vermin proof air brick No Brickwork reinforcement 75mm Wide reinforcement built in horizontally m 150mm Wide reinforcement built in horizontally m Prestressed fabricated lintels 110 x 75mm Lintels in lengths not exceeding 3m m Galvanised hoop iron cramps, dividing stripsties, etc.: "Xxxx M-Trim PRE090" 9etc 30 x 1,6mm high white PVC round edge trim Roof tie 1,5m long with one end fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. timber and other end built into brickwork No Carried Forward to Summary of Section No. 2 3 Section No. 2 3 Guard House Bill No. 3 Masonry 48 7 9 Tiling Page No 88 89 2 20 121 20 20 R AmountR

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 10 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 2 15 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page No 88 89 86 87 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 20 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 20 2 20 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page No 88 89 83 84 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 2 WATERPROOFING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed Waterproofing Waterproofing of roofs, basements, etc. shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with adhesive to plaster (plaster elsewhere)" descriptions necessary ridges, hips and valleys. Descriptions of tiling on brick sheet or concrete walls, columns, etc membrane waterproofing shall be deemed to include 1:4 cement plaster backing additional labour to turn-ups and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding turn-downs. Quantity 12 2 Rate R Amount WALL TILING Allow SLAB WATERPROOFING The Contractor shall allow in his rates for testing the waterproofing for water tightness by ponding the waterproofed surfaces for a Prime Cost Amount period of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Wallsat least 48 hours before application of a protective layer. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 2 Waterproofing 1 2 3 4 5 Allow 4mm Thick "Derbigum SP" fully bonded waterproofing guaranteed to remain watertight for a Prime Cost Amount period of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound ten years on: FloorsConcrete slab, beams and sides of parapets including dressing into outlets, turn-ups, etc. m2 Narrow widthsFlashing strip 300mm girth at turn-ups including sealing top edge into groove with mastic. m PROTECTIVE PAINT Prepare and apply two coats bituminous aluminium paint on: Waterproofing on concrete slab, beams and side of parapets. m2 SUNDRIES Corner protectorsPrepare existing surfaces and spray apply Aquagard 422, dividing stripsor equal approved, etc.clear penetrating waterproof sealant in strict accordance with the manufacturers instructions on: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall cornersExternal facebrick walls and plaster surfaces. m m2 Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 2 Waterproofing 2,187 R Section No. 2 Bill No. 9 Tiling 2 Waterproofing COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling 2 Waterproofing Page No 88 89 56 57 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 2 WATERPROOFING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed Waterproofing Waterproofing of roofs, basements, etc. shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with adhesive to plaster (plaster elsewhere)" descriptions necessary ridges, hips and valleys. Descriptions of tiling on brick sheet or concrete walls, columns, etc membrane waterproofing shall be deemed to include 1:4 cement plaster backing additional labour to turn-ups and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding turn-downs. Quantity 12 2 Rate R Amount WALL TILING Allow SLAB WATERPROOFING The Contractor shall allow in his rates for testing the waterproofing for water tightness by ponding the waterproofed surfaces for a Prime Cost Amount period of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Wallsat least 48 hours before application of a protective layer. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 2 Waterproofing 1 2 3 4 5 Allow 4mm Thick "Derbigum SP" fully bonded waterproofing guaranteed to remain watertight for a Prime Cost Amount period of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound ten years on: FloorsConcrete slab, beams and sides of parapets including dressing into outlets, turn-ups, etc. m2 Narrow widthsFlashing strip 300mm girth at turn-ups including sealing top edge into groove with mastic. m PROTECTIVE PAINT Prepare and apply two coats bituminous aluminium paint on: Waterproofing on concrete slab, beams and side of parapets. m2 SUNDRIES Corner protectorsPrepare existing surfaces and spray apply Aquagard 422, dividing stripsor equal approved, etc.clear penetrating waterproof sealant in strict accordance with the manufacturers instructions on: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall cornersExternal facebrick walls and plaster surfaces. m m2 Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 2 Waterproofing 555 R Section No. 2 Bill No. 9 Tiling 2 Waterproofing COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling 2 Waterproofing Page No 88 89 57 58 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 7 CEILINGS, PARTITIONS AND ACCESS FLOORING The Tenderer tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive and to plaster (plaster elsewhere)" descriptions the Supplementary Preambles which are incorporated at the front of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions these Bills of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantities Quantity 12 2 475 11 204 63 Rate R Amount WALL TILING Allow a Prime Cost Amount SUSPENDED CEILINGS 600 x 600 x 0.5mm "OWAtecta" flat lay-in metal ceiling tiles with perforation type L2516, including black Soundtex acoustic fleece infill material bonded to tiles with four tegular adges and OWA white powder coated finish laid on OWAconstruct S33 exposed demountable T24 tee suspension system, all installed to manufacturer's specifications. OWAconstruct shadowline W-trim plugged and screwed at 1200mm centres Ceilings suspended not exceeding 1,0 m below soffit of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Wallssteel or timber roof structure. m2 Narrow widths. Extra over ceiling for forming trapdoor 600 x 600mm hinged pressed metal with 38 x 50mm sawn softwood braced framing No "SM25" pre-painted cornices, nailed m 9,5 mm Gypsum plasterboard ceiling suspended by means of the "screw up" system to and including "Xxxx T37S" system suitably spaced and framed to prevent all deflection or sagging, all framed and screwed up, suspended or shot bolted to concrete or brickwork and using boards in long lengths and fixing to studs at 150 mm centres to maintain ceiling board firmly in position, apply Fibatape to all joints and scrimmed and skimmed with 3 - 6 mm "Rhinolite" to entire surface and sanded down to leave a perfectly flush and level ceiling Ceilings suspended not exceeding 1,0 m below concrete soffit m2 FLOOR TILING Carried to Collection Forward Section No. 2 BUILDING WORKS Bill No. 7 CEILINGS AND PARTITIONS 5 6 7 8 9 Tiling 3 4 5 Allow 10 11 12 Brought Forward Shadowline cornice m BULKHEADS Vertical ceilings or bulkhead average 400mm high. m Vertical ceilings or bulkhead average 200mm high. m OFFICE PARTITIONS Gyproc 1 hour fire rated - GypWall SoundBloc Ultrasteel Stud Drywall, consisting of stud and track system with 63,5 x 35mm Xxxx Drywall UltraSTEEL™ studs at 600mm centres friction fitted into head track and floor track with 63mm Isover "Cavitybatt" insulation inserted into cavity of partitioning and clad on both sides with a Prime Cost Amount double layer of R170/m2 for ceramic floor tiles 15mm thick Gyproc SoundBloc board fixed with an approved adhesive on plaster bedding (bedding elsewhere) 25mm and flush pointed 42mm Gyproc RhinoBoard Sharp Point Screws at 220mm centres and resilient bars to one side with tinted waterproof jointing compound on: Floorsall external angles to have Drywall cornerbeads attached and all joints to be covered with RhinoTape and finished with two layers of RhinoGlide applied and lightly sanded down, leaving wall surface prepared for painting, all in accordance with the manufacturer's recommendations. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9Partition 3m high m Extra over partitions for 813 x 2032mm high white PVC round edge trim fixed with patent adhesive doors (Ironmongery elsewhere measured). No Extra over partitions for 1600 x 2032mm high doors (Ironmongery elsewhere measured). No Extra over to external wall corners. m Carried T-section No Extra over to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. corner No Carried Forward to Summary of Section No. 2 Section No. 2 BUILDING WORKS Bill No. 9 Tiling Page No 88 89 7 CEILINGS AND PARTITIONS 46 190 118 14 3 2 6 4 R AmountR

Appears in 1 contract

Samples: Principal Building Agreement

BILL NO. 9 8 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 20 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 8 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 8 Tiling 5 1 10 5 R Section No. 2 Bill No. 9 8 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 8 Tiling Page No 88 89 81 82 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 1 ELECTRICAL INSTALLATION (PROVISIONAL): MODEL PREAMBLES The Tenderer tenderer is referred to the relevant Clauses in the separate document "Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK2008" for supplementary and comprehensive expansion of descriptions, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc appropriate provision for which shall be deemed to include 1:4 cement plaster backing and descriptions have been included in all relevant rates SUPPLEMENTARY PREAMBLES SANS Standards: The following to be installed in strict accordance to the following SANS Standards: · Electrical Installations: SANS 10142 · Lightning Protection: SANS 62305-1:2011 & IEC 62305-1:2010 MISCELLANEOUS 1 Allow for the 12 months guarantee period. Item 2 Allow for labelling of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING all equipment where required Item 3 Allow a Prime Cost Amount for the submission of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Asbuilt drawings Item Carried to Collection Section NoR Item No Quantity Rate Amount LV RETICULATION COPPER CABLES Supply and installation of 1000/600 volts PVC/SWA/PVC ECC copper cables as specified, excluding terminations and cable supports. 2 Bill NoLengths ginen shall be taken as measured lengths to cable run from terminal to terminal and rates quoted shall include for off-cuts and wastage. Note should cables without ECC be utilized the tenderer will supply the additional external earth at no additional cost. 16mm² 4C PVC/SWA/PVC ECC Cable. 4 Supply m 160.00 5 Install m 160.00 CABLE TERMINATION For PVC/SWA/PVC shall include supply anf fitting of the cable gland, neoprene shroud, making-off cables, lugs, and fitting the gland to the board gland plate, switchgear and final connection of cable tails into board or terminal. 16mm² 4C PVC/SWA/PVC ECC Cable. 6 Supply No 2.00 7 Install No 2.00 CABLE MARKER TAPE. 320mm Wide. 8 Supply m 160.00 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. Install m 160.00 Carried to Collection Section NoR No Supply cable route markers, must consist of 150x150x300mm high concrete blocks wit aluminium or other rust free material marked with arrows to indicate cable route. 2 Bill NoCable route markers. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page Supply No 88 89 R Amount10.00

Appears in 1 contract

Samples: Principal Building Agreement

BILL NO. 9 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 20 4 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 4 15 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page No 88 89 83 84 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 8 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 20 4 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 8 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 8 Tiling 15 3 5 1 10 R Section No. 2 Bill No. 9 8 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 8 Tiling Page No 88 89 80 81 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 10 PAINTWORK The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 34 74 Rate R Amount WALL TILING Allow a Prime Cost Amount Item No 1 2 SECTION NO. 2 BILL NO. 1 EXTERNAL WORKS Tenderers are advised to study the "Model Preambles for Trades" before pricing this schedule. SUPPLEMENTARY PREAMBLES FENCING Hot dipped galvanised steel high security anti- climbing and anti-cut fence and gates similar to cochrane clearvu formed of R170/m2 for ceramic tiles fixed 3mm diameter horizontal & vertical galvanised marine fusion bond coated high tensile steel mesh wires with an approved adhesive 76,2mm x 12,7mm aperture and reinforced with 4 x 50mm deep V-section horizontal recessed bands with and including 85 x 45 x 3mm thick marine fusion bond coated taper posts, locking recess mechanism, UV stabilised polymer end caps, vandal resistant bolts, clamping plates, sealant, etc. with posts bolted to plaster brick plinth wall or pier (plaster elsewhereelsewhere measured) in strict accordance with the manufacturer's instructions: 2400mm High fence with and flush pointed including 2400mm high posts at 3328mm centres. m Single leaf swing gate size overall 1495 x 2325mm high complete with tinted jointing compond on: Wallsand including frame, additional bracing, pull handles, lock box, heavy duty lock, lockable sliding bolt with keep, etc. m2 Narrow widths. m2 FLOOR TILING No PAVING Carried to Collection Section No. 2 3 Bill No. 9 Tiling 1 External Works Quantity 75 2 Rate R Amount 3 4 5 Allow a Prime Cost Amount Clean down and lay existing concrete and clay pavers from stockpiles, bedded on and including 20mm thick bed of R170/m2 for ceramic floor tiles fixed river sand with an approved adhesive on plaster bedding 1:6 cement grout swept & watered into joints between roadstones: Paving to roads, parking areas, pavements, etc. in patchwork and small quantities to falls including any consequent cutting (bedding circular cutting elsewhere) and flush pointed with tinted waterproof jointing compound on: Floorstying into existing paving. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 3 Bill No. 9 Tiling 5 1 10 External Works 75 R Section No. 2 3 Bill No. 9 Tiling 1 External Works COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 3 Section No. 2 3 Bill No. 9 Tiling 1 External Works Page No 88 89 91 92 R Amount Item No 1 2 SECTION NO. 3 BILL NO. 2 STORMWATER DRAINAGE, SOIL DRAINAGE & WATER RETICULATION The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. Quantity 4 3 Rate R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORKTEMPORARY BARRIERS, WORK IN PATCHES AND WORK IN SMALL QUANTITIESSCREENS, ETC. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling Temporary barriers, screens, etc., including removal on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling completion: Temporary hoarding 3350mm high on concrete floors etc shall be deemed floor, formed of drywall partition system with 6mm thick gypsum wall board fixed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 one side including all tracks, vertical studs, corners, abuttments, etc. m Extra over ditto for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) single leaf door size overall 1100 x 3350mm high, including all necessary posts, framing, lock, etc. No REMOVAL OF EXISTING WORK Break down and flush pointed with tinted jointing compond onremove brickwork, etc.: WallsHalf brick wall. m2 Narrow widthsTake out and remove doors, windows, etc. m2 FLOOR TILING including thresholds, xxxxx, etc. (building up openings elsewhere): Single door and steel frame unit size overall 813 x 2032mm high from one brick wall. No Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) 1 Alterations 15 16 17 18 19 20 21 22 23 Toilet roll holders, soap dispensers, paper towel dispensers, dustbins, etc. No Take out and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing stripsremove joinery fittings, etc.: "Xxxx M-Trim PRE090" 9Timber sink cupboard 1200 x 600 x 900mm high. No BUILD UP OPENINGS Brickwork in SABS approved NFP bricks in class II mortar in building up opening in: One brick walls. m2 MAKE GOOD FINISHES, ETC. Make good internal granolithic, screed, plaster, etc. to match existing: Floors in patches. m2 Walls in patches. m2 Clean down existing: Deep clean existing tiles. m2 Deep clean existing carpets. m2 Clean down existing glazing. m2 Facebrick Facades: Jet clean existing face brickwork and joints with a high white PVC round edge trim fixed pressure washer, cartaway all debris to a dumping site to be located by the Contractor, including making good all loose and missing mortar, all in accordance with patent adhesive to external wall cornersthe Architect's instructions. m m2 REPAIR WORK AND SERVICING OF EXISTING DOORS AND WINDOWS Carried to Collection Section No. 2 Bill No. 9 Tiling 1 Alterations 5 1 10 2 18 32 207 158 35 504 R 24 Steel Windows: Repair and service existing steel windows, shopfronts and ironmongery including lubricating all components, tightening all loose screws, replacing missing fixtures, realigning opening sections, replacing damaged putty, etc. m2 Carried to Collection Section No. 2 Bill No. 1 Alterations 35 R Section No. 2 Bill No. 9 Tiling 1 Alterations COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling 1 Alterations Page No 88 89 49 50 51 52 53 54 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 8 PAINTWORK The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 39 74 Rate R Amount WALL TILING Allow a Prime Cost Amount Item No 1 2 SECTION NO. 2 BILL NO. 1 EXTERNAL WORKS Tenderers are advised to study the "Model Preambles for Trades" before pricing this schedule. SUPPLEMENTARY PREAMBLES FENCING Hot dipped galvanised steel high security anti- climbing and anti-cut fence and gates similar to cochrane clearvu formed of R170/m2 for ceramic tiles fixed 3mm diameter horizontal & vertical galvanised marine fusion bond coated high tensile steel mesh wires with an approved adhesive 76,2mm x 12,7mm aperture and reinforced with 4 x 50mm deep V-section horizontal recessed bands with and including 85 x 45 x 3mm thick marine fusion bond coated taper posts, locking recess mechanism, UV stabilised polymer end caps, vandal resistant bolts, clamping plates, sealant, etc. with posts bolted to plaster brick plinth wall or pier (plaster elsewhereelsewhere measured) in strict accordance with the manufacturer's instructions: 2400mm High fence with and flush pointed including 2400mm high posts at 3328mm centres. m 3305 x 1870mm High fence panel with tinted jointing compond on: Wallsand including 2 No. m2 Narrow widths1870mm high end posts. m2 FLOOR TILING No PAVING Carried to Collection Section No. 2 3 Bill No. 9 Tiling 1 External Works Quantity 34 2 Rate R Amount 3 4 5 Allow a Prime Cost Amount Clean down and lay existing concrete and clay pavers from stockpiles, bedded on and including 20mm thick bed of R170/m2 for ceramic floor tiles fixed river sand with an approved adhesive on plaster bedding 1:6 cement grout swept & watered into joints between roadstones: Paving to roads, parking areas, pavements, etc. in patchwork and small quantities to falls including any consequent cutting (bedding circular cutting elsewhere) and flush pointed with tinted waterproof jointing compound on: Floorstying into existing paving. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 3 Bill No. 9 Tiling 5 1 10 External Works 34 R Section No. 2 3 Bill No. 9 Tiling 1 External Works COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 3 Section No. 2 3 Bill No. 9 Tiling 1 External Works Page No 88 89 91 92 R Amount Item No 1 2 SECTION NO. 3 BILL NO. 2 STORMWATER DRAINAGE, SOIL DRAINAGE & WATER RETICULATION The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. Quantity 1 1 Rate R Amount

Appears in 1 contract

Samples: Building Agreement

AutoNDA by SimpleDocs

BILL NO. 9 11 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 11 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 11 Tiling 5 1 10 2 15 R Section No. 2 Bill No. 9 11 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 11 Tiling Page No 88 89 95 96 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 2 WATERPROOFING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed Waterproofing Waterproofing of roofs, basements, etc. shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with adhesive to plaster (plaster elsewhere)" descriptions necessary ridges, hips and valleys. Descriptions of tiling on brick sheet or concrete walls, columns, etc membrane waterproofing shall be deemed to include 1:4 cement plaster backing additional labour to turn-ups and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding turn-downs. Quantity 12 2 Rate R Amount WALL TILING Allow SLAB WATERPROOFING The Contractor shall allow in his rates for testing the waterproofing for water tightness by ponding the waterproofed surfaces for a Prime Cost Amount period of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Wallsat least 48 hours before application of a protective layer. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 2 Waterproofing 1 2 3 4 5 Allow 4mm Thick "Derbigum SP" fully bonded waterproofing guaranteed to remain watertight for a Prime Cost Amount period of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound ten years on: FloorsConcrete slab, beams and sides of parapets including dressing into outlets, turn-ups, etc. m2 Narrow widthsFlashing strip 300mm girth at turn-ups including sealing top edge into groove with mastic. m PROTECTIVE PAINT Prepare and apply two coats bituminous aluminium paint on: Waterproofing on concrete slab, beams and side of parapets. m2 SUNDRIES Corner protectorsPrepare existing surfaces and spray apply Aquagard 422, dividing stripsor equal approved, etc.clear penetrating waterproof sealant in strict accordance with the manufacturers instructions on: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall cornersExternal facebrick walls and plaster surfaces. m m2 Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 2 Waterproofing 18 25 18 35 R Section No. 2 Bill No. 9 Tiling 2 Waterproofing COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling 2 Waterproofing Page No 88 89 69 70 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING 6 IRONMONGERY The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 5 5 1 1 1 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170LOCKS "QS6055/1/m2 for ceramic tiles fixed AS/SS" Cylinder latch and dead bolt lock. No "QS4406/QS4409" Thumbturn wc indicator bolt. No LETTERS, NAMEPLATES, ETC. "Union" 152 x 152 x 3mm aluminium plate anodised silver with an approved adhesive to plaster (plaster elsewhere) and flush pointed male pictogram Ref. No. AL5063E- 06ASE10 No "Union" 152 x 152 x 3mm aluminium plate anodised silver with tinted jointing compond on: Wallsfemale pictogram Ref. m2 Narrow widthsNo. m2 FLOOR TILING AL5063E- 06ASE11 No "Union" 152 x 152 x 3mm aluminium plate anodised silver with paraplegic pictogram Ref. No. AL5066E- 06ASE14 No SUNDRIES Carried to Collection Section No. 2 Bill No. 6 Ironmongery 6 7 8 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed 10 11 BATHROOM FITTINGS "Kwakuhle Hygiene" lockable and vandal resistant white powder coated metal roll holder Ref TR3W. No "Kwakuhle Hygiene" ABS construction lockable Roll Control Paper Dispenser with an approved adhesive on plaster bedding viewing window in colour white. No "Kwakuhle Hygiene" stainless steel 950ml vandal and theft resistant Soap Dispenser. No "Costa Lambrianos CLX 2500 (bedding elsewhere) and flush pointed Ref. 59)" stainless steel fully automatic hand dryer with tinted waterproof jointing compound on: Floorsinfrared sensor plugged to wall. m2 Narrow widths. m2 SUNDRIES Corner protectorsNo "Chilli B CL-01052" 20mm Long x 540mm Wide horizontal wall mounted baby changing station with 480mm high foldable lid, dividing stripshigh density polyethylene interior, top shelf, adjustable safety belt, bag hooks, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed . with patent adhesive to external wall cornersa bearing weight of 20kg installed in strict accordance with the manufacturer's instructions. m TOILET BINS Stainless steel Half moon wall mounted bin size 330 x 450 x 180mm. No Carried to Collection Section No. 2 Bill No. 9 Tiling 6 Ironmongery 5 1 10 3 4 3 3 3 R Section No. 2 Bill No. 9 Tiling 6 Ironmongery COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling 6 Ironmongery Page No 88 89 77 78 R Amount Item No 1 SECTION NO. 2 BILL NO. 7 METALWORK Tenderers are advised to study the "Model Preambles for Trades 1999" before accepting and signing for this Schedule. SUPPLEMENTARY PREAMBLES Descriptions Descriptions of bolts shall be deemed to include nuts and washers Descriptions of expansion anchors and bolts an chemical anchors and bolts shall be deemed to include nuts, washers and mortises in brickwork or concrete Metalwork described as "holed for bolts(s)" shall be deemed to exclude the bolts unless otherwise described PRESSED STEEL DOOR FRAMES 1,6mm Thick double rebated frames suitable for half brick walls complete with hoop iron anchors welded to frame, one adjustable stainless steel striking plate suitable for cylinder locks, three rubber shock absorbers in rebate and one pair of 100mm standard heavy duty brass butt hinges welded to frame: Frame for door size 813 x 2032mm high. No STEEL BURGLAR PROOF SCREENS Carried to Collection Section No. 2 Bill No. 7 Metalwork Quantity 2 Rate R Amount 2 Welded mild steel burglar proof screens formed of 40 x 40 x 2.5mm thick angle section framing with mitred and welded corners, the frame filled in with 40 x 6mm flat bars at 105mm centres, built into wall with heavy duty lugs including tack welding nuts and washers Burglar proofing screen size overall 500 x 5000mm high formed with 40 x 40 x 2,5mm equal leg angle framed frame infilled horizontally with and including 40 x 6mm flat bar at 105mm centres. No Carried to Collection Section No. 2 Bill No. 7 Metalwork 15 R Section No. 2 Bill No. 7 Metalwork COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 7 Metalwork Page No 80 81 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 4 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 5 1 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 4 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 4 Tiling 5 3 1 10 R Section No. 2 Bill No. 9 4 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 4 Tiling Page No 88 89 74 75 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 10 TILING The Tenderer is referred to the relevant Clauses Contractor must read each description throughout this bills of quantities in conjunction with and in the separate document context of the obligations, requirements and specifications stated in the descriptions, the Model Preambles for Trades (2017 Edition2008 edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. and any supplementary Preambles to the Model Preambles forming part of these Bills of Quantities No claim arising from brevity of description of items fully described in the said Model Preambles for Trades or Supplementary Preambles to Model Preambles will be granted SUPPLEMENTARY PREAMBLES Descriptions Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for 300 x 200 x 6mm Johnsons Glazed ceramic tiles (White) fixed with an approved adhesive to plastered surfaces (plaster elsewhere) and flush pointed with white waterproof grouting 1 On walls in isolated panels, splashbacks, etc; m2 60 Listello (Allow PC of R 150/m excluding VAT including delivery on site) top strip fixed with adhesive to plastered surfaces (plaster elsewhere) and flush pointed with white waterproof grouting 2 Listello 100mm high m 40 Carried Forward Section No. 2 Bill No. 10 Tiling 150 x 150mm Glazed ceramic wall tiles (Allow PC of R 150/m² excluding VAT including delivery on site) fixed with adhesive to plastered surfaces (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. compound 3 Splashbacks m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic 300 x 300mm Porcelain floor tiles (Allow PC - R 250/m2) fixed with an approved GOLDSTAR 6 adhesive on plaster bedding (bedding elsewhere) according to manufacturer's instructions and flush pointed with tinted waterproof jointing compound on: Floors. grey grout 4 On floors m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9400 5 Skirting 100mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page No 88 89 R Amount348

Appears in 1 contract

Samples: Preliminaries Agreement

BILL NO. 9 TILING The Tenderer is referred to the relevant Clauses 13 GLAZING NOTE : Unless otherwise stated herein, all items in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc this bill shall be deemed to include 1:4 cement plaster backing fall into Work Group No. 150 for CPAP formula purposes TOPS, SHELVES, DOORS, MIRRORS, ETC 6mm Silvered float glass copper backed mirrors with polished edges holed for and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved chromium plated dome capped mirror screws with rubber buffers to plugs in brickwork or concrete 400 x 900 x 4mm "GG" quality polished glass mirror: Fixed to wall with vertical strips of double sided adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Wallstape. m2 Narrow widthsOne mirror per wash hand basin. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. No Carried Forward to Summary of Section No. 2 Section No. 2 ECD Building Bill No. 13 Glazing Quantity 4 Rate R Amount Item No 1 2 3 4 5 SECTION NO. 2 BILL NO. 14 PAINTWORK NOTE : Unless otherwise stated herein, all items in this bill shall be deemed to fall into Work Group No. 152 for CPAP formula purposes ON FLOATED PLASTER Prime with One coat Plascon Plaster Primer and two coats Plascon Plaster Primer on walls. On internal walls m2 Prime with One coat Plascon Plaster Primer and two coats Plascon Plaster Primer on walls. On external walls m2 ON PLASTERBOARD Prime with one coat Professional Plaster Primer and two coats Professional Evaluation Acrylic On Gypsum Ceilings and Cornices m2 One coat primer and two coats exterior quality PVA emulsion paint On fascias and bargeboards m2 ON METAL Spot priming defects in pre primed surfaces with zinc chromate primer and applying one undercoat and two coat high gloss enamel paint on steel On doors frames m2 Carried Forward Section No. 2 ECD Building Bill No. 14 Paintwork Quantity 580 24 270 32 13 Rate R Amount 6 7 Brought Forward ON WOOD Spot priming defects in pre primed surfaces with wood primer and applying one undercoat and two coat high gloss enamel paint on steel On doors m2 Three coats polyurethane semi-gloss varnish On doors m2 Carried Forward to Summary of Section No. 2 Section No. 2 ECD Building Bill No. 14 Paintwork 49 3 R R Bill Section No. 2 ECD Building SECTION SUMMARY - ECD Building Earthworks (Provisional) Concrete, Formwork and Reinforcement Masonry Waterproofing Roof Covering Carpentry and Joinery Ceilings, Partitions and Access Flooring Ironmongery Metal Work Plastering Tiling Plumbing and Drainage (Provisional) Glazing Paintwork Carried to Final Summary Section No. 2 ECD Building Page Amount 2 -8- 3 -10- 4 -11- 5 -12- 6 -15- 7 -17- 8 -22- 9 Tiling Page -24- 10 -25- 11 -26- 12 -34- 13 -35- 14 -37- R Item No 88 89 1 2 3 SECTION NO. 3 BILL NO. 1 EARTHWORKS (PROVISIONAL) NOTE : Unless otherwise stated herein, all items in this bill shall be deemed to fall into Work Group No. 104 for CPAP formula purposes SUPPLEMENTARY PREAMBLES Nature of ground The nature of the ground is assumed to be loose xxxxx material, therefore "earth", but possibly interspersed with "hard rock" or "soft rock" Carting away of excavated material Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site SITE CLEARANCE ETC EXCAVATION, FILLING, ETC Excavation in earth not exceeding 2m deep Trenches Extra over trench and hole excavations in earth for excavation in Soft rock Hard rock Carried Forward Section No. 3 Guard House Bill No. 1 Earthworks (Provisional) m3 m3 m3 Quantity Rate R AmountAmount 11 1

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING The Tenderer is referred 4 WALKWAYS (PROVISIONAL) NOTE : All excavations are measured as being in "earth" and/or filling compacted to 98% modified AASHTO density EARTHWORKS (XXXXXXX FORMULA WORK GROUP NO. 104) Open face excavations in earth to reduce levels m3 Extra over all excavations for carting away surplus material from excavations and/or stockpile on site to a dumping site to be located by the relevant Clauses Contractor m3 Extra over open face excavations in the separate document Model Preambles earth for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORKexcavations in soft rock m3 Extra over open face excavations in earth for excavations in hard rock m3 Allow for keeping all excavations entirely free from water and mud 125mm base layer of selected gravel material to comply with minimum CBR 15 and maximum PI 12, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive imported from commercial sources and compacted to plaster (plaster elsewhere)" descriptions 95% modified AASHTO density m3 Compaction of tiling on brick or concrete walls, columnsground surface under pavings, etc shall be deemed including scarifying for a depth of 150mm, breaking down over size material, adding suitable material where necessary and compact to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding 93% modified AASHTO density m2 Carried Forward Section No. 4 External Works Bill No. 4 Walkways (Provisional) Quantity 12 23 23 2 1 Item 23 156 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed 8 9 10 11 Brought Forward 25mm thick layer clean, dry, riversand layer treated with an approved adhesive weed killer at the rate of 50 gram per square metre, spread and levelled to plaster receive paving blocks (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried Tests to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 Allow a Prime Cost Amount determine the degree of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing stripscompaction, etc.: . of ground or filling No PRECAST CONCRETE (XXXXXXX FORMULA WORK GROUP NO. 112) Light grey "Xxxx MGrinaker G-Trim PRE090blocks" 9interlocking precast concrete (35 MPa) paving blocks laid with butt joints on 50mm high white PVC round edge trim fixed thick river sand bed with patent adhesive to external wall corners. sand swept into joints including preparation of ground or filling 60mm paving blocks m2 XXXXX, CHANNELS, ETC Concrete Mountable kerbing m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 4 Section No. 2 4 External Works Bill No. 9 Tiling Page No 88 89 4 Walkways (Provisional) 156 3 156 105 R AmountR

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 8 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 10 2 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 8 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 8 Tiling 5 1 10 2 10 R Section No. 2 Bill No. 9 8 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 8 Tiling Page No 88 89 83 84 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 11 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 35 5 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 11 Tiling 3 4 5 Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 11 Tiling 5 1 10 13 3 25 R Section No. 2 Bill No. 9 11 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 11 Tiling Page No 88 89 95 96 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 5 1 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 Allow a Prime Cost Amount of R250/m2 for porcelain wall tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof anti-fungal jointing compound on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 Tiling 3 4 5 6 7 8 Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 100mm High skirting. m SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 Tiling 5 1 10 2 4 R Section No. 2 Bill No. 9 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 Tiling Page No 88 89 76 77 R Amount

Appears in 1 contract

Samples: Building Agreement

BILL NO. 9 11 TILING The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2017 Edition) TENDERERS ARE TO NOTE THAT ALL WORK IS TO BE EXECUTED IN EXISTING BUILDINGS IN A COMBINATION OF NEW WORK, WORK IN PATCHES AND WORK IN SMALL QUANTITIES. SUPPLEMENTARY PREAMBLES Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding Quantity 12 2 15 3 Rate R Amount WALL TILING Allow a Prime Cost Amount of R170/m2 for ceramic tiles fixed with an approved adhesive to plaster (plaster elsewhere) and flush pointed with tinted jointing compond on: Walls. m2 Narrow widths. m2 FLOOR TILING Carried to Collection Section No. 2 Bill No. 9 11 Tiling 3 4 5 6 7 Allow a Prime Cost Amount of R250/m2 for porcelain wall tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof anti-fungal jointing compound on: Walls. m2 Narrow widths. m2 FLOOR TILING Allow a Prime Cost Amount of R170/m2 for ceramic porcelain floor tiles fixed with an approved adhesive on plaster bedding (bedding elsewhere) and flush pointed with tinted waterproof jointing compound on: Floors. m2 Narrow widths. m2 SUNDRIES Corner protectors, dividing strips, etc.: "Xxxx M-Trim PRE090" 9mm high white PVC round edge trim fixed with patent adhesive to external wall corners. m Carried to Collection Section No. 2 Bill No. 9 11 Tiling 5 1 10 2 6 R Section No. 2 Bill No. 9 11 Tiling COLLECTION Total Brought Forward from Page No. Carried Forward to Summary of Section No. 2 Section No. 2 Bill No. 9 11 Tiling Page No 88 89 94 95 R Amount

Appears in 1 contract

Samples: Building Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!