Billing of Monthly Power Costs Sample Clauses

Billing of Monthly Power Costs. For billing purposes, the amount of the minimum cost component of the Monthly Power Costs to be paid by Assignee each Month in amounts pursuant to Section 10(a) shall be billed in advance and shall be based on the then current Annual Budget.
AutoNDA by SimpleDocs

Related to Billing of Monthly Power Costs

  • Monthly Billing The electric service charge shall be computed in accordance with the monthly billing in the applicable standard service tariff. Customers receiving electric service under residential and small nonresidential schedules 1, 2, 3, 15, 23 or 23B shall be financially credited for such net energy with a cumulative kilowatt-hour credit. The credit will be deducted from the customer’s kilowatt-hour usage on the customer’s next monthly bill thus offsetting the customer’s next monthly bill at the full retail rate of the customer’s rate schedule. Customers receiving electric service under large nonresidential schedules 6, 6A, 6B, 8 or 10 must elect a compensation method to receive cumulative credits for the upcoming annualized billing period from one of the following options (large nonresidential customers must initial desired credit election): an average energy price, a seasonally differentiated energy price, or an average retail rate.

  • Recovery of Schedule Delays During Last Sixty Days of Contract Time At any time during the last sixty days of the Contract Time that the Design Professional finds that the Contractor is behind schedule per the Contract Time, as amended, the Design Professional shall notify the Contractor in writing. Within seven days of the date of the Design Professional's notice, the Contractor shall prepare and deliver to the Design Professional and Owner a written plan explaining how the Contractor intends to bring the Project back on schedule. The Contractor's plan must provide sufficient detail to allow the Design Professional and Owner to determine the proposal's feasibility.

  • Recover Copying Costs The Participating Institutions may impose a reasonable fee on the Authorized Users to cover costs of copying or printing portions of the Licensed Materials by or for the Authorized Users.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Processing Costs In addition to the Purchase Price, Buyer shall pay Processing Costs in the amount of $900.00, to be paid to Seller in cash or other readily available funds at closing. The Processing Costs are owed in addition to the Purchase Price and shall not be considered part of the Purchase Price.

  • Payment of Monthly Bills 10.3.1 SECI shall pay the amount payable under the Monthly Xxxx/Supplementary Xxxx by the Due Date to such account of the SPD, as shall have been previously notified by the SPD in accordance with Article10.3.2 (iii) below.

  • Monthly Charges Purchaser shall pay Seller monthly for the electric energy generated by the System and delivered to the Delivery Point at the $/kWh rate shown in Exhibit 1 (the “Contract Price”). The monthly payment for such energy will be equal to the applicable $/kWh rate multiplied by the number of kWh of energy generated during the applicable month, as measured by the System meter.

  • Subcontract Costs Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts.

  • Start-Up Costs 4.1.1 The Government of Ontario will provide:

  • Electricity Charges The licensee herein shall pay the electricity bills directly for energy consumed on the licensed premises and should submit original receipts to Licensor indicating that the electricity bills are paid.

Time is Money Join Law Insider Premium to draft better contracts faster.