Building Management Systems Sample Clauses

Building Management Systems. In the design of all Subtenant Improvements, Subtenant will install "Automatic Controls" for all Building management system programming and communications. Sublandlord will provide Subtenant with appropriate specifications.
AutoNDA by SimpleDocs
Building Management Systems. “BMS”) 4.35.1 The Contractor will operate and maintain BMS in accordance with the following instructions: 4.35.2 The Contractor will have day to day responsibility for the management, operation, organisation and compliance with all relevant legislation, standards or codes of practice applicable to each part of the Services including but not limited to those set out in this Specification. 4.35.3 Environmental standards in terms of temperature and other requirements will be set by the Contractor in accordance with the design of the buildings, and in accordance with the Workplace Regulations, to ensure statutorycompliance. 4.35.4 Given the complexity of a building management system installation, all staff involved in the operation of this activity will be provided with higher standards of training by the Contractor together with an understanding of the interactions between the systems and their functions. Specialists will only work on systems for which they have been trained. 4.35.5 The Contractor will use any BMS installation in a comprehensive manner, such that a live data bank of information and knowledge can be applied to the effective management of all engineering functions. 4.35.6 Operational Specifications will be produced by the Contractor within three months of the Transfer Date, based on the original design, that indicate the way in which the buildings and plant are to be controlled. The Contractor will determine the required BMS monitoring and control routines, its logical configuration and some of its physical characteristics. 4.35.7 Only trained and competent persons will be appointed by the Contractor to carry out the operation and control of this function. 4.35.1 All changes to set points and other parameters within the BMS must be agreed with BGS and written notification of these changes provided to the Estates Manager.
Building Management Systems. The original building shares a Trane Tracer Building Management System with the Addition. The new HVAC equipment Installed by Savmor at the time of the Addition construction Is controlled by this system. The operating schematics are provided In the Tracer Summit program from the Home Page from the Icon ncontrolSubmittal". "

Related to Building Management Systems

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Network Management 60.1 CLEC and CenturyLink will exchange appropriate information (e.g., network information, maintenance contact numbers, escalation procedures, and information required to comply with requirements of law enforcement and national security agencies) for network management purposes. In addition, the Parties will apply sound network management principles to alleviate or to prevent traffic congestion and to minimize fraud associated with third number billed calls, calling card calls, and other services related to this Agreement. 60.2 The Parties will employ characteristics and methods of operation that will not interfere with or impair the Parties’ networks, or the network of any third parties or Affiliated companies, connected with or involved directly in the network or facilities of CenturyLink. 60.3 CLEC shall not interfere with or impair service over any circuits, facilities or equipment of CenturyLink, its Affiliated companies, or its connecting and concurring carriers. 60.4 If CLEC causes any impairment or interference, CenturyLink shall promptly notify CLEC of the nature and location of the problem and that, unless promptly rectified, a temporary discontinuance of the use of any circuit, facility or equipment may be required. The Parties agree to work together to attempt to promptly resolve the impairment or interference. If CLEC is unable to promptly remedy, then CenturyLink may, at its option, temporarily discontinue the use of the affected circuit, facility or equipment until the impairment is remedied. 60.5 Any violation of Applicable Law or regulation regarding the invasion of privacy of any communications carried over CenturyLink’s facilities, or that creates hazards to the employees of CenturyLink or to the public, is also considered an impairment of service. 60.6 CenturyLink shall give advanced notice to CLEC of all non-scheduled maintenance or other planned network activities to be performed by CenturyLink on any Network Element, including any hardware, equipment, software, or system, providing service functionality of which CLEC has advised CenturyLink may potentially impact CLEC End Users. 60.7 The Parties shall provide notice of network changes and upgrades in accordance with 47 C.F.R. §§51.325 through 51.335. CenturyLink may discontinue any Interconnection arrangement, Telecommunications Service, or Network Element provided or required hereunder due to network changes or upgrades after providing CLEC notice as required by this Section. CenturyLink agrees to cooperate with CLEC and/or the appropriate regulatory body in any transition resulting from such discontinuation of service and to minimize the impact to customers which may result from such discontinuance of service.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Construction Management Services a. A-E may be required to review and recommend approval of submittals, shop drawings, Request for Information (RFI) and/or calculations for temporary structures such as trench shoring, false work and other temporary structural forms. b. A-E may be required to review and advise the County Representative on the overall project schedule, including staging and completion dates, duration, milestones, and interfaces. Immediately notify Representative if the proposed work schedule does not conform to the contract documents, including the plans, specifications, and permits or that may require special inspection or testing, or work stoppage. c. Review on a monthly basis the project schedule and/or Critical Path Method (CPM) schedule submitted by the Construction Contractor. Make recommendations concerning the Construction Contractor’s adherence thereto. Recommend possible solutions to scheduling problems so as to complete the project on time, within budget, and in accordance with the contract drawings and specifications. d. Review scope of work and identify potential contract change orders. Prepare independent cost estimates for any changes resulting from design revisions or change in field conditions. Prepare and recommend for approval all contract change orders. e. Evaluate the merit of any potential claims or requests for equitable adjustment submitted by the Construction Contractor. Prepare analysis of potential claims include recommendations regarding settlement of the claims. f. Assist County staff in project related issues with other Agencies, or departments, engineering and material testing support firms, CEQA consultants, utilities agencies, etc. g. Assist in community outreach meetings and media relations h. Review for acceptance/approval of Storm Water Pollution Prevention Plan (SWPPP) in accordance with the general Permit of Discharges of Storm Water Associated with Construction Activity (Construction General Permit, including dewatering/diversion plans per the State’s DeMinimus Permit).

  • Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Project. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan. 9.2.2 Developer shall prepare and submit to TxDOT and the Independent Engineer for TxDOT approval a Traffic Management Plan for managing traffic on the Project and Related Transportation Facilities after the commencement of traffic operations on any portion of the Project, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) orderly and safe movement of traffic on the Project and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with field maintenance and repair work or Renewal Work or in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions and Technical Documents concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 9.2.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project and during the Utility Adjustment Work. 9.2.4 TxDOT shall have at all times, without obligation or liability to Developer, the right 9.2.4.1 Issue Directive Letters to Developer regarding traffic management 9.2.4.2 Provide on the Project, via message signs or other means consistent with Good Industry Practice, non-Discriminatory traveler and driver information, and other public information (e.g. amber alerts), provided that the means to disseminate such information does not materially interfere with the functioning of the ETCS.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Moonlighting Employment as a physician in a professional capacity outside of what is outlined in this Agreement, whether temporary special medical activity (“TSMA”) or external moonlighting, must be approved in writing, in advance, by the Departmental Chair, Program Director and Director of Graduate Medical Education (or designee). Even if approved, professional and general liability insurance as outlined in Section 5.4 is not provided to Trainee engaged in external moonlighting. Trainee acknowledges he or she has the responsibility to obtain insurance for such engagement. TSMA and external moonlighting must be included and reported as part of Trainee's hours spent on clinical experience and education. Trainee shall not be required to engage in any outside work.

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!