Common use of Buy American Preference Clause in Contracts

Buy American Preference. The Contractor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP funded projects are produced in the United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. A bidder or offeror must complete and submit the Buy America certification included herein with their bid or offer. The Owner will reject as nonresponsive any bid or offer that does not include a completed Certificate of Buy American Compliance. CERTIFICATE OF BUY AMERICAN COMPLIANCE FOR TOTAL FACILITY (INSERT COMPLETED FORM 5 FROM REQUEST FOR BID (RFB) HERE) Certificate of Buy American Compliance for Manufactured Products (INSERT COMPLETED FORM 6 FROM REQUEST FOR BID (RFB) HERE) Exhibit 6 – General Provisions‌ SECTION 10 - DEFINITION OF TERMS 4 SECTION 20 - PROPOSAL REQUIREMENTS AND CONDITIONS 7 20-1 ADVERTISEMENT (NOTICE TO BIDDERS) 7 20-2 QUALIFICATION OF BIDDERS 7 20-3 CONTENTS OF PROPOSAL FORMS 7 20-4 ISSUANCE OF PROPOSAL FORMS. 7 20-5 INTERPRETATION OF ESTIMATED PROPOSAL QUANTITIES. 7 20-6 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE 7 20-7 PREPARATION OF PROPOSAL 8 20-8 IRREGULAR PROPOSALS 8 20-9 BID GUARANTEE 8 20-10 DELIVERY OF PROPOSAL 8 20-11 WITHDRAWAL OR REVISION OF PROPOSALS 9 20-12 PUBLIC OPENING OF PROPOSALS 9 20-13 DISQUALIFICATION OF BIDDERS 9 SECTION 30 - AWARD AND EXECUTION OF CONTRACT 10 30-1 CONSIDERATION OF PROPOSALS 10 30-2 AWARD OF CONTRACT 10 30-3 CANCELLATION OF AWARD 10 30-4 RETURN OF PROPOSAL/BID GUARANTY 10 30-5 REQUIREMENTS OF CONTRACT BONDS 10 30-6 EXECUTION OF CONTRACT 11 30-7 APPROVAL OF CONTRACT 11 30-8 FAILURE TO EXECUTE CONTRACT 11 SECTION 40 - SCOPE OF WORK 12 40-1 INTENT OF CONTRACT 12 40-2 ALTERATION OF WORK AND QUANTITIES 12 40-3 OMITTED ITEMS 12 40-4 EXTRA WORK 12 40-5 MAINTENANCE OF TRAFFIC 12 40-6 REMOVAL OF EXISTING STRUCTURES 13 40-7 RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK 13 40-8 FINAL CLEAN UP 14 SECTION 50 - CONTROL OF WORK 15 50-1 AUTHORITY OF THE ENGINEER 15 50-2 CONFORMITY WITH PLANS AND SPECIFICATIONS 15 50-3 COORDINATION OF CONTRACT, PLANS, AND SPECIFICATIONS 15 50-4 COOPERATION OF CONTRACTOR 16 50-5 COOPERATION BETWEEN CONTRACTORS 16 50-6 CONSTRUCTION LAYOUT AND STAKES 16 50-7 AUTOMATICALLY CONTROLLED EQUIPMENT 16 50-8 AUTHORITY AND DUTIES OF INSPECTORS 16 50-9 INSPECTION OF THE WORK. 17 50-10 REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK 17 50-11 LOAD RESTRICTIONS 17 50-12 MAINTENANCE DURING CONSTRUCTION 17 50-13 FAILURE TO MAINTAIN THE WORK 18 50-14 SUBSTANTIAL COMPLETION 18 50-15 PARTIAL ACCEPTANCE 18 50-16 FINAL COMPLETION/FINAL ACCEPTANCE 18 50-17 CLAIMS FOR ADJUSTMENT AND DISPUTES 19 50-18 CONTRACTOR COST REDUCTION PROPOSALS 19 SECTION 60 - CONTROL OF MATERIALS 21 60-1 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS 21 60-2 SAMPLES, TESTS, AND CITED SPECIFICATIONS 21 60-3 CERTIFICATION OF COMPLIANCE 21 60-4 PLANT INSPECTION 21 60-5 FIELD OFFICE AND LABORATORY 22 60-6 STORAGE OF MATERIALS 22 60-7 UNACCEPTABLE MATERIALS 22 60-8 OWNER-FURNISHED MATERIALS. 22 SECTION 70 - LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC 23 70-1 LAWS TO BE OBSERVED 23 70-2 PERMITS, LICENSES, AND TAXES 23 70-3 PATENTED DEVICES, MATERIALS, AND PROCESSES 23 70-4 RESTORATION OF SURFACES DISTURBED BY OTHERS 23 70-5 FEDERAL AID PARTICIPATION 23 70-6 SANITARY, HEALTH, AND SAFETY PROVISIONS 24 70-7 PUBLIC CONVENIENCE AND SAFETY 24 70-8 BARRICADES, WARNING SIGNS, AND HAZARD MARKINGS 24 70-9 USE OF EXPLOSIVES 24 70-10 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE 25 70-11 RESPONSIBILITY FOR DAMAGE CLAIMS 25 70-12 THIRD PARTY BENEFICIARY CLAUSE 25 70-13 OPENING SECTIONS OF THE WORK TO TRAFFIC 25 70-14 CONTRACTOR'S RESPONSIBILITY FOR WORK 26 70-15 CONTRACTOR'S RESPONSIBILITY FOR UTILITY SERVICE AND FACILITIES OF OTHERS 26 70-16 FURNISHING RIGHTS-OF-WAY 27 70-17 NO WAIVER OF LEGAL RIGHTS 27 70-18 ENVIRONMENTAL PROTECTION 27 70-19 ARCHAEOLOGICAL AND HISTORICAL FINDINGS 27 70-20 PERSONAL LIABILITY OF PUBLIC OFFICIALS 28 SECTION 80 - PROSECUTION AND PROGRESS 29 80-1 PRIVITY OF CONTRACT & ASSIGNMENT OF RIGHTS 29 80-2 NOTICE TO PROCEED 29 80-3 PROJECT PROGRESS SCHEDULE 29 80-4 PROGRAM MANAGEMENT SOFTWARE 29 80-5 PROSECUTION AND PROGRESS 29 80-6 LIMITATION OF OPERATIONS 30 80-7 CHARACTER OF WORKERS, METHODS, AND EQUIPMENT 30 80-8 TEMPORARY SUSPENSION OF THE WORK 30 80-9 DETERMINATION AND EXTENSION OF CONTRACT TIME 31 80-10 FAILURE TO COMPLETE ON TIME 32 80-11 DEFAULT AND TERMINATION OF CONTRACT 32 80-12 TERMINATION FOR NATIONAL EMERGENCIES 33 SECTION 90 - MEASUREMENT AND PAYMENT 34 90-1 MEASUREMENT OF QUANTITIES 34 90-2 SCOPE OF PAYMENT 35 90-3 COMPENSATION FOR ALTERED QUANTITIES 35 90-4 PAYMENT FOR OMITTED ITEMS 36 90-5 PAYMENT FOR EXTRA AND FORCE ACCOUNT WORK 36 90-6 PARTIAL PAYMENTS 37 90-7 PAYMENT WITHHELD 38 90-8 PAYMENT FOR MATERIALS ON HAND 38 90-9 ACCEPTANCE AND FINAL PAYMENT 39 SECTION 100 - CONTRACTOR QUALITY CONTROL PROGRAM 41 100-1 GENERAL 41 100-2 DESCRIPTION OF PROGRAM 41 100-3 QUALITY CONTROL ORGANIZATION 41 100-4 SUBMITTALS SCHEDULE 43 100-5 INSPECTION REQUIREMENTS 43 100-6 QUALITY CONTROL TESTING PLAN 43 100-7 DOCUMENTATION 43 100-8 CORRECTIVE ACTION REQUIREMENTS 44 100-9 SURVEILLANCE BY THE ENGINEER 44 100-10 NONCOMPLIANCE 45 SECTION 110 - METHOD OF ESTIMATING PERCENTAGE OF MATERIAL WITHIN SPECIFICATION LIMITS (PWL) 46 110-1 GENERAL 46 110-2 METHOD FOR COMPUTING PWL 46 SECTION 120 – ENVIRONMENTAL AND SAFETY PROVISIONS 52 120-1.0 ENVIRONMENTAL DEFINITIONS 52 120-2.0 ENVIRONMENTAL PROVISIONS 53 120-3.0 ASBESTOS-CONTAINING MATERIALS 55 120-4.0 ENVIRONMENTAL INDEMNITY 55 120-5.0 SAFETY PROVISIONS 56 120-6.0 SURVIVAL 56 GENERAL PROVISIONS SECTION 10 - DEFINITION OF TERMS‌ Whenever the following terms are used in these specifications, in the contract, in any documents or other instruments pertaining to construction where these specifications govern, the intent and meaning shall be interpreted as follows:

Appears in 2 contracts

Samples: Contract Agreement, Contract Agreement

AutoNDA by SimpleDocs

Buy American Preference. The Contractor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP funded projects are produced in the United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. A bidder or offeror must complete and submit the Buy America certification included herein with their bid or offer. The Owner will reject as nonresponsive any bid or offer that does not include a completed Certificate of Buy American Compliance. CERTIFICATE OF BUY AMERICAN COMPLIANCE FOR TOTAL FACILITY (INSERT COMPLETED FORM 5 FROM REQUEST FOR BID (RFB) HERE) Certificate of Buy American Compliance for Manufactured Products (INSERT COMPLETED FORM 6 FROM REQUEST FOR BID (RFB) HERE) Exhibit 6 – General Provisions‌ SECTION 10 - DEFINITION OF TERMS 4 SECTION 20 - PROPOSAL REQUIREMENTS AND CONDITIONS 7 20-1 ADVERTISEMENT (NOTICE TO BIDDERS) 7 20-2 QUALIFICATION OF BIDDERS 7 20-3 CONTENTS OF PROPOSAL FORMS 7 20-4 ISSUANCE OF PROPOSAL FORMS. FORMS 7 20-5 INTERPRETATION OF ESTIMATED PROPOSAL QUANTITIES. 7 20-6 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE 7 20-7 PREPARATION OF PROPOSAL 8 20-8 IRREGULAR PROPOSALS 8 20-9 BID GUARANTEE 8 20-10 DELIVERY OF PROPOSAL 8 20-11 WITHDRAWAL OR REVISION OF PROPOSALS 9 20-12 PUBLIC OPENING OF PROPOSALS 9 20-13 DISQUALIFICATION OF BIDDERS 9 SECTION 30 - AWARD AND EXECUTION OF CONTRACT 10 30-1 CONSIDERATION OF PROPOSALS 10 30-2 AWARD OF CONTRACT 10 30-3 CANCELLATION OF AWARD 10 30-4 RETURN OF PROPOSAL/BID GUARANTY 10 30-5 REQUIREMENTS OF CONTRACT BONDS 10 30-6 EXECUTION OF CONTRACT 11 30-7 APPROVAL OF CONTRACT 11 30-8 FAILURE TO EXECUTE CONTRACT 11 SECTION 40 - SCOPE OF WORK 12 40-1 INTENT OF CONTRACT 12 40-2 ALTERATION OF WORK AND QUANTITIES 12 40-3 OMITTED ITEMS 12 40-4 EXTRA WORK 12 40-5 MAINTENANCE OF TRAFFIC 12 40-6 REMOVAL OF EXISTING STRUCTURES 13 40-7 RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK 13 40-8 FINAL CLEAN UP 14 SECTION 50 - CONTROL OF WORK 15 50-1 AUTHORITY OF THE ENGINEER 15 50-2 CONFORMITY WITH PLANS AND SPECIFICATIONS 15 50-3 COORDINATION OF CONTRACT, PLANS, AND SPECIFICATIONS 15 50-4 COOPERATION OF CONTRACTOR 16 50-5 COOPERATION BETWEEN CONTRACTORS 16 50-6 CONSTRUCTION LAYOUT AND STAKES 16 50-7 AUTOMATICALLY CONTROLLED EQUIPMENT 16 50-8 AUTHORITY AND DUTIES OF INSPECTORS 16 50-9 INSPECTION OF THE WORK. WORK 17 50-10 REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK 17 50-11 LOAD RESTRICTIONS 17 50-12 MAINTENANCE DURING CONSTRUCTION 17 50-13 FAILURE TO MAINTAIN THE WORK 18 50-14 SUBSTANTIAL COMPLETION 18 50-15 PARTIAL ACCEPTANCE 18 50-16 FINAL COMPLETION/FINAL ACCEPTANCE 18 50-17 CLAIMS FOR ADJUSTMENT AND DISPUTES 19 50-18 CONTRACTOR COST REDUCTION PROPOSALS 19 SECTION 60 - CONTROL OF MATERIALS 21 60-1 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS 21 60-2 SAMPLES, TESTS, AND CITED SPECIFICATIONS 21 60-3 CERTIFICATION OF COMPLIANCE 21 60-4 PLANT INSPECTION 21 60-5 FIELD OFFICE AND LABORATORY 22 60-6 STORAGE OF MATERIALS 22 60-7 UNACCEPTABLE MATERIALS 22 60-8 OWNER-FURNISHED MATERIALS. 22 SECTION 70 - LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC 23 70-1 LAWS TO BE OBSERVED 23 70-2 PERMITS, LICENSES, AND TAXES 23 70-3 PATENTED DEVICES, MATERIALS, AND PROCESSES 23 70-4 RESTORATION OF SURFACES DISTURBED BY OTHERS 23 70-5 FEDERAL AID PARTICIPATION 23 70-6 SANITARY, HEALTH, AND SAFETY PROVISIONS 24 70-7 PUBLIC CONVENIENCE AND SAFETY 24 70-8 BARRICADES, WARNING SIGNS, AND HAZARD MARKINGS 24 70-9 USE OF EXPLOSIVES 24 70-10 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE 25 70-11 RESPONSIBILITY FOR DAMAGE CLAIMS 25 70-12 THIRD PARTY BENEFICIARY CLAUSE 25 70-13 OPENING SECTIONS OF THE WORK TO TRAFFIC 25 70-14 CONTRACTOR'S RESPONSIBILITY FOR WORK 26 70-15 CONTRACTOR'S RESPONSIBILITY FOR UTILITY SERVICE AND FACILITIES OF OTHERS 26 70-16 FURNISHING RIGHTS-OF-WAY 27 70-17 NO WAIVER OF LEGAL RIGHTS 27 70-18 ENVIRONMENTAL PROTECTION 27 70-19 ARCHAEOLOGICAL AND HISTORICAL FINDINGS 27 70-20 PERSONAL LIABILITY OF PUBLIC OFFICIALS OFFICIALS. 28 SECTION 80 - PROSECUTION AND PROGRESS 29 80-1 PRIVITY OF CONTRACT & ASSIGNMENT OF RIGHTS 29 80-2 NOTICE TO PROCEED 29 80-3 PROJECT PROGRESS SCHEDULE 29 80-4 PROGRAM MANAGEMENT SOFTWARE 29 80-5 PROSECUTION AND PROGRESS 29 80-6 LIMITATION OF OPERATIONS 30 80-7 CHARACTER OF WORKERS, METHODS, AND EQUIPMENT 30 80-8 TEMPORARY SUSPENSION OF THE WORK 30 80-9 DETERMINATION AND EXTENSION OF CONTRACT TIME 31 80-10 FAILURE TO COMPLETE ON TIME 32 80-11 DEFAULT AND TERMINATION OF CONTRACT 32 80-12 TERMINATION FOR NATIONAL EMERGENCIES 33 SECTION 90 - MEASUREMENT AND PAYMENT 34 90-1 MEASUREMENT OF QUANTITIES 34 90-2 SCOPE OF PAYMENT 35 90-3 COMPENSATION FOR ALTERED QUANTITIES 35 90-4 PAYMENT FOR OMITTED ITEMS 36 90-5 PAYMENT FOR EXTRA AND FORCE ACCOUNT WORK 36 90-6 PARTIAL PAYMENTS 37 90-7 PAYMENT WITHHELD 38 90-8 PAYMENT FOR MATERIALS ON HAND 38 90-9 ACCEPTANCE AND FINAL PAYMENT 39 SECTION 100 - CONTRACTOR QUALITY CONTROL PROGRAM 41 100-1 GENERAL 41 100-2 DESCRIPTION OF PROGRAM 41 100-3 QUALITY CONTROL ORGANIZATION 41 100-4 SUBMITTALS SCHEDULE 43 100-5 INSPECTION REQUIREMENTS 43 100-6 QUALITY CONTROL TESTING PLAN 43 100-7 DOCUMENTATION 43 100-8 CORRECTIVE ACTION REQUIREMENTS 44 100-9 SURVEILLANCE BY THE ENGINEER 44 100-10 NONCOMPLIANCE 45 SECTION 110 - METHOD OF ESTIMATING PERCENTAGE OF MATERIAL WITHIN SPECIFICATION LIMITS (PWL) 46 110-1 GENERAL 46 110-2 METHOD FOR COMPUTING PWL 46 SECTION 120 – ENVIRONMENTAL AND SAFETY PROVISIONS 52 120-1.0 ENVIRONMENTAL DEFINITIONS 52 120-2.0 ENVIRONMENTAL PROVISIONS 53 120-3.0 ASBESTOS-CONTAINING MATERIALS 55 120-4.0 ENVIRONMENTAL INDEMNITY 55 120-5.0 SAFETY PROVISIONS 56 120-6.0 SURVIVAL 56 GENERAL PROVISIONS SECTION 10 - DEFINITION OF TERMS‌ Whenever the following terms are used in these specifications, in the contract, in any documents or other instruments pertaining to construction where these specifications govern, the intent and meaning shall be interpreted as follows:

Appears in 1 contract

Samples: Contract Agreement

AutoNDA by SimpleDocs

Buy American Preference. (Reference: 49 USC § 50101) The Contractor Consultant agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP AIP-funded projects are produced in the United States, unless the Federal Aviation Administration FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. A bidder or offeror must complete and submit the appropriate Buy America certification included herein with their bid all bids or offeroffers on AIP funded projects. The Owner will reject as nonresponsive any bid Bids or offer offers that does are not include accompanied by a completed Certificate Buy America certification must be rejected as nonresponsive. BUY AMERICAN CERTIFICATION The Consultant agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP-funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. A bidder or offeror must submit the appropriate Buy America certification (below) with all bids or offers on AIP funded projects. Bids or offers that are not accompanied by a completed Buy America certification must be rejected as nonresponsive. Type of Certification is based on Type of Project: There are two types of Buy American Compliancecertifications. CERTIFICATE OF BUY AMERICAN COMPLIANCE FOR TOTAL FACILITY • For projects for a facility, the Certificate of Compliance Based on Total Facility (INSERT COMPLETED FORM 5 FROM REQUEST FOR BID Terminal or Building Project) must be submitted. • For all other projects, the Certificate of Compliance Based on Equipment and Materials Used on the Project (RFBNon-building construction projects such as runway or roadway construction; or equipment acquisition projects) HERE) must be submitted. ***** Certificate of Buy American Compliance for Manufactured Products Total Facility (INSERT COMPLETED FORM 6 FROM REQUEST FOR BID (RFBBuildings such as Terminal, SRE, ARFF, etc.) HERE) Exhibit 6 – General Provisions‌ SECTION 10 - DEFINITION OF TERMS 4 SECTION 20 - PROPOSAL REQUIREMENTS AND CONDITIONS 7 20-1 ADVERTISEMENT (NOTICE TO BIDDERS) 7 20-2 QUALIFICATION OF BIDDERS 7 20-3 CONTENTS OF PROPOSAL FORMS 7 20-4 ISSUANCE OF PROPOSAL FORMSAs a matter of bid responsiveness, the bidder or offeror must complete, sign, date, and submit this certification statement with their proposal. 7 20-5 INTERPRETATION OF ESTIMATED PROPOSAL QUANTITIES. 7 20-6 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE 7 20-7 PREPARATION OF PROPOSAL 8 20-8 IRREGULAR PROPOSALS 8 20-9 BID GUARANTEE 8 20-10 DELIVERY OF PROPOSAL 8 20-11 WITHDRAWAL OR REVISION OF PROPOSALS 9 20-12 PUBLIC OPENING OF PROPOSALS 9 20-13 DISQUALIFICATION OF BIDDERS 9 SECTION 30 - AWARD AND EXECUTION OF CONTRACT 10 30-1 CONSIDERATION OF PROPOSALS 10 30-2 AWARD OF CONTRACT 10 30-3 CANCELLATION OF AWARD 10 30-4 RETURN OF PROPOSAL/BID GUARANTY 10 30-5 REQUIREMENTS OF CONTRACT BONDS 10 30-6 EXECUTION OF CONTRACT 11 30-7 APPROVAL OF CONTRACT 11 30-8 FAILURE TO EXECUTE CONTRACT 11 SECTION 40 - SCOPE OF WORK 12 40-1 INTENT OF CONTRACT 12 40-2 ALTERATION OF WORK AND QUANTITIES 12 40-3 OMITTED ITEMS 12 40-4 EXTRA WORK 12 40-5 MAINTENANCE OF TRAFFIC 12 40-6 REMOVAL OF EXISTING STRUCTURES 13 40-7 RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK 13 40-8 FINAL CLEAN UP 14 SECTION 50 - CONTROL OF WORK 15 50-1 AUTHORITY OF THE ENGINEER 15 50-2 CONFORMITY WITH PLANS AND SPECIFICATIONS 15 50-3 COORDINATION OF CONTRACT, PLANS, AND SPECIFICATIONS 15 50-4 COOPERATION OF CONTRACTOR 16 50-5 COOPERATION BETWEEN CONTRACTORS 16 50-6 CONSTRUCTION LAYOUT AND STAKES 16 50-7 AUTOMATICALLY CONTROLLED EQUIPMENT 16 50-8 AUTHORITY AND DUTIES OF INSPECTORS 16 50-9 INSPECTION OF THE WORK. 17 50-10 REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK 17 50-11 LOAD RESTRICTIONS 17 50-12 MAINTENANCE DURING CONSTRUCTION 17 50-13 FAILURE TO MAINTAIN THE WORK 18 50-14 SUBSTANTIAL COMPLETION 18 50-15 PARTIAL ACCEPTANCE 18 50-16 FINAL COMPLETION/FINAL ACCEPTANCE 18 50-17 CLAIMS FOR ADJUSTMENT AND DISPUTES 19 50-18 CONTRACTOR COST REDUCTION PROPOSALS 19 SECTION 60 - CONTROL OF MATERIALS 21 60-1 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS 21 60-2 SAMPLES, TESTS, AND CITED SPECIFICATIONS 21 60-3 CERTIFICATION OF COMPLIANCE 21 60-4 PLANT INSPECTION 21 60-5 FIELD OFFICE AND LABORATORY 22 60-6 STORAGE OF MATERIALS 22 60-7 UNACCEPTABLE MATERIALS 22 60-8 OWNER-FURNISHED MATERIALS. 22 SECTION 70 - LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC 23 70-1 LAWS TO BE OBSERVED 23 70-2 PERMITS, LICENSES, AND TAXES 23 70-3 PATENTED DEVICES, MATERIALS, AND PROCESSES 23 70-4 RESTORATION OF SURFACES DISTURBED BY OTHERS 23 70-5 FEDERAL AID PARTICIPATION 23 70-6 SANITARY, HEALTH, AND SAFETY PROVISIONS 24 70-7 PUBLIC CONVENIENCE AND SAFETY 24 70-8 BARRICADES, WARNING SIGNS, AND HAZARD MARKINGS 24 70-9 USE OF EXPLOSIVES 24 70-10 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE 25 70-11 RESPONSIBILITY FOR DAMAGE CLAIMS 25 70-12 THIRD PARTY BENEFICIARY CLAUSE 25 70-13 OPENING SECTIONS OF THE WORK TO TRAFFIC 25 70-14 CONTRACTOR'S RESPONSIBILITY FOR WORK 26 70-15 CONTRACTOR'S RESPONSIBILITY FOR UTILITY SERVICE AND FACILITIES OF OTHERS 26 70-16 FURNISHING RIGHTS-OF-WAY 27 70-17 NO WAIVER OF LEGAL RIGHTS 27 70-18 ENVIRONMENTAL PROTECTION 27 70-19 ARCHAEOLOGICAL AND HISTORICAL FINDINGS 27 70-20 PERSONAL LIABILITY OF PUBLIC OFFICIALS 28 SECTION 80 - PROSECUTION AND PROGRESS 29 80-1 PRIVITY OF CONTRACT & ASSIGNMENT OF RIGHTS 29 80-2 NOTICE TO PROCEED 29 80-3 PROJECT PROGRESS SCHEDULE 29 80-4 PROGRAM MANAGEMENT SOFTWARE 29 80-5 PROSECUTION AND PROGRESS 29 80-6 LIMITATION OF OPERATIONS 30 80-7 CHARACTER OF WORKERS, METHODS, AND EQUIPMENT 30 80-8 TEMPORARY SUSPENSION OF THE WORK 30 80-9 DETERMINATION AND EXTENSION OF CONTRACT TIME 31 80-10 FAILURE TO COMPLETE ON TIME 32 80-11 DEFAULT AND TERMINATION OF CONTRACT 32 80-12 TERMINATION FOR NATIONAL EMERGENCIES 33 SECTION 90 - MEASUREMENT AND PAYMENT 34 90-1 MEASUREMENT OF QUANTITIES 34 90-2 SCOPE OF PAYMENT 35 90-3 COMPENSATION FOR ALTERED QUANTITIES 35 90-4 PAYMENT FOR OMITTED ITEMS 36 90-5 PAYMENT FOR EXTRA AND FORCE ACCOUNT WORK 36 90-6 PARTIAL PAYMENTS 37 90-7 PAYMENT WITHHELD 38 90-8 PAYMENT FOR MATERIALS ON HAND 38 90-9 ACCEPTANCE AND FINAL PAYMENT 39 SECTION 100 - CONTRACTOR QUALITY CONTROL PROGRAM 41 100-1 GENERAL 41 100-2 DESCRIPTION OF PROGRAM 41 100-3 QUALITY CONTROL ORGANIZATION 41 100-4 SUBMITTALS SCHEDULE 43 100-5 INSPECTION REQUIREMENTS 43 100-6 QUALITY CONTROL TESTING PLAN 43 100-7 DOCUMENTATION 43 100-8 CORRECTIVE ACTION REQUIREMENTS 44 100-9 SURVEILLANCE BY THE ENGINEER 44 100-10 NONCOMPLIANCE 45 SECTION 110 - METHOD OF ESTIMATING PERCENTAGE OF MATERIAL WITHIN SPECIFICATION LIMITS (PWL) 46 110-1 GENERAL 46 110-2 METHOD FOR COMPUTING PWL 46 SECTION 120 – ENVIRONMENTAL AND SAFETY PROVISIONS 52 120-1.0 ENVIRONMENTAL DEFINITIONS 52 120-2.0 ENVIRONMENTAL PROVISIONS 53 120-3.0 ASBESTOS-CONTAINING MATERIALS 55 120-4.0 ENVIRONMENTAL INDEMNITY 55 120-5.0 SAFETY PROVISIONS 56 120-6.0 SURVIVAL 56 GENERAL PROVISIONS SECTION 10 - DEFINITION OF TERMS‌ Whenever The bidder or offeror must indicate how they intend to comply with 49 USC § 50101 by selecting one of the following terms certification statements. These statements are used in these specifications, in mutually exclusive. Bidder must select one or the contract, in any documents other (i.e. not both) by inserting a checkmark () or other instruments pertaining to construction where these specifications govern, the intent and meaning shall be interpreted as followsletter “X”.  Bidder or offeror hereby certifies that it will comply with 49 USC. 50101 by:

Appears in 1 contract

Samples: Dot Agreement