Common use of Certain Project Design Deliverables Clause in Contracts

Certain Project Design Deliverables. a. Preliminary O&M Manual b. EPC Drawings and Specifications c. Interim As-built Drawings (PV system, layout, single-line, etc.) d. System Commissioning Report i. Insulation Resistance Testing (IRT) ii. DC String Combiner Box Commissioning iii. DC Re-combiner Commissioning iv. AC Distribution Commissioning v. Pile Testing vi. High Pot/VLF Testing vii. Meter Commissioning viii. Open Circuit Voltage Test ix. Flash Test\ x. Soils and resistivity Testing xi. Communications cabling xii. Factory Test Documentation e. Substantial Completion System Commissioning i. AC Distribution Commissioning ii. Transformer Commissioning iii. Pyranometer Calibration iv. Switchgear Commissioning v. Inverter Commissioing vi. DAS Commissioning vii. DC Amperage Test viii. Infrared (IR) Scanning ix. Power Factor Test f. Installation, Operation and Maintenance Manuals g. Spare Parts lists

Appears in 4 contracts

Samples: Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.)

AutoNDA by SimpleDocs

Certain Project Design Deliverables. a. Preliminary O&M Manual b. EPC Drawings and Specifications c. Interim As-built Drawings (PV system, layout, single-line, etc.) d. System Commissioning Report i. Insulation Resistance Testing (IRT) ii. DC String Combiner Box Commissioning iii. DC Re-combiner Commissioning iv. AC Distribution Commissioning v. Pile Testing vi. High Pot/VLF Testing vii. Meter Commissioning viii. Open Circuit Voltage Test ix. Flash Test\Test x. Soils and resistivity Testing xi. Communications cabling xii. Factory Test Documentation e. Substantial Completion System Commissioning i. AC Distribution Commissioning ii. Transformer Commissioning iii. Pyranometer Calibration iv. Switchgear Commissioning v. Inverter Commissioing vi. DAS Commissioning vii. DC Amperage Test viii. Infrared (IR) Scanning ix. Power Factor Test f. Installation, Operation and Maintenance Manuals g. Spare Parts lists

Appears in 2 contracts

Samples: Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.)

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!