Certain Project Design Deliverables. a. Preliminary O&M Manual b. EPC Drawings and Specifications c. Interim As-built Drawings (PV system, layout, single-line, etc.) d. System Commissioning Report i. Insulation Resistance Testing (IRT) ii. DC String Combiner Box Commissioning iii. DC Re-combiner Commissioning iv. AC Distribution Commissioning v. Pile Testing vi. High Pot/VLF Testing vii. Meter Commissioning viii. Open Circuit Voltage Test ix. Flash Test\ x. Soils and resistivity Testing xi. Communications cabling xii. Factory Test Documentation e. Substantial Completion System Commissioning i. AC Distribution Commissioning ii. Transformer Commissioning iii. Pyranometer Calibration iv. Switchgear Commissioning v. Inverter Commissioing vi. DAS Commissioning vii. DC Amperage Test viii. Infrared (IR) Scanning ix. Power Factor Test f. Installation, Operation and Maintenance Manuals g. Spare Parts lists
Appears in 4 contracts
Samples: Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.)
Certain Project Design Deliverables. a. Preliminary O&M Manual
b. EPC Drawings and Specifications
c. Interim As-built Drawings (PV system, layout, single-line, etc.)
d. System Commissioning Report
i. Insulation Resistance Testing (IRT)
ii. DC String Combiner Box Commissioning
iii. DC Re-combiner Commissioning
iv. AC Distribution Commissioning
v. Pile Testing
vi. High Pot/VLF Testing
vii. Meter Commissioning
viii. Open Circuit Voltage Test
ix. Flash Test\Test
x. Soils and resistivity Testing
xi. Communications cabling
xii. Factory Test Documentation
e. Substantial Completion System Commissioning
i. AC Distribution Commissioning
ii. Transformer Commissioning
iii. Pyranometer Calibration
iv. Switchgear Commissioning
v. Inverter Commissioing
vi. DAS Commissioning
vii. DC Amperage Test
viii. Infrared (IR) Scanning
ix. Power Factor Test
f. Installation, Operation and Maintenance Manuals
g. Spare Parts lists
Appears in 2 contracts