Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Manufacturing and Marketing Rights The Company has not granted rights to manufacture, produce, assemble, license, market, or sell its products to any other person and is not bound by any agreement that affects the Company's exclusive right to develop, manufacture, assemble, distribute, market, or sell its products.
Transition Planning The AGENCY will be responsible for the development of the student’s Transition Plan, which begins upon entry and is completed prior to the student’s exit.
Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35
Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.
Gross Beta Flags A = Result acceptable, Bias <= +/- 50% with a statistically positive result at two standard deviations (Result/Uncertainty > 2, i.e., the range encompassing the result, plus or minus the total uncertainty at two standard deviations, does not include zero). N = Result not acceptable, Bias > +/- 50% or the reported result is not statistically positive at two standard deviations (Result/Uncertainty <= 2, i.e., the range encompassing the result, plus or minus the total uncertainty at two standard deviations, includes zero).
Přetrvající platnost This Section 3 “
Procurement of Goods and Works Except as ADB may otherwise agree, Goods and Works shall only be procured on the basis of the methods of procurement set forth below:
Procurement of Goods and Services (a) If the HSP is subject to the procurement provisions of the BPSAA, the HSP will abide by all directives and guidelines issued by the Management Board of Cabinet that are applicable to the HSP pursuant to the BPSAA. (b) If the HSP is not subject to the procurement provisions of the BPSAA, the HSP will have a procurement policy in place that requires the acquisition of supplies, equipment or services valued at over $25,000 through a competitive process that ensures the best value for funds expended. If the HSP acquires supplies, equipment or services with the Funding it will do so through a process that is consistent with this policy.