Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 If the British Council requests a change to the scope or provision of the Services: 7.2.1 the Supplier shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) the likely time required to implement the change; (ii) any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) any other impact of the change on the terms of this Agreement. 7.2.2 if, following receipt of the Supplier’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 if the British Council wishes the Supplier to proceed with the change, the Supplier shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 If the Supplier requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier to proceed with the change, the Supplier shall do so, following a variation of this Agreement in writing in accordance with clause 27.

Appears in 24 contracts

Samples: Professional Services, Professional Services, Professional Services

AutoNDA by SimpleDocs

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 . If the British Council requests a change to the scope or provision of the Services: 7.2.1 : the Supplier shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) : the likely time required to implement the change; (ii) ; any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) and any other impact of the change on the terms of this Agreement. 7.2.2 . if, following receipt of the Supplier’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 and if the British Council wishes the Supplier to proceed with the change, the Supplier shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 . If the Supplier requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier to proceed with the change, the Supplier shall do so, following a variation of this Agreement in writing in accordance with clause 27.

Appears in 17 contracts

Samples: Professional Services, Supply Agreement, Professional Services

Change Control. 7.1 If either party wishes to change the scope or provision of the ServicesServices (provided that any such change shall not fall outside the scope of the initial procurement exercise carried out, to which this Agreement relates), it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 If the British Council requests a change to the scope or provision of the Services: 7.2.1 the Supplier Service Provider shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) the likely time required to implement the change; (ii) any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) any other impact of the change on the terms of this Agreement.Agreement or any Order Contract; 7.2.2 if, following receipt of the SupplierService Provider’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this AgreementAgreement or Order Contract; and 7.2.3 if the British Council wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement and/or Order Contract to take account of the change following which this Agreement and/or Order Contract shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 2726. 7.3 If the Supplier Service Provider requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so, following a variation of this Agreement and/or Order Contract in writing in accordance with clause 2726.

Appears in 5 contracts

Samples: Framework Agreement for Consultancy Services, Framework Agreement for the Purchase of Hotel Services, Framework Agreement for Consultancy Services

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 . If the British Council requests a change to the scope or provision of the Services: 7.2.1 : the Supplier Consultant shall, within a reasonable time (and in any event not more than fourteen ten (1410) calendar days Working Days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) : the likely time required to implement the change; (ii) ; any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) and any other impact of the change on the terms of this Agreement. 7.2.2 . if, following receipt of the SupplierConsultant’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 and if the British Council wishes the Supplier Consultant to proceed with the change, the Supplier Consultant shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 25.1. If the Supplier Consultant requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier Consultant to proceed with the change, the Supplier Consultant shall do so, following a variation of this Agreement in writing in accordance with clause 2725.1.

Appears in 3 contracts

Samples: Consultancy Services Agreement, Consultancy Services Agreement, Consultancy Services Agreement

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 If the British Council Ecorys UK requests a change to the scope or provision of the Services: 7.2.1 the Supplier Service Provider shall, within a reasonable time (and in any event not more than fourteen ten (1410) calendar days Working Days after receipt of the British CouncilEcorys UK’s request), provide a written estimate to the British Council Ecorys UK of: (i) the likely time required to implement the change; (ii) any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) any other impact of the change on the terms of this Agreement.Agreement or any Order Contract; 7.2.2 if, following receipt of the SupplierService Provider’s written estimate submitted in accordance with clause 7.2.1, the British Council Ecorys UK does not wish to proceed, there shall be no change to this AgreementAgreement or Order Contract; and 7.2.3 if the British Council Ecorys UK wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement and/or Order Contract to take account of the change following which this Agreement and/or Order Contract shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 2726.1. 7.3 If the Supplier Service Provider requests a change to the scope or provision of the Services, it shall send such request to the British Council Ecorys UK in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council Ecorys UK shall withhold or give its consent to such change in its sole discretion. If the British Council Ecorys UK wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so, following a variation of this Agreement and/or Order Contract in writing in accordance with clause 2726.1.

Appears in 3 contracts

Samples: Framework Agreement for the Provision of Services, Framework Agreement for the Provision of Services, Framework Agreement for the Provision of Services

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 . If the British Council requests a change to the scope or provision of the Services: 7.2.1 : the Supplier shall, within a reasonable time (and in any event not more than fourteen ten (1410) calendar days Working Days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) : the likely time required to implement the change; (ii) ; any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) and any other impact of the change on the terms of this Agreement. 7.2.2 . if, following receipt of the Supplier’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 and if the British Council wishes the Supplier to proceed with the change, the Supplier shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 24.1. If the Supplier requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier to proceed with the change, the Supplier shall do so, following a variation of this Agreement in writing in accordance with clause 2724.1.

Appears in 2 contracts

Samples: Consultancy Services Agreement, Consultancy Services Agreement

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 . If the British Council requests a change to the scope or provision of the Services: 7.2.1 : the Supplier shall, within a reasonable time (and in any event not more than fourteen ten (1410) calendar days Working Days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) : the likely time required to implement the change; (ii) ; any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) and any other impact of the change on the terms of this Agreement. 7.2.2 . if, following receipt of the Supplier’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 and if the British Council wishes the Supplier to proceed with the change, the Supplier shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 25.1. If the Supplier requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier to proceed with the change, the Supplier shall do so, following a variation of this Agreement in writing in accordance with clause 2725.1.

Appears in 2 contracts

Samples: Consultancy Services Agreement, Professional Services

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 . If the British Council requests a change to the scope or provision of the Services: 7.2.1 : the Supplier Consultant shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) : the likely time required to implement the change; (ii) ; any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) and any other impact of the change on the terms of this Agreement. 7.2.2 . if, following receipt of the SupplierConsultant’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 and if the British Council wishes the Supplier Consultant to proceed with the change, the Supplier Consultant shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 26. If the Supplier Consultant requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier Consultant to proceed with the change, the Supplier Consultant shall do so, following a variation of this Agreement in writing in accordance with clause 2726.

Appears in 2 contracts

Samples: Consulting Agreement, Consultancy Agreement

AutoNDA by SimpleDocs

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 If the British Council Ecorys UK requests a change to the scope or provision of the Services: 7.2.1 the Supplier Service Provider shall, within a reasonable time (and in any event not more than fourteen ten (1410) calendar days Working Days after receipt of the British CouncilEcorys UK’s request), provide a written estimate to the British Council of:Ecorys UK of:‌ (i) the likely time required to implement the change; (ii) any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) any other impact of the change on the terms of this Agreement.Agreement or any Order Contract; 7.2.2 if, following receipt of the SupplierService Provider’s written estimate submitted in accordance with clause 7.2.1, the British Council Ecorys UK does not wish to proceed, there shall be no change to this AgreementAgreement or Order Contract; and 7.2.3 if the British Council Ecorys UK wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement and/or Order Contract to take account of the change following which this Agreement and/or Order Contract shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 2726.1. 7.3 If the Supplier Service Provider requests a change to the scope or provision of the Services, it shall send such request to the British Council Ecorys UK in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council Ecorys UK shall withhold or give its consent to such change in its sole discretion. If the British Council Ecorys UK wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so, following a variation of this Agreement and/or Order Contract in writing in accordance with clause 2726.1.

Appears in 1 contract

Samples: Framework Agreement

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 If the British Council requests a change to the scope or provision of the Services: 7.2.1 the Supplier Service Provider shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) the likely time required to implement the change; (ii) any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) any other impact of the change on the terms of this Agreement. 7.2.2 if, following receipt of the SupplierService Provider’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 if the British Council wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 2725. 7.3 If the Supplier Service Provider requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier Service Provider to proceed with the change, the Supplier Service Provider shall do so, following a variation of this Agreement in writing in accordance with clause 2725.

Appears in 1 contract

Samples: Professional Services

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 If the British Council requests a change to the scope or provision of the Services: 7.2.1 the Supplier Consultant shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) the likely time required to implement the change; (ii) any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) any other impact of the change on the terms of this Agreement. 7.2.2 if, following receipt of the SupplierConsultant’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 if the British Council wishes the Supplier Consultant to proceed with the change, the Supplier Consultant shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 If the Supplier Consultant requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier Consultant to proceed with the change, the Supplier Consultant shall do so, following a variation of this Agreement in writing in accordance with clause 27.

Appears in 1 contract

Samples: Consultancy Agreement

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 . If the British Council requests a change to the scope or provision of the Services: 7.2.1 : the Supplier shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) : the likely time required to implement the change; (ii) ; any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) and any other impact of the change on the terms of this Agreement. 7.2.2 . if, following receipt of the Supplier’s written estimate submitted in accordance with clause 7.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 and if the British Council wishes the Supplier to proceed with the change, the Supplier shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 26. If the Supplier requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier to proceed with the change, the Supplier shall do so, following a variation of this Agreement in writing in accordance with clause 2726.

Appears in 1 contract

Samples: Supplier Agreement

Change Control. 7.1 If either party wishes to change the scope or provision of the Services, it shall submit details of the requested change to the other in writing and such change shall only be implemented if agreed in accordance with the remainder of this clause. 7.2 . If the British Council requests a change to the scope or provision of the Services: 7.2.1 : the Supplier shall, within a reasonable time (and in any event not more than fourteen (14) calendar days after receipt of the British Council’s request), provide a written estimate to the British Council of: (i) : the likely time required to implement the change; (ii) ; any reasonable variations to the Charges arising directly as a result of the proposed change; and (iii) and any other impact of the change on the terms of this Agreement. 7.2.2 . if, following receipt of the Supplier’s written estimate submitted in accordance with clause 7.2.117.2.1, the British Council does not wish to proceed, there shall be no change to this Agreement; and 7.2.3 and if the British Council wishes the Supplier to proceed with the change, the Supplier shall do so after agreement on the necessary variations to the Charges, the Services and any other relevant terms of this Agreement to take account of the change following which this Agreement shall be varied by the parties setting out in writing, and signing, the agreed changes in accordance with clause 27. 7.3 37. If the Supplier requests a change to the scope or provision of the Services, it shall send such request to the British Council in writing, accompanied by a written statement of the matters referred to in clause 7.2.117.2.1, and the British Council shall withhold or give its consent to such change in its sole discretion. If the British Council wishes the Supplier to proceed with the change, the Supplier shall do so, following a variation of this Agreement in writing in accordance with clause 2737.

Appears in 1 contract

Samples: Professional Services

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!