Change in Law Affecting Transportation to Designated Disposal Sites. In the event of a Change in Law that m aterially and directly (1) affects the method and m anner in w hich Incinerator Residuals may be transported to a D esignated Disposal Site; (2) affects access to pickup Incinerator Residuals at the Incineration Facilities; (3) affects access to deliver the Incinerator Residuals at a Designated D isposal Site; or (4) imposes a Tax upon the transportation, treatment or disposal of Incinerator Residuals at a Designated Disposal Site, the Lessee shall be entitled to performance, schedule and price relief as provided in Sections 15.2 and 15.5, subject to the duty to mitigate as provided in subsection (F) of this Section.
AutoNDA by SimpleDocs
Change in Law Affecting Transportation to Designated Disposal Sites. In the event of a Change in Law that materially and directly (1) affects the method and manner in w hich System Residuals may be transported to a Designated Disposal Site; (2) affects access to pickup System Residuals at the Plant; (3) affects access to deliver the System Residuals at a Designated Disposal Site; or (4) imposes a Tax upon the transportation, treatment or disposal of System Residuals at a Designated Disposal Site, the Compan y shall be entitled to performance, schedule and price relief as provided in Section 14. 2, subject to the duty to mitigate as provided in subsection (F) of this Section.

Related to Change in Law Affecting Transportation to Designated Disposal Sites

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • PROHIBITED DISPOSAL AREAS Purchaser shall not place organic debris in the following areas:  Within 50 feet of a cross drain culvert.  Within 100 feet of a live stream, or wetland.  On road subgrades, or excavation and embankment slopes.  On slopes greater than 45%.  Within the operational area for cable landings where debris may shift or roll.  On locations where brush can fall into the ditch or onto the road surface.  Against standing timber.

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Obligation to Notify Owner of Existing Hazardous Materials The Contractor shall immediately notify the Owner and the Design Professional, both orally and in writing, of the presence and location of any physical evidence of, or information regarding the presence of Hazardous Materials at the Site of which it becomes aware. If the Contractor encounters Hazardous Materials on the Site the Contractor shall (i) immediately stop performance of Work or that portion of the Work affected by or affecting such Hazardous Materials; (ii) secure the contaminated area against intrusion; (iii) not disturb or remove the Hazardous Materials; (iv) not proceed, or allow any subcontractor or supplier to proceed, with any Work or other activities in the area affected by such Hazardous Materials until such materials have been properly remediated and until directed in writing to do so by the Owner; and, (v) take any other steps necessary to protect life and health and the surrounding environment. The Contractor shall be entitled to adjustment of the Contract Time and the Contract Sum pursuant to Section 5, Part 2 of these General Conditions in order to compensate for the impact of any required demolition, re-work, shutdown, delay, protection of work, disruption, and start-up resulting from the encountering of such Hazardous Materials on the Site for which the Contractor is not responsible.

  • Occupational First Aid Requirements and Courses (a) The Union and the Employer agree that First Aid Regulations made pursuant to the Workers' Compensation Act shall be fully complied with.

  • Notification Regarding Letting/Transfer If the Allottee lets out or transfers the said Apartment, the Allottee shall immediately notify the Promoter/Association (upon formation) of the tenant’s/transferee's address and telephone number.

  • Dangerous Goods, Special Wastes, Pesticides and Harmful Substances Where employees are required to work with or are exposed to any dangerous good, special waste, pesticide or harmful substance, the Employer shall ensure that the employees are adequately trained in the identification, safe handling, use, storage, and/or disposal of same.

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • No Storing Hazardous Articles Not to keep or store any offensive, combustible, obnoxious, hazardous or dangerous articles in the said Apartment, the Common Areas, and the Building.

  • Closet/Urinal Requirements 6.1 Employees Closets Urinals 1-5 1 Nil 6-10 1 1 11-20 2 2 21-35 3 4 36-50 4 6 51-75 5 7 76-100 6 8