Change in Protocol Sample Clauses

Change in Protocol. There will be no alterations in the protocol without prior agreement between the Sponsor’s representative, the IRB/EC, and the Investigator. Protocol amendments will be submitted to Regulatory Authorities and to the Investigators for submission and reviewed by IRB/ECs.
AutoNDA by SimpleDocs

Related to Change in Protocol

  • CORRECTIVE MEASURE The contractor shall repair any deficiencies in excess of the performance guideline.

  • CHANGE IN CLASSIFICATION SPECIFICATIONS Section 1. The Employer shall notify the Union of intended classification studies.

  • Unbundled Network Terminating Wire (UNTW) 2.8.3.1 UNTW is unshielded twisted copper wiring that is used to extend circuits from an intra-building network cable terminal or from a building entrance terminal to an individual End User’s point of demarcation. It is the final portion of the Loop that in multi-subscriber configurations represents the point at which the network branches out to serve individual subscribers.

  • Change in Classification A change in classification shall not alter a nurse’s accrued seniority for purposes of accrual of benefits or placement in the wage schedule.

  • Corrective Measures If the Participating Generator fails to meet or maintain the requirements set forth in this Agreement and/or the CAISO Tariff, the CAISO shall be permitted to take any of the measures, contained or referenced in the CAISO Tariff, which the CAISO deems to be necessary to correct the situation.

  • System for Award Management (XXX) Requirement Alongside a signed copy of this Agreement, Grantee will provide Florida Housing with a XXX.xxx proof of registration and Commercial and Government Entity (CAGE) number. Grantee will continue to maintain an active XXX registration with current information at all times during which it has an active award under this Agreement.

  • Acceptable Estimating System The Contractor shall maintain the acceptable status of their Estimating System and submit updates to the current status, if applicable

  • Correction of Errors Contractor shall perform, at its own cost and expense and without reimbursement from the District, any work necessary to correct errors or omissions which are caused by the Contractor’s failure to comply with the standard of care required herein.

  • Classification Changes When the University determines that a revision of a class specification for positions covered by this agreement is needed, and such revision affects the collective bargaining unit designation, the University shall notify AFSCME in writing of the proposed change. AFSCME shall notify the University, in writing, within fifteen (15) days of receipt of the proposed changes, of any comments it has concerning the proposed changes or of its desire to discuss the proposed changes.

  • Construction Change Directive A written order prepared and issued by the District, the Construction Manager, and/or the Architect and signed by the District and the Architect, directing a change in the Work.

Time is Money Join Law Insider Premium to draft better contracts faster.