Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 3 contracts
Samples: Office Lease (NetSpend Holdings, Inc.), Office Lease (NetSpend Holdings, Inc.), Office Lease (NetSpend Holdings, Inc.)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes requested by Tenant to, and deviations from, the Approved Construction Documents Plan (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including All Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work over the Finish Allowance (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the LeaseLease after the expiration of applicable notice and cure periods.
Appears in 2 contracts
Samples: Office Lease (GP Investments Acquisition Corp.), Office Lease (Rimini Street, Inc.)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 30 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 30 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Within 30 days of Tenant’s right to take possession receipt of the Expansion SpaceLandlord’s invoice, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 1 contract
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Second Expansion Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 1 contract
Samples: Office Lease (Gainsco Inc)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay up to fifty percent (50%) of any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion SpacePremises, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when duedue after the presentation of Landlord’s invoice, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 1 contract
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Design Plans or the Construction Documents once prepared (each, a “Change Order”), including any (ia) omission, removal, alteration or other modification of any portion of the Landlord WorkWork above and beyond that described or specified in the Design Plans attached hereto, (iib) additional architectural or engineering services, (iiic) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (ivd) cancellation or modification of supply or fabrication orders. Except Tenant has designated Xxxx Xxxxx and Xxx Xxxxxxx as otherwise expressly provided in this Work Letterthe representatives of Tenant who are authorized to request a Change Order, all and Landlord will not approve any Change Order unless submitted or signed by one of them. All costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work above the Budgeted Amount (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 15 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to shall prepay any projected Cost Overruns within 10 15 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion SpacePremises, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default a Monetary Default under the Lease.
Appears in 1 contract
Samples: Office Lease (Wells Mid-Horizon Value-Added Fund I LLC)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided In the event Tenant requests any changes, change orders or modifications to the Construction Documents and/or the Approved Construction Documents (which Landlord subsequently approves) which increase the cost to construct the Landlord Work above the final agreed turn-key buildout described in this Work Letterthe Final Space Plan (“Cost Overruns”), all costs Tenant shall pay such increased cost to Landlord, plus an amount equal to three percent (3%) of the amount of such Cost Overruns (to compensate Landlord for its time and efforts in connection with such Change Orders) (the “Supervision Fee”)), immediately upon Landlord’s request therefor, and, in any event, prior to the date Landlord causes the Contractor to commence construction of the Landlord Work. If such Change Orders delay Landlord’s completion of the Landlord Work in excess of set forth on the Construction Allowance including Change Orders requested by Final Space Plan, then such delay shall constitute a “Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost OverrunsDelay”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns and Supervision Fee is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion SpacePremises, Tenant shall pay Landlord the entire amount of all Cost OverrunsOverruns and Supervision Fee, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns Overruns, Supervision Fee or the cost of any Change Order shall constitute an event of default under the Lease. In no event shall Landlord be obligated to pay for any of Tenant’s furniture, computer systems, telephone systems, equipment, telecom wiring or infrastructure, audio/visual systems, alarm systems or personal property any kind which may or may not be depicted on the Construction Documents and/or the Approved Construction Documents, and all such items shall be paid for by Tenant. Tenant’s early entry rights are set forth in Section 3.C of the Lease.
Appears in 1 contract
Change Orders and Cost Overruns. Landlord’s Written approval of Landlord and Tenant is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Substitution Space Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion Substitution Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease (following the expiration of any applicable notice and cure period provided in the Lease, as amended hereby).
Appears in 1 contract
Samples: Ninth Modification of Office Lease (Westwood Holdings Group Inc)
Change Orders and Cost Overruns. LandlordCPS’s and Tenant’s written approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord CPS which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at either Landlord’s or CPS’s election, Landlord may require Tenant to shall prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for samesame (subject to reconciliation between the parties, in case of any underpayment or overpayment by Tenant, once the actual total costs of construction are determined). Landlord CPS may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease, as modified by the Eleventh Modification, subject to applicable notice and cure periods.
Appears in 1 contract
Samples: Eleventh Modification of Office Lease (Westwood Holdings Group Inc)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 business days of receipt of Landlord’s invoicewritten demand, together with documentation supporting such Cost Overrun. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 business days of receipt of Landlord’s invoice for samewritten demand, together with documentation supporting such Cost Overrun. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion SpacePremises, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the LeaseLease if such failure continues for five (5) days following Tenant’s receipt of Landlord’s written notice of such failure.
Appears in 1 contract
Change Orders and Cost Overruns. LandlordCPS’s and Tenant’s written approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord CPS which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at either Landlord’s or CPS’s election, Landlord may require Tenant to shall prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for samesame (subject to reconciliation between the parties, in case of any underpayment or overpayment by Tenant, once the actual total costs of construction are determined). Landlord CPS may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease, as modified by the Sixteenth Modification, subject to applicable notice and cure periods.
Appears in 1 contract
Samples: Sixteenth Modification of Office Lease (Westwood Holdings Group Inc)
Change Orders and Cost Overruns. Landlord’s approval (not to be unreasonably withheld, conditioned or delayed) is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work over the Construction Allowance (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion SpacePremises, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease, subject to the cure period specified in Article 18 of the Lease.
Appears in 1 contract
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work LetterConstruction Agreement, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) | of Cost Overruns is received. On or before the Second Expansion Space Commencement Date, and as a condition to Tenant’s right to take possession of the Second Expansion Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 1 contract
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Expansion Space Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Expansion Space Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Expansion Space Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Expansion Space Work until such payment (or prepayment) of Cost Overruns is received. On or before the Expansion Space Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion Space, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease, as modified by the First Amendment.
Appears in 1 contract
Samples: Office Lease (CSR PLC)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all All changes to, and deviations from, the Approved Construction Documents at the direction of Tenant (each, a “"Change Order”"), including any (i) omission, removal, alteration or other modification direction of Tenant to omit any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders, and (v) removal or alteration of any portion of the Work, must be approved in advance in writing by Landlord. Change Orders requested by Tenant and approved by Landlord which increase the cost of the Work shall be paid by Tenant within 15 days of receipt of Landlord's invoice therefor (which payment may be required by Landlord prior to commencing construction). Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “"Cost Overruns”") shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s 's invoice. In addition, at Landlord’s 's election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 5 days of receipt of Landlord’s invoice for same's invoice. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession date of the Expansion SpaceSubstantial Completion, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s 's failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 1 contract
Samples: Office Lease (Infonow Corp /)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. , Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion SpacePremises, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 1 contract
Samples: Office Lease (CSR PLC)
Change Orders and Cost Overruns. Landlord’s approval is required in advance of all changes to, and deviations from, the Approved Construction Documents (each, a “Change Order”), including any (i) omission, removal, alteration or other modification of any portion of the Landlord Work, (ii) additional architectural or engineering services, (iii) changes to materials, whether building standard materials, specially ordered materials, or specially fabricated materials, or (iv) cancellation or modification of supply or fabrication orders. Except as otherwise expressly provided in this Work Letter, all costs of the Landlord Work in excess of the Construction Allowance including Change Orders requested by Tenant and approved by Landlord which increase the cost of the Landlord Work (collectively, “Cost Overruns”) shall be paid by Tenant to Landlord within 10 days of receipt of Landlord’s invoice. In addition, at Landlord’s election, Landlord may require Tenant to prepay any projected Cost Overruns within 10 days of receipt of Landlord’s invoice for same. Landlord may stop or decline to commence all or any portion of the Landlord Work until such payment (or prepayment) of Cost Overruns is received. On or before the Commencement Date, and as a condition to Tenant’s right to take possession of the Expansion SpacePremises, Tenant shall pay Landlord the entire amount of all Cost Overruns, less any prepaid amounts. Tenant’s failure to pay, when due, any Cost Overruns or the cost of any Change Order shall constitute an event of default under the Lease.
Appears in 1 contract