RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.
Securing Physical Facilities DST shall maintain systems located in DST facilities that host Fund Data or provide services under the Agreement in an environment that is designed to be physically secure and to allow access only to authorized individuals. A secure environment includes the availability of onsite security personnel on a 24 x 7 basis or equivalent means of monitoring locations supporting the delivery of services under the Agreement.
Environmentally Preferable Procurement Policy The Environmentally Preferable Procurement Policy, along with a brief policy description, is located on the City’s website at the following link: xxxx://xxx.xxxxxxxxx.xxx/esd/natural-energy-resources/epp.htm. Environmental procurement policies and activities related to the completion of any Work will include, whenever practicable, but are not limited to: The use of recycled and/or recyclable products in daily operations (i.e. 30%, 50%, 100% PCW paper, chlorine process free, triclosan free hand cleaner, etc.); The use of energy-star compliant equipment; The use of alternative fuel and hybrid vehicles, and implementation of protocols aimed at increasing the efficiency of vehicle operation; The implementation of internal waste reduction and reuse protocol(s); and Water and resource conservation activities within facilities, including bans on individual serving bottled water and the use of compostable food service products.
NO HARDSTOP/PASSIVE LICENSE MONITORING Unless an Authorized User is otherwise specifically advised to the contrary in writing at the time of order and prior to purchase, Contractor hereby warrants and represents that the Product and all Upgrades do not and will not contain any computer code that would disable the Product or Upgrades or impair in any way its operation based on the elapsing of a period of time, exceeding an authorized number of copies, advancement to a particular date or other numeral, or other similar self-destruct mechanisms (sometimes referred to as “time bombs,” “time locks,” or “drop dead” devices) or that would permit Contractor to access the Product to cause such disablement or impairment (sometimes referred to as a “trap door” device). Contractor agrees that in the event of a breach or alleged breach of this provision that Authorized User shall not have an adequate remedy at law, including monetary damages, and that Authorized User shall consequently be entitled to seek a temporary restraining order, injunction, or other form of equitable relief against the continuance of such breach, in addition to any and all remedies to which Authorized User shall be entitled.
Generic Generic drugs must be substituted where applicable in order for the insurance provisions to apply.
Regulatory Activities Beginning on the Effective Date and to the extent UGNX remains the Lead Development Party with respect to a particular territory, subject to and in accordance with the terms and conditions of this Agreement and the requirements of Applicable Laws, UGNX, shall: (a) use Commercially Reasonable Efforts to file (or have filed) all Regulatory Filings with respect to the Licensed Products in the Field in order to obtain Marketing Approvals in each country in the Territory and the European Territory (or to obtain the European Centralized Approval in the European Core Territory) and in order to obtain Pricing and/or Reimbursement Approvals in the Profit Share Territory; (b) respond in a timely fashion to requests for data and information from Regulatory Authorities with respect to the Licensed Products in the Field in the Territory and the European Territory; and (c) meet with officials of the Regulatory Authorities at such times as may be requested by such Regulatory Authorities with respect to the Core Development Activities (“Regulatory Activities”), provided that KHK will have primary responsibility for obtaining, and UGNX shall provide all assistance reasonably requested by KHK, in relation to Pricing and/or Reimbursement Approvals for the Licensed Products in the Field in the European Territory. For the avoidance of doubt, UGNX will be responsible for obtaining, and KHK will provide all assistance reasonably requested by UGNX, in relation to Pricing and/or Reimbursement Approvals, if any, for the Licensed Products in the Field in the Profit Share Territory as part of the UGNX Core Development Activities, it being understood that the costs incurred by UGNX in connection with such activities will be shared equally (50/50). All such Regulatory Activities will be conducted in a manner consistent with the Core Development Plan and coordinated by the JSC in accordance with Article 3. Without limiting the applicability of the foregoing and the remainder of this Article 5, UGNX shall interface with the applicable Regulatory Authority(ies) and, through the JDC, shall keep KHK reasonably informed of all material events and developments occurring in the course of the Regulatory Activities, including scheduled UGNX regulatory strategy discussions and meetings with Regulatory Authorities in the Territory and the European Territory relating to the Licensed Products in the Field.
Hepatitis B Vaccine Where the Hospital identifies high risk areas where employees are exposed to Hepatitis B, the Hospital will provide, at no cost to the employees, a Hepatitis B vaccine.
Third Party Components The Products and Services may contain third party components (including open source software) subject to separate license agreements. To the limited extent a third party license expressly supersedes this XXXX, such third party license governs Customer’s use of that third party component.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.