Chimney liners Clause Samples

The 'Chimney liners' clause defines the requirements and standards for the installation, maintenance, or repair of chimney liners within a property. Typically, this clause specifies the type of materials to be used, compliance with local building codes, and responsibilities for ensuring the liner is in safe, working condition. For example, it may require that any new or replacement liner be made of stainless steel or another approved material and be installed by a licensed professional. The core function of this clause is to ensure the safe operation of chimneys, prevent fire hazards, and clarify responsibility for compliance, thereby protecting both property and occupants.
Chimney liners. Repair or in-kind replacement of chimney liners provided that the work does not affect the exterior of the chimney.

Related to Chimney liners

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Dressing Rooms 42.1 Adequate dressing rooms with standard size lockers and sitting areas shall be provided if the physical facilities permit.

  • Lockers Where employees are required to change their uniforms in the course of their normal duties, and where space is available, lockers, which can be locked, shall be provided.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)