Cleaning and swabbing Sample Clauses

Cleaning and swabbing. If dirt or other foreign material enters the pipe, it shall be removed, and the interior of the pipe surface swabbed with a 1 to 5% sodium hypochlorite (NaOCl) disinfecting solution. If in the opinion of North Park Water or its designated representative, the foreign material in the pipe will not be removed by preliminary flushing activities, the interior of the pipe shall be cleaned using mechanical means at no additional cost to North Park Water and then swabbed as described above.
AutoNDA by SimpleDocs

Related to Cleaning and swabbing

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Cleaning and Maintenance 7.8.1 To keep all parts of the Leasehold Area clean and tidy;

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Watering C.10.1. The Contractor shall water lawns, flowers, shrubs, and trees to provide for moisture penetration to a depth of 7 centimeters. If natural precipitation is sufficient to fulfill this requirement, the Contractor may request the COR's permission to suspend watering to avoid too much water in the soil.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Training and Orientation (a) No employee shall be required to work on any job or operate any piece of equipment until he/she has received proper training and instruction.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.