Cleaning Systems Sample Clauses

Cleaning Systems. On base piping for on and offline compressor water wash system Water wash skid Water storage tank and freeze protection Capability to heat water to 180°F (82°C) Skid enclosure Single skid for multiple units
AutoNDA by SimpleDocs
Cleaning Systems. 8.1.12.1 On-Line and Off-Line Compressor Water Wash 8.1.12.1.1 On–Line Manifold and Nozzles

Related to Cleaning Systems

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Building Systems The term "Building Systems" means all systems serving the Building in general, including, but not limited to, the fire/life safety, electrical, plumbing, HVAC, including all components thereof and related equipment, including any distribution systems or equipment existing within the Premises.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Landscaping 3.9.1 All plant material shall conform to the Canadian Nursery Landscape Association’s Canadian Nursery Stock Standard (ninth edition or newer). 3.9.2 There shall be an opaque wood fence or masonry wall at least 1.8 metres tall along the eastern property line extending the length of the surface parking area and access to the underground parking area as generally shown on Schedule B. 3.9.3 Prior to the issuance of a Development Permit, the Developer agrees to provide Landscape Plan that comply with the provisions of this section. The Landscape Plan shall be prepared by a Landscape Architect (a full member, in good standing with Canadian Society of Landscape Architects) and comply with all provisions of this section. 3.9.4 Prior to issuance of the first Occupancy Permit the Developer shall submit to the Development Officer a letter prepared by a member in good standing of the Canadian Society of Landscape Architects certifying that all landscaping has been completed according to the terms of this Development Agreement. 3.9.5 Notwithstanding Section 3.9.4, where the weather and time of year do not allow the completion of the outstanding landscape works prior to the issuance of the Occupancy Permit, the Developer may supply a security deposit in the amount of 110 percent of the estimated cost to complete the landscaping. The cost estimate is to be prepared by a member in good standing of the Canadian Society of Landscape Architects. The security shall be in favour of the Municipality and shall be in the form of a certified cheque or automatically renewing, irrevocable letter of credit issued by a chartered bank. The security shall be returned to the Developer only upon completion of the work as described herein and illustrated on the Schedules, and as approved by the Development Officer. Should the Developer not complete the landscaping within twelve months of issuance of the Occupancy Permit, the Municipality may use the deposit to complete the landscaping as set out in this section of the Agreement. The Developer shall be responsible for all costs in this regard exceeding the deposit. The security deposit or unused portion of the security deposit shall be returned to the Developer upon completion of the work and its certification. 3.9.6 All landscape areas designed to be installed upon any portion of the building must be supported by documentation from a Structural Engineer indicating that the building design is able to support any required drainage or additional weight caused by the landscaped area.

  • Elevators Landlord shall provide passenger elevator service during normal business hours to Tenant in common with Landlord and all other tenants. Landlord shall provide limited passenger service at other times, except in case of an emergency.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • CLEANING UP 4.15.1 Before commencement of any on-site activities, Contractor is required to prepare and submit to the Project Manager a Construction Site Waste Reduction Plan. A sample plan is available at: xxxx://xxx.xxx.xxxxx.xx.xx/dec/wastediv/recycling/CandD.htm . Failure to comply with this provision or a failure to comply with the plan itself will result in withholding of general conditions’ money from the contractor’s monthly requisition until Contractor has rectified the situation and is in full compliance with these provisions. 4.15.2 The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At the completion of the Work he shall remove all his waste materials and rubbish from and about. the Project as well as all his tools, construction equipment, machinery and surplus materials and shall leave the premises in a clean and satisfactory condition. 4.15.3 If the Contractor fails to clean up at the completion of the Work, the State may do so as provided in Paragraph 3.4 and the cost thereof shall be charged to the Contractor.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.